{"title":"考虑管道损坏渗漏和盾构隧道施工综合影响的地面沉降和管道变形规律研究","authors":"","doi":"10.1016/j.trgeo.2024.101367","DOIUrl":null,"url":null,"abstract":"<div><p>A pipeline with long-term “hidden leakage” will greatly reduce the stability of the ground between the pipeline and tunnel in the process of tunneling through existing pipelines in unsaturated soil. Excessive settlement of the surrounding strata and pipelines can occur when the shield excavation face approaches below a pipeline, which can lead to engineering accidents. This study is based on a self-developed model experimental system for tunneling through an existing pipeline with a double-line tunnel shield. The ground settlement and pipeline deformation caused by shield construction with small-scale and no leakages are investigated. An experimental study is conducted and the accuracy of the results is verified through a comparison with theoretical solutions. The results demonstrate that there is a significant increase in ground settlement and pipeline deformation under the influence of leakage water. It is also determined that the displacement field generated by the excavation of a double-line tunnel is not simply a superposition of the displacement field generated by the excavation of a single-line tunnel. The repeated disturbances caused by the excavation of a double-line tunnel significantly influences the redistribution of the displacement field. Additionally, a three-dimensional (3D) model of shield construction considering the influence of pipeline leakage is established. This study discusses the ground settlement and pipeline deformation patterns caused by changes in the vertical and horizontal leakage diffusion ranges. The computational results indicate that the diffusion depth of a leakage is the primary factor controlling the extent of settlement.</p></div>","PeriodicalId":56013,"journal":{"name":"Transportation Geotechnics","volume":null,"pages":null},"PeriodicalIF":4.9000,"publicationDate":"2024-09-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study on the Rules of Ground Settlement and Pipeline Deformation Considering the Combined Effects of Pipeline Damage Leakage and Shield Tunneling Construction\",\"authors\":\"\",\"doi\":\"10.1016/j.trgeo.2024.101367\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>A pipeline with long-term “hidden leakage” will greatly reduce the stability of the ground between the pipeline and tunnel in the process of tunneling through existing pipelines in unsaturated soil. Excessive settlement of the surrounding strata and pipelines can occur when the shield excavation face approaches below a pipeline, which can lead to engineering accidents. This study is based on a self-developed model experimental system for tunneling through an existing pipeline with a double-line tunnel shield. The ground settlement and pipeline deformation caused by shield construction with small-scale and no leakages are investigated. An experimental study is conducted and the accuracy of the results is verified through a comparison with theoretical solutions. The results demonstrate that there is a significant increase in ground settlement and pipeline deformation under the influence of leakage water. It is also determined that the displacement field generated by the excavation of a double-line tunnel is not simply a superposition of the displacement field generated by the excavation of a single-line tunnel. The repeated disturbances caused by the excavation of a double-line tunnel significantly influences the redistribution of the displacement field. Additionally, a three-dimensional (3D) model of shield construction considering the influence of pipeline leakage is established. This study discusses the ground settlement and pipeline deformation patterns caused by changes in the vertical and horizontal leakage diffusion ranges. The computational results indicate that the diffusion depth of a leakage is the primary factor controlling the extent of settlement.</p></div>\",\"PeriodicalId\":56013,\"journal\":{\"name\":\"Transportation Geotechnics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.9000,\"publicationDate\":\"2024-09-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transportation Geotechnics\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2214391224001880\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Geotechnics","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2214391224001880","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Study on the Rules of Ground Settlement and Pipeline Deformation Considering the Combined Effects of Pipeline Damage Leakage and Shield Tunneling Construction
A pipeline with long-term “hidden leakage” will greatly reduce the stability of the ground between the pipeline and tunnel in the process of tunneling through existing pipelines in unsaturated soil. Excessive settlement of the surrounding strata and pipelines can occur when the shield excavation face approaches below a pipeline, which can lead to engineering accidents. This study is based on a self-developed model experimental system for tunneling through an existing pipeline with a double-line tunnel shield. The ground settlement and pipeline deformation caused by shield construction with small-scale and no leakages are investigated. An experimental study is conducted and the accuracy of the results is verified through a comparison with theoretical solutions. The results demonstrate that there is a significant increase in ground settlement and pipeline deformation under the influence of leakage water. It is also determined that the displacement field generated by the excavation of a double-line tunnel is not simply a superposition of the displacement field generated by the excavation of a single-line tunnel. The repeated disturbances caused by the excavation of a double-line tunnel significantly influences the redistribution of the displacement field. Additionally, a three-dimensional (3D) model of shield construction considering the influence of pipeline leakage is established. This study discusses the ground settlement and pipeline deformation patterns caused by changes in the vertical and horizontal leakage diffusion ranges. The computational results indicate that the diffusion depth of a leakage is the primary factor controlling the extent of settlement.
期刊介绍:
Transportation Geotechnics is a journal dedicated to publishing high-quality, theoretical, and applied papers that cover all facets of geotechnics for transportation infrastructure such as roads, highways, railways, underground railways, airfields, and waterways. The journal places a special emphasis on case studies that present original work relevant to the sustainable construction of transportation infrastructure. The scope of topics it addresses includes the geotechnical properties of geomaterials for sustainable and rational design and construction, the behavior of compacted and stabilized geomaterials, the use of geosynthetics and reinforcement in constructed layers and interlayers, ground improvement and slope stability for transportation infrastructures, compaction technology and management, maintenance technology, the impact of climate, embankments for highways and high-speed trains, transition zones, dredging, underwater geotechnics for infrastructure purposes, and the modeling of multi-layered structures and supporting ground under dynamic and repeated loads.