{"title":"露天矿生产调度与斜坡设计的联合随机优化","authors":"Jacob Cutler, R. Dimitrakopoulos","doi":"10.1080/17480930.2024.2335709","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":507651,"journal":{"name":"International Journal of Mining, Reclamation and Environment","volume":"39 6","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Joint stochastic optimisation of open-pit mine production scheduling with ramp design\",\"authors\":\"Jacob Cutler, R. Dimitrakopoulos\",\"doi\":\"10.1080/17480930.2024.2335709\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":507651,\"journal\":{\"name\":\"International Journal of Mining, Reclamation and Environment\",\"volume\":\"39 6\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining, Reclamation and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/17480930.2024.2335709\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining, Reclamation and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/17480930.2024.2335709","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}