{"title":"关于 \"Power-to-X \"最佳选址的预可行性研究:丹麦能源系统实验","authors":"Jasmin Søgaard-Deakin, George Xydis","doi":"10.1016/j.egyr.2024.08.003","DOIUrl":null,"url":null,"abstract":"Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.","PeriodicalId":11798,"journal":{"name":"Energy Reports","volume":null,"pages":null},"PeriodicalIF":4.7000,"publicationDate":"2024-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system\",\"authors\":\"Jasmin Søgaard-Deakin, George Xydis\",\"doi\":\"10.1016/j.egyr.2024.08.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.\",\"PeriodicalId\":11798,\"journal\":{\"name\":\"Energy Reports\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.7000,\"publicationDate\":\"2024-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energy Reports\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1016/j.egyr.2024.08.003\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Reports","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1016/j.egyr.2024.08.003","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system
Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.
期刊介绍:
Energy Reports is a new online multidisciplinary open access journal which focuses on publishing new research in the area of Energy with a rapid review and publication time. Energy Reports will be open to direct submissions and also to submissions from other Elsevier Energy journals, whose Editors have determined that Energy Reports would be a better fit.