斯里兰卡大型发电基础设施开发中公私合作伙伴关系的关键成功因素

S. N. Fernando, K. G. M. Nanayakkara, A. K. N. S. S. Hapugoda
{"title":"斯里兰卡大型发电基础设施开发中公私合作伙伴关系的关键成功因素","authors":"S. N. Fernando, K. G. M. Nanayakkara, A. K. N. S. S. Hapugoda","doi":"10.4038/ijabf.v10i1.152","DOIUrl":null,"url":null,"abstract":"Ceylon Electricity Board (CEB) seeks alternative financing through Public Private Partnerships (PPP) due to non-cost-reflective tariff losses and debt overhang, relying on maturity in critical success factors. Thus, the research examines the success factors of Public Private Partnerships in developing power generation infrastructures in Sri Lanka, using quantitative data from a questionnaire distributed to stakeholders in CEB. The data analysis tools of descriptive and inferential statistics were used to analyze the collected data. The economic viability of the project, credibility of government policies, legal and regulatory framework, equitable risk allocation, transparent and efficient procurement process, financial market, a strong and good private consortium, and political stability, were found as the main CSFs for the development of mega power plants. The study was concentrated on the public agency of CEB, for generalization investigation to be extended to private investors, practitioners, and policymakers in the power sector. Further, a comprehensive study on the exploration of CSF to attract private investors to PPP for the development of mega power plants in Sri Lanka would be most beneficial to the industry. The framework developed in this research would be the benchmark for identifying critical success factors for improvement in PPP projects in Sri Lanka.","PeriodicalId":198654,"journal":{"name":"International Journal of Accounting and Business Finance","volume":"30 17","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Critical Success Factors for Public-Private Partnerships in the Development of Mega Power Generation Infrastructures in Sri Lanka\",\"authors\":\"S. N. Fernando, K. G. M. Nanayakkara, A. K. N. S. S. Hapugoda\",\"doi\":\"10.4038/ijabf.v10i1.152\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ceylon Electricity Board (CEB) seeks alternative financing through Public Private Partnerships (PPP) due to non-cost-reflective tariff losses and debt overhang, relying on maturity in critical success factors. Thus, the research examines the success factors of Public Private Partnerships in developing power generation infrastructures in Sri Lanka, using quantitative data from a questionnaire distributed to stakeholders in CEB. The data analysis tools of descriptive and inferential statistics were used to analyze the collected data. The economic viability of the project, credibility of government policies, legal and regulatory framework, equitable risk allocation, transparent and efficient procurement process, financial market, a strong and good private consortium, and political stability, were found as the main CSFs for the development of mega power plants. The study was concentrated on the public agency of CEB, for generalization investigation to be extended to private investors, practitioners, and policymakers in the power sector. Further, a comprehensive study on the exploration of CSF to attract private investors to PPP for the development of mega power plants in Sri Lanka would be most beneficial to the industry. The framework developed in this research would be the benchmark for identifying critical success factors for improvement in PPP projects in Sri Lanka.\",\"PeriodicalId\":198654,\"journal\":{\"name\":\"International Journal of Accounting and Business Finance\",\"volume\":\"30 17\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Accounting and Business Finance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4038/ijabf.v10i1.152\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Accounting and Business Finance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4038/ijabf.v10i1.152","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

锡兰电力局(CEB)由于无法反映成本的电价损失和债务负担过重,通过公私合作伙伴关系(PPP)寻求替代融资,并依赖于关键成功因素的成熟度。因此,本研究利用向斯里兰卡电力公司利益相关者发放的调查问卷中的定量数据,研究了公私合作伙伴关系在发展斯里兰卡发电基础设施方面的成功因素。数据分析工具包括描述性统计和推论性统计,用于分析收集到的数据。研究发现,项目的经济可行性、政府政策的可信度、法律和监管框架、公平的风险分配、透明高效的采购流程、金融市场、强大而良好的私人财团以及政治稳定性是发展超大型发电厂的主要 CSF。这项研究主要针对行政首长协调会这一公共机构,以便将调查推广到电力行业的私人投资者、从业人员和政策制定者。此外,关于探索 CSF 以吸引私人投资者参与斯里兰卡超大型电厂开发的公私伙伴关系的综合研究将对该行业大有裨益。本研究制定的框架将成为确定关键成功因素的基准,以改进斯里兰卡的 PPP 项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Critical Success Factors for Public-Private Partnerships in the Development of Mega Power Generation Infrastructures in Sri Lanka
Ceylon Electricity Board (CEB) seeks alternative financing through Public Private Partnerships (PPP) due to non-cost-reflective tariff losses and debt overhang, relying on maturity in critical success factors. Thus, the research examines the success factors of Public Private Partnerships in developing power generation infrastructures in Sri Lanka, using quantitative data from a questionnaire distributed to stakeholders in CEB. The data analysis tools of descriptive and inferential statistics were used to analyze the collected data. The economic viability of the project, credibility of government policies, legal and regulatory framework, equitable risk allocation, transparent and efficient procurement process, financial market, a strong and good private consortium, and political stability, were found as the main CSFs for the development of mega power plants. The study was concentrated on the public agency of CEB, for generalization investigation to be extended to private investors, practitioners, and policymakers in the power sector. Further, a comprehensive study on the exploration of CSF to attract private investors to PPP for the development of mega power plants in Sri Lanka would be most beneficial to the industry. The framework developed in this research would be the benchmark for identifying critical success factors for improvement in PPP projects in Sri Lanka.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信