{"title":"关键链项目管理在 PT.Rekatama Putra Gegana 航空公司","authors":"Ridha Azka Raga, Husna Putri Pertiwi, Jasrial Jasrial","doi":"10.61194/ijjm.v5i2.1126","DOIUrl":null,"url":null,"abstract":"Planning is a crucial element for aircraft maintenance companies to achieve higher profitability. However, in practice, the company still employs traditional planning methods, which are deemed inefficient as they do not consider the productivity of each task involved, leading to issues arising from human behavior tendencies causing additional time for task completion. Aircraft maintenance planning can be improved by employing the Critical Chain Project Management (CCPM) method, which offers a different approach to determining the time and cost of aircraft maintenance. This method addresses multitasking, student syndrome, Parkinson's law, and provides buffers at the end of tasks. Analysis results show that the completion time for tasks within the company, totaling 76 days, differs by 14 days compared to the completion time using the CCPM method, which is 62 days. This indicates that employing the CCPM method for engine maintenance is more effective and efficient. The efficiency achieved amounts to Rp7,036,323.","PeriodicalId":325965,"journal":{"name":"Ilomata International Journal of Management","volume":"63 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application of Critical Chain Project Management on Engine Maintenance at PT. Rekatama Putra Gegana Aviation\",\"authors\":\"Ridha Azka Raga, Husna Putri Pertiwi, Jasrial Jasrial\",\"doi\":\"10.61194/ijjm.v5i2.1126\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Planning is a crucial element for aircraft maintenance companies to achieve higher profitability. However, in practice, the company still employs traditional planning methods, which are deemed inefficient as they do not consider the productivity of each task involved, leading to issues arising from human behavior tendencies causing additional time for task completion. Aircraft maintenance planning can be improved by employing the Critical Chain Project Management (CCPM) method, which offers a different approach to determining the time and cost of aircraft maintenance. This method addresses multitasking, student syndrome, Parkinson's law, and provides buffers at the end of tasks. Analysis results show that the completion time for tasks within the company, totaling 76 days, differs by 14 days compared to the completion time using the CCPM method, which is 62 days. This indicates that employing the CCPM method for engine maintenance is more effective and efficient. The efficiency achieved amounts to Rp7,036,323.\",\"PeriodicalId\":325965,\"journal\":{\"name\":\"Ilomata International Journal of Management\",\"volume\":\"63 3\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ilomata International Journal of Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.61194/ijjm.v5i2.1126\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ilomata International Journal of Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.61194/ijjm.v5i2.1126","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

规划是飞机维修公司实现更高盈利的关键因素。然而,在实践中,公司仍然采用传统的计划方法,这种方法被认为效率低下,因为它们没有考虑到每项相关任务的生产率,导致因人类行为倾向而产生的问题,造成完成任务的时间增加。采用关键链项目管理(CCPM)方法可以改进飞机维护计划,该方法提供了一种不同的方法来确定飞机维护的时间和成本。该方法解决了多任务处理、学生综合症、帕金森定律等问题,并在任务结束时提供缓冲时间。分析结果显示,公司内部任务的完成时间共计 76 天,与使用 CCPM 方法的完成时间 62 天相比,相差 14 天。这表明,采用 CCPM 方法进行发动机维护更有效、更高效。所实现的效率为 7,036,323 印尼盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application of Critical Chain Project Management on Engine Maintenance at PT. Rekatama Putra Gegana Aviation
Planning is a crucial element for aircraft maintenance companies to achieve higher profitability. However, in practice, the company still employs traditional planning methods, which are deemed inefficient as they do not consider the productivity of each task involved, leading to issues arising from human behavior tendencies causing additional time for task completion. Aircraft maintenance planning can be improved by employing the Critical Chain Project Management (CCPM) method, which offers a different approach to determining the time and cost of aircraft maintenance. This method addresses multitasking, student syndrome, Parkinson's law, and provides buffers at the end of tasks. Analysis results show that the completion time for tasks within the company, totaling 76 days, differs by 14 days compared to the completion time using the CCPM method, which is 62 days. This indicates that employing the CCPM method for engine maintenance is more effective and efficient. The efficiency achieved amounts to Rp7,036,323.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信