超长深埋隧道岩爆应力特征研究

IF 3.1 3区 工程技术 Q2 CONSTRUCTION & BUILDING TECHNOLOGY
Chun Luo, Shishu Zhang, Bihua Tang, Jun Chen, Chonglin Yin, Huayun Li
{"title":"超长深埋隧道岩爆应力特征研究","authors":"Chun Luo, Shishu Zhang, Bihua Tang, Jun Chen, Chonglin Yin, Huayun Li","doi":"10.3390/buildings14082298","DOIUrl":null,"url":null,"abstract":"As a unique geological hazard in a high-geo-stress environment, rockburst happens with strong suddenness, randomness, and destructiveness, but the mechanism of its occurrence in a deep-buried tunnel in a high-geo-stress environment needs further study. Based on the analyses of the stress field of the rockburst section of Ping’an Tunnel, which is over-long and deep-buried, the occurrence mechanism of rockburst is figured out. Furtherly, the intensity and location of rockburst are predicted by using the rockburst criterion. Results show that there exists large compressive stress at the side wall of the tunnel, which is the main cause of rockburst. Under a high-geo-stress condition, due to the existence of unfavorable factors like structural planes, high intensity rockburst is likely to happen in the middle of the tunnel face after the sudden release of original rock stress. Arranging stress-releasing holes in the rockburst section can effectively reduce the possibility of rockburst by releasing the original rock stress in advance. The research results can deepen the understanding of the mechanism of rockburst in a high-geo-stress environment and provide scientific basis for the prevention and control of rockburst in similar engineering projects.","PeriodicalId":48546,"journal":{"name":"Buildings","volume":null,"pages":null},"PeriodicalIF":3.1000,"publicationDate":"2024-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Stress Characteristics of Rockburst in Over-Length Deep-Buried Tunnel\",\"authors\":\"Chun Luo, Shishu Zhang, Bihua Tang, Jun Chen, Chonglin Yin, Huayun Li\",\"doi\":\"10.3390/buildings14082298\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As a unique geological hazard in a high-geo-stress environment, rockburst happens with strong suddenness, randomness, and destructiveness, but the mechanism of its occurrence in a deep-buried tunnel in a high-geo-stress environment needs further study. Based on the analyses of the stress field of the rockburst section of Ping’an Tunnel, which is over-long and deep-buried, the occurrence mechanism of rockburst is figured out. Furtherly, the intensity and location of rockburst are predicted by using the rockburst criterion. Results show that there exists large compressive stress at the side wall of the tunnel, which is the main cause of rockburst. Under a high-geo-stress condition, due to the existence of unfavorable factors like structural planes, high intensity rockburst is likely to happen in the middle of the tunnel face after the sudden release of original rock stress. Arranging stress-releasing holes in the rockburst section can effectively reduce the possibility of rockburst by releasing the original rock stress in advance. The research results can deepen the understanding of the mechanism of rockburst in a high-geo-stress environment and provide scientific basis for the prevention and control of rockburst in similar engineering projects.\",\"PeriodicalId\":48546,\"journal\":{\"name\":\"Buildings\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":3.1000,\"publicationDate\":\"2024-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Buildings\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.3390/buildings14082298\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Buildings","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.3390/buildings14082298","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

岩爆作为高地应力环境下特有的地质灾害,其发生具有很强的突发性、随机性和破坏性,但其在高地应力环境下深埋隧道中的发生机理还需要进一步研究。基于对平安隧道超长深埋岩爆段应力场的分析,探讨了岩爆的发生机理。此外,还利用岩爆准则预测了岩爆的强度和位置。结果表明,隧道侧壁存在较大的压应力,这是导致岩爆的主要原因。在高地应力条件下,由于结构平面等不利因素的存在,原岩应力突然释放后,隧道面中部容易发生高强度岩爆。在岩爆段布置应力释放孔,通过提前释放原岩应力,可有效降低岩爆发生的可能性。该研究成果可加深对高地应力环境下岩爆机理的认识,为类似工程的岩爆防治提供科学依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on Stress Characteristics of Rockburst in Over-Length Deep-Buried Tunnel
As a unique geological hazard in a high-geo-stress environment, rockburst happens with strong suddenness, randomness, and destructiveness, but the mechanism of its occurrence in a deep-buried tunnel in a high-geo-stress environment needs further study. Based on the analyses of the stress field of the rockburst section of Ping’an Tunnel, which is over-long and deep-buried, the occurrence mechanism of rockburst is figured out. Furtherly, the intensity and location of rockburst are predicted by using the rockburst criterion. Results show that there exists large compressive stress at the side wall of the tunnel, which is the main cause of rockburst. Under a high-geo-stress condition, due to the existence of unfavorable factors like structural planes, high intensity rockburst is likely to happen in the middle of the tunnel face after the sudden release of original rock stress. Arranging stress-releasing holes in the rockburst section can effectively reduce the possibility of rockburst by releasing the original rock stress in advance. The research results can deepen the understanding of the mechanism of rockburst in a high-geo-stress environment and provide scientific basis for the prevention and control of rockburst in similar engineering projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Buildings
Buildings Multiple-
CiteScore
3.40
自引率
26.30%
发文量
1883
审稿时长
11 weeks
期刊介绍: BUILDINGS content is primarily staff-written and submitted information is evaluated by the editors for its value to the audience. Such information may be used in articles with appropriate attribution to the source. The editorial staff considers information on the following topics: -Issues directed at building owners and facility managers in North America -Issues relevant to existing buildings, including retrofits, maintenance and modernization -Solution-based content, such as tips and tricks -New construction but only with an eye to issues involving maintenance and operation We generally do not review the following topics because these are not relevant to our readers: -Information on the residential market with the exception of multifamily buildings -International news unrelated to the North American market -Real estate market updates or construction updates
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信