设施修复和管理决策支持系统(DSS)(第 2 部分):制定优化干预战略

IF 1.6 Q3 MANAGEMENT
Facilities Pub Date : 2024-07-04 DOI:10.1108/f-11-2022-0145
Owais Aldeeb, Altayeb Qasem
{"title":"设施修复和管理决策支持系统(DSS)(第 2 部分):制定优化干预战略","authors":"Owais Aldeeb, Altayeb Qasem","doi":"10.1108/f-11-2022-0145","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>This paper (Part 2 of 2) aims to expand the previously developed performance assessment model (PAM) into a decision support system (DSS) to produce optimized decisions on rehabilitation of facilities.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>The research includes a comprehensive PAM that integrates analytical hierarchy process-multi attribute utility theory methods for the physical, operational, and environmental aspects of the mosque, as described in Part 1 of the study. An optimized intervention tool is added to the PAM to complete the DSS development. The tool determines the optimum maintenance decisions that are in line with the budget and condition criticality. The deterioration measures are created using a deterministic straight-line extrapolation technique, and the intervention actions used in the optimization are specified through literature review and in-depth interviews with 11 experts. The optimization model was simplified into a user-friendly visual basic application and applied to an existing facility case study depicting its useful functionality.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>The optimization model recommendation of interventions recovered the overall condition rating index (CRI) of the facility while maintaining budget constraints. The CRI in the first approach (minimum budget to achieve acceptable overall performance) was improved from 6.5 to 7.76, costing 275,850 SAR. While the second approach (Maximum recovery with a selected budget constraint, 300,000 SAR in this case) CRI was improved from 6.5 to 8.3, costing 299,850 SAR.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>The presented DSS in this paper offers a tool that enables the rehabilitation and overall management of any facility by its managers. The DSS can also be further customized to fit the facility manager’s specific strategies and achieve desired objectives.</p><!--/ Abstract__block -->","PeriodicalId":47595,"journal":{"name":"Facilities","volume":"28 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2024-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Decision support system (DSS) for facilities rehabilitation and management (part 2): development of optimized intervention strategy\",\"authors\":\"Owais Aldeeb, Altayeb Qasem\",\"doi\":\"10.1108/f-11-2022-0145\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<h3>Purpose</h3>\\n<p>This paper (Part 2 of 2) aims to expand the previously developed performance assessment model (PAM) into a decision support system (DSS) to produce optimized decisions on rehabilitation of facilities.</p><!--/ Abstract__block -->\\n<h3>Design/methodology/approach</h3>\\n<p>The research includes a comprehensive PAM that integrates analytical hierarchy process-multi attribute utility theory methods for the physical, operational, and environmental aspects of the mosque, as described in Part 1 of the study. An optimized intervention tool is added to the PAM to complete the DSS development. The tool determines the optimum maintenance decisions that are in line with the budget and condition criticality. The deterioration measures are created using a deterministic straight-line extrapolation technique, and the intervention actions used in the optimization are specified through literature review and in-depth interviews with 11 experts. The optimization model was simplified into a user-friendly visual basic application and applied to an existing facility case study depicting its useful functionality.</p><!--/ Abstract__block -->\\n<h3>Findings</h3>\\n<p>The optimization model recommendation of interventions recovered the overall condition rating index (CRI) of the facility while maintaining budget constraints. The CRI in the first approach (minimum budget to achieve acceptable overall performance) was improved from 6.5 to 7.76, costing 275,850 SAR. While the second approach (Maximum recovery with a selected budget constraint, 300,000 SAR in this case) CRI was improved from 6.5 to 8.3, costing 299,850 SAR.</p><!--/ Abstract__block -->\\n<h3>Originality/value</h3>\\n<p>The presented DSS in this paper offers a tool that enables the rehabilitation and overall management of any facility by its managers. The DSS can also be further customized to fit the facility manager’s specific strategies and achieve desired objectives.</p><!--/ Abstract__block -->\",\"PeriodicalId\":47595,\"journal\":{\"name\":\"Facilities\",\"volume\":\"28 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2024-07-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Facilities\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/f-11-2022-0145\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Facilities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/f-11-2022-0145","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

目的 本文(第二部分,共 2 篇)旨在将先前开发的性能评估模型(PAM)扩展为决策支持系统(DSS),以便对设施修复做出优化决策。设计/方法/途径 如研究的第一部分所述,研究包括一个综合的性能评估模型,该模型整合了针对清真寺物理、运营和环境方面的分析层次过程-多属性效用理论方法。在 PAM 中增加了一个优化干预工具,以完成 DSS 的开发。该工具可确定符合预算和状况临界度的最佳维护决策。采用确定性直线外推法创建恶化度量,并通过文献综述和与 11 位专家的深入访谈确定优化中使用的干预措施。优化模型被简化为用户友好的可视化基本应用程序,并应用于现有设施的案例研究,描述了其有用的功能。研究结果优化模型的干预建议恢复了设施的整体状况评级指数(CRI),同时保持了预算约束。第一种方法(实现可接受的整体性能的最低预算)的 CRI 从 6.5 提高到 7.76,耗资 275 850 里亚尔。原创性/价值本文介绍的设计支持系统提供了一种工具,使管理人员能够对任何设施进行修复和全面管理。该系统还可进一步定制,以适应设施管理者的具体策略,实现预期目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Decision support system (DSS) for facilities rehabilitation and management (part 2): development of optimized intervention strategy

Purpose

This paper (Part 2 of 2) aims to expand the previously developed performance assessment model (PAM) into a decision support system (DSS) to produce optimized decisions on rehabilitation of facilities.

Design/methodology/approach

The research includes a comprehensive PAM that integrates analytical hierarchy process-multi attribute utility theory methods for the physical, operational, and environmental aspects of the mosque, as described in Part 1 of the study. An optimized intervention tool is added to the PAM to complete the DSS development. The tool determines the optimum maintenance decisions that are in line with the budget and condition criticality. The deterioration measures are created using a deterministic straight-line extrapolation technique, and the intervention actions used in the optimization are specified through literature review and in-depth interviews with 11 experts. The optimization model was simplified into a user-friendly visual basic application and applied to an existing facility case study depicting its useful functionality.

Findings

The optimization model recommendation of interventions recovered the overall condition rating index (CRI) of the facility while maintaining budget constraints. The CRI in the first approach (minimum budget to achieve acceptable overall performance) was improved from 6.5 to 7.76, costing 275,850 SAR. While the second approach (Maximum recovery with a selected budget constraint, 300,000 SAR in this case) CRI was improved from 6.5 to 8.3, costing 299,850 SAR.

Originality/value

The presented DSS in this paper offers a tool that enables the rehabilitation and overall management of any facility by its managers. The DSS can also be further customized to fit the facility manager’s specific strategies and achieve desired objectives.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Facilities
Facilities MANAGEMENT-
CiteScore
4.40
自引率
17.40%
发文量
46
期刊介绍: The journal offers thorough, independent and expert papers to inform relevant audiences of thinking and practice in the field, including topics such as: ■Intelligent buildings ■Post-occupancy evaluation (building evaluation) ■Relocation and change management ■Sick building syndrome ■Ergonomics and workplace design ■Environmental and workplace psychology ■Briefing, design and construction ■Energy consumption ■Quality initiatives ■Infrastructure management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信