确定公私合作基础设施项目可谈判价格的范围:一种模拟方法

Arsalan Zakeri Afshar, H. Abbasianjahromi, S. Mirhosseini, Mohammad Ehsanifar
{"title":"确定公私合作基础设施项目可谈判价格的范围:一种模拟方法","authors":"Arsalan Zakeri Afshar, H. Abbasianjahromi, S. Mirhosseini, Mohammad Ehsanifar","doi":"10.1108/ijbpa-05-2022-0075","DOIUrl":null,"url":null,"abstract":"PurposeThis research aims to measure the public sector comparator (PSC) to reach public–private partnership (PPP) projects' negotiable price range for water and sewage companies in Iran. PSC measurement drives the public sector to make valid decisions about costs.Design/methodology/approachAround 170 risks were primarily determined through studying numerous articles. Then, risk effects were specified by distributing questionnaires in two steps. The questionnaires are distributed among experts on PPP-related projects and the Monte Carlo simulation method is used for confidence factors of 70, 80 and 90%. PSC is measured based on these results to study cases of Sirjan’s sewerage and sewage purification systems.Findings11 risks were identified as the main risks that are effective on PSC, and project implementation costs were specified based on the modeling. The corruption of the private and public sectors was identified as the most effective risk in this research. It can affect a project’s cost up to 158% in the construction period and up to 134% in the operation period. Based on the obtained results, 63% of this risk’s cost goes to the public sector.Originality/valueThe originality of this research is the PSC measurement method and appointing the risk share of each private and public sector. The results of this research can be applied to all the infrastructure and PPP projects in Iran and other developing countries as a way for employers to estimate accurate negotiable price ranges.","PeriodicalId":510161,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":"119 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Determining the range of negotiable prices for public–private partnership infrastructure projects: a simulation approach\",\"authors\":\"Arsalan Zakeri Afshar, H. Abbasianjahromi, S. Mirhosseini, Mohammad Ehsanifar\",\"doi\":\"10.1108/ijbpa-05-2022-0075\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeThis research aims to measure the public sector comparator (PSC) to reach public–private partnership (PPP) projects' negotiable price range for water and sewage companies in Iran. PSC measurement drives the public sector to make valid decisions about costs.Design/methodology/approachAround 170 risks were primarily determined through studying numerous articles. Then, risk effects were specified by distributing questionnaires in two steps. The questionnaires are distributed among experts on PPP-related projects and the Monte Carlo simulation method is used for confidence factors of 70, 80 and 90%. PSC is measured based on these results to study cases of Sirjan’s sewerage and sewage purification systems.Findings11 risks were identified as the main risks that are effective on PSC, and project implementation costs were specified based on the modeling. The corruption of the private and public sectors was identified as the most effective risk in this research. It can affect a project’s cost up to 158% in the construction period and up to 134% in the operation period. Based on the obtained results, 63% of this risk’s cost goes to the public sector.Originality/valueThe originality of this research is the PSC measurement method and appointing the risk share of each private and public sector. The results of this research can be applied to all the infrastructure and PPP projects in Iran and other developing countries as a way for employers to estimate accurate negotiable price ranges.\",\"PeriodicalId\":510161,\"journal\":{\"name\":\"International Journal of Building Pathology and Adaptation\",\"volume\":\"119 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Building Pathology and Adaptation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/ijbpa-05-2022-0075\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Building Pathology and Adaptation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijbpa-05-2022-0075","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的本研究旨在测量公共部门比较基准(PSC),以达到伊朗供水和污水处理公司公私合作(PPP)项目的可协商价格范围。通过研究大量文章,主要确定了约 170 项风险。然后,通过分两步发放调查问卷来确定风险影响。在 PPP 相关项目的专家中分发调查问卷,并使用蒙特卡罗模拟法对 70%、80% 和 90%的置信系数进行模拟。根据这些结果来衡量 PSC,研究 Sirjan 污水处理和污水净化系统的案例。研究结果 11 项风险被确定为影响 PSC 的主要风险,并根据模型确定了项目实施成本。在本研究中,私营和公共部门的腐败被认为是最有效的风险。在施工期,它对项目成本的影响可达 158%,在运营期,可达 134%。原创性/价值本研究的原创性在于 PSC 测量方法以及指定私营和公共部门各自的风险份额。本研究的结果可应用于伊朗和其他发展中国家的所有基础设施和公私伙伴关系项目,作为雇主估算准确的可协商价格范围的一种方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Determining the range of negotiable prices for public–private partnership infrastructure projects: a simulation approach
PurposeThis research aims to measure the public sector comparator (PSC) to reach public–private partnership (PPP) projects' negotiable price range for water and sewage companies in Iran. PSC measurement drives the public sector to make valid decisions about costs.Design/methodology/approachAround 170 risks were primarily determined through studying numerous articles. Then, risk effects were specified by distributing questionnaires in two steps. The questionnaires are distributed among experts on PPP-related projects and the Monte Carlo simulation method is used for confidence factors of 70, 80 and 90%. PSC is measured based on these results to study cases of Sirjan’s sewerage and sewage purification systems.Findings11 risks were identified as the main risks that are effective on PSC, and project implementation costs were specified based on the modeling. The corruption of the private and public sectors was identified as the most effective risk in this research. It can affect a project’s cost up to 158% in the construction period and up to 134% in the operation period. Based on the obtained results, 63% of this risk’s cost goes to the public sector.Originality/valueThe originality of this research is the PSC measurement method and appointing the risk share of each private and public sector. The results of this research can be applied to all the infrastructure and PPP projects in Iran and other developing countries as a way for employers to estimate accurate negotiable price ranges.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信