Rusul Latteef Naji, Hesham El-badry, Ahmed Ezzat Abdel-Rahman
{"title":"避免鹅卵形泄洪道中洪水射流造成翻斗式墩台侵蚀的最佳滑道坡度调整方案","authors":"Rusul Latteef Naji, Hesham El-badry, Ahmed Ezzat Abdel-Rahman","doi":"10.13189/cea.2024.120439","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":36986,"journal":{"name":"Civil Engineering and Architecture","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimal Chute-slope Adjustment for Avoiding Flip Bucket Abutment Erosion Due to a Flood Projectile Jet in Ogee Spillway\",\"authors\":\"Rusul Latteef Naji, Hesham El-badry, Ahmed Ezzat Abdel-Rahman\",\"doi\":\"10.13189/cea.2024.120439\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":36986,\"journal\":{\"name\":\"Civil Engineering and Architecture\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering and Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.13189/cea.2024.120439\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering and Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13189/cea.2024.120439","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}