评估陆港项目的风险因素:优先顺序、相互依存性和异质性

IF 2 Q3 BUSINESS
Thiago de Almeida Rodrigues, Udechukwu Ojiako, Caroline Maria de Miranda Mota, Alasdair Marshall, Maxwell Chipulu, Fikri Dweiri
{"title":"评估陆港项目的风险因素:优先顺序、相互依存性和异质性","authors":"Thiago de Almeida Rodrigues, Udechukwu Ojiako, Caroline Maria de Miranda Mota, Alasdair Marshall, Maxwell Chipulu, Fikri Dweiri","doi":"10.1108/mabr-09-2023-0064","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>We identify and further aggregate the most commonly engaged risk factors in dry port projects into dimensions. Noting the importance of developing a multi-perspective view of risk, we further assess the priority, interdependency and heterogeneity of the identified risk dimensions.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>We identified 44 risk factors from the literature, which were aggregated via exploratory factor analysis (EFA) into 8 major risk dimensions. We employ a fuzzy-based decision-making trial and evaluation laboratory (DEMATEL) relationship map to articulate various relationships among the risk dimensions.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>“Cost” emerged as the most important risk influencing the success of the dry port project, followed by “location,” “accessibility,” “infrastructural” and “operational,” which were also ranked prominently.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>This study offers significant insight into the management of risk in dry port projects. By aggregating key risk factors into distinct dimensions, we develop a structured framework for effective risk assessment and management. The insights gleaned from the study extend globally, as it serves as a concrete knowledge base to understand potential barriers to successful dry port projects.</p><!--/ Abstract__block -->","PeriodicalId":43865,"journal":{"name":"Maritime Business Review","volume":"44 1","pages":""},"PeriodicalIF":2.0000,"publicationDate":"2024-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessing risk dimensions in dry port projects: prioritization, interdependence and heterogeneity\",\"authors\":\"Thiago de Almeida Rodrigues, Udechukwu Ojiako, Caroline Maria de Miranda Mota, Alasdair Marshall, Maxwell Chipulu, Fikri Dweiri\",\"doi\":\"10.1108/mabr-09-2023-0064\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<h3>Purpose</h3>\\n<p>We identify and further aggregate the most commonly engaged risk factors in dry port projects into dimensions. Noting the importance of developing a multi-perspective view of risk, we further assess the priority, interdependency and heterogeneity of the identified risk dimensions.</p><!--/ Abstract__block -->\\n<h3>Design/methodology/approach</h3>\\n<p>We identified 44 risk factors from the literature, which were aggregated via exploratory factor analysis (EFA) into 8 major risk dimensions. We employ a fuzzy-based decision-making trial and evaluation laboratory (DEMATEL) relationship map to articulate various relationships among the risk dimensions.</p><!--/ Abstract__block -->\\n<h3>Findings</h3>\\n<p>“Cost” emerged as the most important risk influencing the success of the dry port project, followed by “location,” “accessibility,” “infrastructural” and “operational,” which were also ranked prominently.</p><!--/ Abstract__block -->\\n<h3>Originality/value</h3>\\n<p>This study offers significant insight into the management of risk in dry port projects. By aggregating key risk factors into distinct dimensions, we develop a structured framework for effective risk assessment and management. The insights gleaned from the study extend globally, as it serves as a concrete knowledge base to understand potential barriers to successful dry port projects.</p><!--/ Abstract__block -->\",\"PeriodicalId\":43865,\"journal\":{\"name\":\"Maritime Business Review\",\"volume\":\"44 1\",\"pages\":\"\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2024-07-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Maritime Business Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/mabr-09-2023-0064\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Maritime Business Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/mabr-09-2023-0064","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 0

摘要

目的我们确定了陆港项目中最常见的风险因素,并将其进一步归纳为多个维度。我们从文献中确定了 44 个风险因素,并通过探索性因素分析 (EFA) 将其汇总为 8 个主要风险维度。研究结果 "成本 "成为影响陆港项目成功与否的最重要风险,其次是 "位置"、"可达性"、"基础设施 "和 "运营",这些风险的排名也很靠前。通过将关键风险因素归纳为不同的维度,我们为有效的风险评估和管理制定了一个结构化框架。从本研究中获得的启示可推广到全球,因为它是了解成功陆港项目潜在障碍的具体知识基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessing risk dimensions in dry port projects: prioritization, interdependence and heterogeneity

Purpose

We identify and further aggregate the most commonly engaged risk factors in dry port projects into dimensions. Noting the importance of developing a multi-perspective view of risk, we further assess the priority, interdependency and heterogeneity of the identified risk dimensions.

Design/methodology/approach

We identified 44 risk factors from the literature, which were aggregated via exploratory factor analysis (EFA) into 8 major risk dimensions. We employ a fuzzy-based decision-making trial and evaluation laboratory (DEMATEL) relationship map to articulate various relationships among the risk dimensions.

Findings

“Cost” emerged as the most important risk influencing the success of the dry port project, followed by “location,” “accessibility,” “infrastructural” and “operational,” which were also ranked prominently.

Originality/value

This study offers significant insight into the management of risk in dry port projects. By aggregating key risk factors into distinct dimensions, we develop a structured framework for effective risk assessment and management. The insights gleaned from the study extend globally, as it serves as a concrete knowledge base to understand potential barriers to successful dry port projects.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.80
自引率
0.00%
发文量
19
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信