上海虚拟电厂博弈论应用案例研究

Weifeng Shen, Yaru Hu, Jiamei Lyu
{"title":"上海虚拟电厂博弈论应用案例研究","authors":"Weifeng Shen, Yaru Hu, Jiamei Lyu","doi":"10.54254/2754-1169/101/20231624","DOIUrl":null,"url":null,"abstract":"This paper is a case study about virtual power plants in Shanghai. In this paper, the background of forming virtual power plants in China was analyzed first. Next, it is about the current situation of Chinas electricity market. Afterward, game theory was applied to form a model between consumers and the plant owners. At last, the paper analyzed the reasons why virtual power plants in Shanghai still have quite a few problems in comparison with those in South Australia. Through the analysis of the different development statuses of virtual power plants in Shanghai and South Australia, it can be seen that the development of virtual power plants in China still has a long way to go, and great efforts need to be made in terms of technical support and exploration of customers. The meaning of this whole paper is that it could raise the awareness of society and the government to pay more attention to the development of virtual power plants in Shanghai. Hopefully, many other cities will soon start the construction of their local virtual power plants and thus contribute to saving electricity in the future.","PeriodicalId":104305,"journal":{"name":"Advances in Economics, Management and Political Sciences","volume":"17 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case Study on the Application of Game Theory in Virtual Power Plants in Shanghai\",\"authors\":\"Weifeng Shen, Yaru Hu, Jiamei Lyu\",\"doi\":\"10.54254/2754-1169/101/20231624\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper is a case study about virtual power plants in Shanghai. In this paper, the background of forming virtual power plants in China was analyzed first. Next, it is about the current situation of Chinas electricity market. Afterward, game theory was applied to form a model between consumers and the plant owners. At last, the paper analyzed the reasons why virtual power plants in Shanghai still have quite a few problems in comparison with those in South Australia. Through the analysis of the different development statuses of virtual power plants in Shanghai and South Australia, it can be seen that the development of virtual power plants in China still has a long way to go, and great efforts need to be made in terms of technical support and exploration of customers. The meaning of this whole paper is that it could raise the awareness of society and the government to pay more attention to the development of virtual power plants in Shanghai. Hopefully, many other cities will soon start the construction of their local virtual power plants and thus contribute to saving electricity in the future.\",\"PeriodicalId\":104305,\"journal\":{\"name\":\"Advances in Economics, Management and Political Sciences\",\"volume\":\"17 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Economics, Management and Political Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54254/2754-1169/101/20231624\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Economics, Management and Political Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54254/2754-1169/101/20231624","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文是关于上海虚拟电厂的案例研究。本文首先分析了中国形成虚拟电厂的背景。其次,分析了中国电力市场的现状。然后,运用博弈论在消费者和电厂业主之间建立了一个模型。最后,本文分析了上海虚拟电厂与南澳大利亚虚拟电厂相比仍存在不少问题的原因。通过对上海和南澳虚拟电厂不同发展状况的分析,可以看出中国虚拟电厂的发展还有很长的路要走,需要在技术支持和用户挖掘方面下大力气。整篇文章的意义在于,它可以唤起社会和政府对上海虚拟电厂发展的重视。希望其他许多城市也能尽快启动本地虚拟电厂的建设,从而为未来节约用电做出贡献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Case Study on the Application of Game Theory in Virtual Power Plants in Shanghai
This paper is a case study about virtual power plants in Shanghai. In this paper, the background of forming virtual power plants in China was analyzed first. Next, it is about the current situation of Chinas electricity market. Afterward, game theory was applied to form a model between consumers and the plant owners. At last, the paper analyzed the reasons why virtual power plants in Shanghai still have quite a few problems in comparison with those in South Australia. Through the analysis of the different development statuses of virtual power plants in Shanghai and South Australia, it can be seen that the development of virtual power plants in China still has a long way to go, and great efforts need to be made in terms of technical support and exploration of customers. The meaning of this whole paper is that it could raise the awareness of society and the government to pay more attention to the development of virtual power plants in Shanghai. Hopefully, many other cities will soon start the construction of their local virtual power plants and thus contribute to saving electricity in the future.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信