{"title":"支持第二次 JET 氘氚实验的安全案例的编制和实施概览","authors":"Jane Johnston, David Perry","doi":"10.1088/1361-6587/ad4d1b","DOIUrl":null,"url":null,"abstract":"\n An overview of the preparation and implementation of the JET DTE2 Safety Case is presented. The Safety Case regime, developed by UKAEA for fusion applications to demonstrate compliance with relevant regulations, and its implementation on UKAEA sites is outlined. The hazard assessment process and details of the methodology applied to assess key JET fault scenarios are provided. An outline of key inventories, their composition, and applied factors for consequence and risk assessment are discussed. The consequences resulting from key fault sequences, the designation of appropriate safety measures and the associated risks are summarised and compared against Basic Safety Limits and Objectives. Finally, some of the lessons learned from DTE2 following implementation are discussed.","PeriodicalId":510623,"journal":{"name":"Plasma Physics and Controlled Fusion","volume":"75 24","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An overview of the preparation and implementation of the Safety Case in support of the 2nd JET Deuterium-Tritium Experiment\",\"authors\":\"Jane Johnston, David Perry\",\"doi\":\"10.1088/1361-6587/ad4d1b\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n An overview of the preparation and implementation of the JET DTE2 Safety Case is presented. The Safety Case regime, developed by UKAEA for fusion applications to demonstrate compliance with relevant regulations, and its implementation on UKAEA sites is outlined. The hazard assessment process and details of the methodology applied to assess key JET fault scenarios are provided. An outline of key inventories, their composition, and applied factors for consequence and risk assessment are discussed. The consequences resulting from key fault sequences, the designation of appropriate safety measures and the associated risks are summarised and compared against Basic Safety Limits and Objectives. Finally, some of the lessons learned from DTE2 following implementation are discussed.\",\"PeriodicalId\":510623,\"journal\":{\"name\":\"Plasma Physics and Controlled Fusion\",\"volume\":\"75 24\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-05-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Plasma Physics and Controlled Fusion\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1088/1361-6587/ad4d1b\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Plasma Physics and Controlled Fusion","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1361-6587/ad4d1b","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An overview of the preparation and implementation of the Safety Case in support of the 2nd JET Deuterium-Tritium Experiment
An overview of the preparation and implementation of the JET DTE2 Safety Case is presented. The Safety Case regime, developed by UKAEA for fusion applications to demonstrate compliance with relevant regulations, and its implementation on UKAEA sites is outlined. The hazard assessment process and details of the methodology applied to assess key JET fault scenarios are provided. An outline of key inventories, their composition, and applied factors for consequence and risk assessment are discussed. The consequences resulting from key fault sequences, the designation of appropriate safety measures and the associated risks are summarised and compared against Basic Safety Limits and Objectives. Finally, some of the lessons learned from DTE2 following implementation are discussed.