{"title":"如果合同文件对条件只字未提,就很难成功","authors":"M. Loulakis, L. McLaughlin","doi":"10.1061/ciegag.0001702","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":513803,"journal":{"name":"Civil Engineering Magazine","volume":"32 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"It's Hard to Succeed If the Contract Documents Are Silent on the Condition\",\"authors\":\"M. Loulakis, L. McLaughlin\",\"doi\":\"10.1061/ciegag.0001702\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":513803,\"journal\":{\"name\":\"Civil Engineering Magazine\",\"volume\":\"32 3\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering Magazine\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/ciegag.0001702\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Magazine","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/ciegag.0001702","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}