{"title":"考虑随机突发事件的配电系统分布式稳健顺序负载恢复","authors":"Yangwu Shen, Feifan Shen, Heping Jin, Ziqian Li, Zhongchu Huang, Yunyun Xie","doi":"10.1049/gtd2.13155","DOIUrl":null,"url":null,"abstract":"<p>Natural disasters would destroy power grids and lead to blackouts. To enhance resilience of distribution systems, the sequential load restoration strategy can be adopted to restore outage portions using a sequence of control actions, such as switch on/off, load pickup, distributed energy resource dispatch etc. However, the traditional strategy may be unable to restore the distribution system in extreme weather events due to random sequential contingencies during the restoration process. To address this issue, this paper proposes a distributionally robust sequential load restoration strategy to determine restoration actions. Firstly, a novel multi-time period and multi-zone contingency occurrence uncertainty set is constructed to model spatial and temporal nature of sequential line contingencies caused by natural disasters. Then, a distributionally robust load restoration model considering uncertain line contingency probability distribution is formulated to maximize the expected restored load amount with respect to the worst-case line contingency probability distribution. Case studies were carried out on the modified IEEE 123-node system. Simulation results show that the proposed distributionally robust sequential load restoration strategy can produce a more resilient load restoration strategy against random sequential contingencies. Moreover, as compared with the conventional robust restoration strategy, the proposed strategy yields a less conservative restoration solution.</p>","PeriodicalId":13261,"journal":{"name":"Iet Generation Transmission & Distribution","volume":"18 18","pages":"2885-2896"},"PeriodicalIF":2.0000,"publicationDate":"2024-08-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13155","citationCount":"0","resultStr":"{\"title\":\"Distributionally robust sequential load restoration of distribution system considering random contingencies\",\"authors\":\"Yangwu Shen, Feifan Shen, Heping Jin, Ziqian Li, Zhongchu Huang, Yunyun Xie\",\"doi\":\"10.1049/gtd2.13155\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Natural disasters would destroy power grids and lead to blackouts. To enhance resilience of distribution systems, the sequential load restoration strategy can be adopted to restore outage portions using a sequence of control actions, such as switch on/off, load pickup, distributed energy resource dispatch etc. However, the traditional strategy may be unable to restore the distribution system in extreme weather events due to random sequential contingencies during the restoration process. To address this issue, this paper proposes a distributionally robust sequential load restoration strategy to determine restoration actions. Firstly, a novel multi-time period and multi-zone contingency occurrence uncertainty set is constructed to model spatial and temporal nature of sequential line contingencies caused by natural disasters. Then, a distributionally robust load restoration model considering uncertain line contingency probability distribution is formulated to maximize the expected restored load amount with respect to the worst-case line contingency probability distribution. Case studies were carried out on the modified IEEE 123-node system. Simulation results show that the proposed distributionally robust sequential load restoration strategy can produce a more resilient load restoration strategy against random sequential contingencies. Moreover, as compared with the conventional robust restoration strategy, the proposed strategy yields a less conservative restoration solution.</p>\",\"PeriodicalId\":13261,\"journal\":{\"name\":\"Iet Generation Transmission & Distribution\",\"volume\":\"18 18\",\"pages\":\"2885-2896\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2024-08-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13155\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iet Generation Transmission & Distribution\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13155\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iet Generation Transmission & Distribution","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13155","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
Distributionally robust sequential load restoration of distribution system considering random contingencies
Natural disasters would destroy power grids and lead to blackouts. To enhance resilience of distribution systems, the sequential load restoration strategy can be adopted to restore outage portions using a sequence of control actions, such as switch on/off, load pickup, distributed energy resource dispatch etc. However, the traditional strategy may be unable to restore the distribution system in extreme weather events due to random sequential contingencies during the restoration process. To address this issue, this paper proposes a distributionally robust sequential load restoration strategy to determine restoration actions. Firstly, a novel multi-time period and multi-zone contingency occurrence uncertainty set is constructed to model spatial and temporal nature of sequential line contingencies caused by natural disasters. Then, a distributionally robust load restoration model considering uncertain line contingency probability distribution is formulated to maximize the expected restored load amount with respect to the worst-case line contingency probability distribution. Case studies were carried out on the modified IEEE 123-node system. Simulation results show that the proposed distributionally robust sequential load restoration strategy can produce a more resilient load restoration strategy against random sequential contingencies. Moreover, as compared with the conventional robust restoration strategy, the proposed strategy yields a less conservative restoration solution.
期刊介绍:
IET Generation, Transmission & Distribution is intended as a forum for the publication and discussion of current practice and future developments in electric power generation, transmission and distribution. Practical papers in which examples of good present practice can be described and disseminated are particularly sought. Papers of high technical merit relying on mathematical arguments and computation will be considered, but authors are asked to relegate, as far as possible, the details of analysis to an appendix.
The scope of IET Generation, Transmission & Distribution includes the following:
Design of transmission and distribution systems
Operation and control of power generation
Power system management, planning and economics
Power system operation, protection and control
Power system measurement and modelling
Computer applications and computational intelligence in power flexible AC or DC transmission systems
Special Issues. Current Call for papers:
Next Generation of Synchrophasor-based Power System Monitoring, Operation and Control - https://digital-library.theiet.org/files/IET_GTD_CFP_NGSPSMOC.pdf