{"title":"乌克兰住房公积金能源供应的结构性变化","authors":"Vasyl Serdiuk, Serhii Pavlovskyi, Serhii Rudyk","doi":"10.31649/2311-1429-2024-1-145-152","DOIUrl":null,"url":null,"abstract":"The purpose of the article is to study the problems of maintaining the housing stock in the conditions of structural changes in the energy supply of the housing stock and new construction in Ukraine. The analysis of the loss of power generation capacities of Ukraine due to the war unleashed by Russia is presented, which indicates the loss of 50% of power generation capacities and the destruction of thermal power plants, thermal power plants, and transformer substations. \nIt is shown that the main challenges affecting the energy supply of the residential complex were Ukraine's forced refusal from 2024 to import natural gas and the declared transition from 2024 to electric heating of new construction objects. \nIt has been shown that the indicators of the regulatory requirements for the thermal resistance of the building envelope, in accordance with the requirements put into effect in 2022 DBN B.2.6-31:2021 \"Thermal insulation and energy efficiency of buildings\" only came close to the indicators of European countries, which were adopted almost 15 years ago, which is not acceptable, since residential buildings account for 33% or 17.04 million toe. total final energy consumption. \nDuring the next 5-10 years, it is planned to invest Sh15 billion in the construction of new renewable energy power plants in Ukraine. A new player will appear on the country's electricity market - an operator of an energy storage facility (\"UZE Operator\"). Its activities will be related to the operation of installations, energy storage and the selection of such UZE electricity for the purpose of using it for its own needs and storing and further releasing electricity into the network.","PeriodicalId":221366,"journal":{"name":"Modern technology, materials and design in construction","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"STRUCTURAL CHANGES IN THE ENERGY SUPPLY OF THE HOUSING FUND OF UKRAINE\",\"authors\":\"Vasyl Serdiuk, Serhii Pavlovskyi, Serhii Rudyk\",\"doi\":\"10.31649/2311-1429-2024-1-145-152\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of the article is to study the problems of maintaining the housing stock in the conditions of structural changes in the energy supply of the housing stock and new construction in Ukraine. The analysis of the loss of power generation capacities of Ukraine due to the war unleashed by Russia is presented, which indicates the loss of 50% of power generation capacities and the destruction of thermal power plants, thermal power plants, and transformer substations. \\nIt is shown that the main challenges affecting the energy supply of the residential complex were Ukraine's forced refusal from 2024 to import natural gas and the declared transition from 2024 to electric heating of new construction objects. \\nIt has been shown that the indicators of the regulatory requirements for the thermal resistance of the building envelope, in accordance with the requirements put into effect in 2022 DBN B.2.6-31:2021 \\\"Thermal insulation and energy efficiency of buildings\\\" only came close to the indicators of European countries, which were adopted almost 15 years ago, which is not acceptable, since residential buildings account for 33% or 17.04 million toe. total final energy consumption. \\nDuring the next 5-10 years, it is planned to invest Sh15 billion in the construction of new renewable energy power plants in Ukraine. A new player will appear on the country's electricity market - an operator of an energy storage facility (\\\"UZE Operator\\\"). Its activities will be related to the operation of installations, energy storage and the selection of such UZE electricity for the purpose of using it for its own needs and storing and further releasing electricity into the network.\",\"PeriodicalId\":221366,\"journal\":{\"name\":\"Modern technology, materials and design in construction\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Modern technology, materials and design in construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31649/2311-1429-2024-1-145-152\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modern technology, materials and design in construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31649/2311-1429-2024-1-145-152","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

文章的目的是研究在乌克兰住房和新建筑能源供应结构变化的条件下维持住房存量的问题。文章分析了俄罗斯发动的战争对乌克兰发电能力造成的损失,指出发电能力损失了 50%,热电厂、火电厂和变电站遭到破坏。报告显示,影响住宅区能源供应的主要挑战是乌克兰被迫从 2024 年起拒绝进口天然气,以及宣布从 2024 年起新建筑的供暖将转为电供暖。根据 2022 年 DBN B.2.6-31:2021 "建筑物的隔热和能效 "生效的要求,建筑围护结构热阻的法规要求指标仅接近欧洲国家的指标,而欧洲国家的指标是在近 15 年前通过的,这是不允许的,因为住宅建筑占最终能源消耗总量的 33%,即 1704 万平方英尺。在未来 5-10 年内,乌克兰计划投资 150 亿先令建设新的可再生能源发电厂。乌克兰电力市场将出现一个新的参与者--储能设施运营商("UZE 运营商")。该运营商的业务将涉及设备运行、能源储存、选择 UZE 电力以满足自身需求、储存并进一步向电网释放电力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
STRUCTURAL CHANGES IN THE ENERGY SUPPLY OF THE HOUSING FUND OF UKRAINE
The purpose of the article is to study the problems of maintaining the housing stock in the conditions of structural changes in the energy supply of the housing stock and new construction in Ukraine. The analysis of the loss of power generation capacities of Ukraine due to the war unleashed by Russia is presented, which indicates the loss of 50% of power generation capacities and the destruction of thermal power plants, thermal power plants, and transformer substations. It is shown that the main challenges affecting the energy supply of the residential complex were Ukraine's forced refusal from 2024 to import natural gas and the declared transition from 2024 to electric heating of new construction objects. It has been shown that the indicators of the regulatory requirements for the thermal resistance of the building envelope, in accordance with the requirements put into effect in 2022 DBN B.2.6-31:2021 "Thermal insulation and energy efficiency of buildings" only came close to the indicators of European countries, which were adopted almost 15 years ago, which is not acceptable, since residential buildings account for 33% or 17.04 million toe. total final energy consumption. During the next 5-10 years, it is planned to invest Sh15 billion in the construction of new renewable energy power plants in Ukraine. A new player will appear on the country's electricity market - an operator of an energy storage facility ("UZE Operator"). Its activities will be related to the operation of installations, energy storage and the selection of such UZE electricity for the purpose of using it for its own needs and storing and further releasing electricity into the network.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信