"帕尔杜比采 - 斯特布洛娃铁路现代化:拉贝河上的新钢桥"

ce/papers Pub Date : 2024-09-11 DOI:10.1002/cepa.3060
Ing. Jan Mitlöhner
{"title":"\"帕尔杜比采 - 斯特布洛娃铁路现代化:拉贝河上的新钢桥\"","authors":"Ing. Jan Mitlöhner","doi":"10.1002/cepa.3060","DOIUrl":null,"url":null,"abstract":"<p>The construction of a new double-track steel railway arch bridge over the Elbe river, which replaced the original single-track bridge from 1966, has significantly increased the capacity, speed, and smoothness of railway traffic in Pardubice. This 140-meter-long, three-span bridge was realized as part of the modernization and double-tracking of the Pardubice - Hradec Králové line between 2021-2024. Its construction, coupled with the provisional use of the original bridge, represents a remarkable engineering feat</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":"7 3-4","pages":"33-37"},"PeriodicalIF":0.0000,"publicationDate":"2024-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"“Modernization of Railway Track Pardubice –Stéblová: New steel bridge over Labe river”\",\"authors\":\"Ing. Jan Mitlöhner\",\"doi\":\"10.1002/cepa.3060\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The construction of a new double-track steel railway arch bridge over the Elbe river, which replaced the original single-track bridge from 1966, has significantly increased the capacity, speed, and smoothness of railway traffic in Pardubice. This 140-meter-long, three-span bridge was realized as part of the modernization and double-tracking of the Pardubice - Hradec Králové line between 2021-2024. Its construction, coupled with the provisional use of the original bridge, represents a remarkable engineering feat</p>\",\"PeriodicalId\":100223,\"journal\":{\"name\":\"ce/papers\",\"volume\":\"7 3-4\",\"pages\":\"33-37\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ce/papers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3060\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3060","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

易北河上新建的双轨钢拱铁路桥取代了 1966 年的单轨桥,大大提高了帕尔杜比采的铁路运输能力、速度和平稳性。这座 140 米长的三跨桥是 2021-2024 年间帕尔杜比采至赫拉德茨-克拉洛韦线路现代化和双轨化工程的一部分。它的建造,加上原桥的临时使用,是一项了不起的工程壮举
本文章由计算机程序翻译,如有差异,请以英文原文为准。
“Modernization of Railway Track Pardubice –Stéblová: New steel bridge over Labe river”

The construction of a new double-track steel railway arch bridge over the Elbe river, which replaced the original single-track bridge from 1966, has significantly increased the capacity, speed, and smoothness of railway traffic in Pardubice. This 140-meter-long, three-span bridge was realized as part of the modernization and double-tracking of the Pardubice - Hradec Králové line between 2021-2024. Its construction, coupled with the provisional use of the original bridge, represents a remarkable engineering feat

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信