推出先进的风险缓解战略,彻底改变项目的抗灾能力

Hanifah Oktaviana, R. B. Jakaria
{"title":"推出先进的风险缓解战略,彻底改变项目的抗灾能力","authors":"Hanifah Oktaviana, R. B. Jakaria","doi":"10.21070/ijins.v25i3.1168","DOIUrl":null,"url":null,"abstract":"This study examines the risks associated with project delays in the Mover Tram rail line repair project at TMII and proposes mitigation strategies using a combination of Risk Breakdown Structure (RBS), Analytical Network Process (ANP), and Bow Tie Analysis methodologies. Through expert interviews, questionnaires, and document analysis, key risks were identified and prioritized. Results indicate that construction management emerged as the dominant risk group, with specific risks including delays in critical path tasks and discrepancies between drawings and methods. Mitigation strategies were developed focusing on these dominant risks. The study underscores the importance of integrating diverse risk assessment techniques for effective project management and suggests avenues for future research to enhance risk management frameworks in construction projects. \nHighlights: \n1. Integrated risk analysis enhances project resilience.2. Construction management pivotal for identifying and mitigating project risks.3. Future research: Explore cost-related risks for improved project outcomes. \nKeywords: Project delays, Risk management, Construction projects, Mitigation strategies, Analytical methodologies","PeriodicalId":431998,"journal":{"name":"Indonesian Journal of Innovation Studies","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-06-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Revolutionizing Project Resilience through Advanced Risk Mitigation Strategy Launched\",\"authors\":\"Hanifah Oktaviana, R. B. Jakaria\",\"doi\":\"10.21070/ijins.v25i3.1168\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study examines the risks associated with project delays in the Mover Tram rail line repair project at TMII and proposes mitigation strategies using a combination of Risk Breakdown Structure (RBS), Analytical Network Process (ANP), and Bow Tie Analysis methodologies. Through expert interviews, questionnaires, and document analysis, key risks were identified and prioritized. Results indicate that construction management emerged as the dominant risk group, with specific risks including delays in critical path tasks and discrepancies between drawings and methods. Mitigation strategies were developed focusing on these dominant risks. The study underscores the importance of integrating diverse risk assessment techniques for effective project management and suggests avenues for future research to enhance risk management frameworks in construction projects. \\nHighlights: \\n1. Integrated risk analysis enhances project resilience.2. Construction management pivotal for identifying and mitigating project risks.3. Future research: Explore cost-related risks for improved project outcomes. \\nKeywords: Project delays, Risk management, Construction projects, Mitigation strategies, Analytical methodologies\",\"PeriodicalId\":431998,\"journal\":{\"name\":\"Indonesian Journal of Innovation Studies\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Indonesian Journal of Innovation Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21070/ijins.v25i3.1168\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Journal of Innovation Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21070/ijins.v25i3.1168","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究采用风险分解结构 (RBS)、分析网络流程 (ANP) 和领结分析 (Bow Tie Analysis) 等方法,对屯门二期有轨电车轨道线路维修项目中与项目延误相关的风险进行了研究,并提出了缓解风险的策略。通过专家访谈、问卷调查和文件分析,确定了关键风险并进行了优先排序。结果表明,施工管理是主要风险,具体风险包括关键路径任务的延误以及图纸和方法之间的差异。针对这些主要风险制定了缓解战略。这项研究强调了整合各种风险评估技术以实现有效项目管理的重要性,并提出了今后加强建筑项目风险管理框架的研究方向。亮点1.综合风险分析可增强项目复原力。 2. 施工管理对于识别和降低项目风险至关重要:探索与成本相关的风险,以改善项目成果。关键词项目延误 风险管理 施工项目 缓解策略 分析方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Revolutionizing Project Resilience through Advanced Risk Mitigation Strategy Launched
This study examines the risks associated with project delays in the Mover Tram rail line repair project at TMII and proposes mitigation strategies using a combination of Risk Breakdown Structure (RBS), Analytical Network Process (ANP), and Bow Tie Analysis methodologies. Through expert interviews, questionnaires, and document analysis, key risks were identified and prioritized. Results indicate that construction management emerged as the dominant risk group, with specific risks including delays in critical path tasks and discrepancies between drawings and methods. Mitigation strategies were developed focusing on these dominant risks. The study underscores the importance of integrating diverse risk assessment techniques for effective project management and suggests avenues for future research to enhance risk management frameworks in construction projects. Highlights: 1. Integrated risk analysis enhances project resilience.2. Construction management pivotal for identifying and mitigating project risks.3. Future research: Explore cost-related risks for improved project outcomes. Keywords: Project delays, Risk management, Construction projects, Mitigation strategies, Analytical methodologies
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信