{"title":"预警期间飓风导致停电的准二项式回归模型","authors":"Prateek Arora, Luis Ceferino","doi":"10.1061/ajrua6.rueng-1215","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":517982,"journal":{"name":"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering","volume":"24 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Quasi-Binomial Regression Model for Hurricane-Induced Power Outages during Early Warning\",\"authors\":\"Prateek Arora, Luis Ceferino\",\"doi\":\"10.1061/ajrua6.rueng-1215\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":517982,\"journal\":{\"name\":\"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering\",\"volume\":\"24 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/ajrua6.rueng-1215\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/ajrua6.rueng-1215","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}