在开发阶段为多功能动能型高层建筑制定生命周期管理计划

S. Laketich, V. Strokova
{"title":"在开发阶段为多功能动能型高层建筑制定生命周期管理计划","authors":"S. Laketich, V. Strokova","doi":"10.34031/2071-7318-2024-9-2-33-42","DOIUrl":null,"url":null,"abstract":"The aim of the research is to explore paths and solutions for the effective management of capital construction objects during the operational phase. Throughout the study, life cycles of capital construction objects were examined and analyzed, justifying the feasibility of enhancing the life cycle management system during the operational stage. To optimize the operation of a building and improve its efficiency, the implementation of BIM technologies into the management process of capital construction objects is proposed, taking into account the peculiarities of the kinetic construction project. These technologies allow for continuous monitoring of structures and mechanisms, determining their \"fatigue\" level, microclimate, the functionality of automation systems, alertness, and the impact of human factors on the attractiveness of the real estate object. Specifically for the project, a conceptual management scheme has been developed, adapted for a multifunctional kinetic high-rise building, and its applicability can also extend to other capital construction objects. Such a scheme includes multi-level automation of the management system, implying subordination to a unified center, the system's brain, and a multitude of controllers that collect and process information from sensors. Using a well-defined algorithm, they quickly respond to tasks and efficiently manage one or several elements of the system","PeriodicalId":9367,"journal":{"name":"Bulletin of Belgorod State Technological University named after. V. G. Shukhov","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DEVELOPMENT OF A LIFE CYCLE MANAGEMENT SCHEME FOR A MULTIFUNCTIONAL KINETIC-TYPE HIGH-RISE BUILDING AT THE EXPLOITATION STAGE\",\"authors\":\"S. Laketich, V. Strokova\",\"doi\":\"10.34031/2071-7318-2024-9-2-33-42\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aim of the research is to explore paths and solutions for the effective management of capital construction objects during the operational phase. Throughout the study, life cycles of capital construction objects were examined and analyzed, justifying the feasibility of enhancing the life cycle management system during the operational stage. To optimize the operation of a building and improve its efficiency, the implementation of BIM technologies into the management process of capital construction objects is proposed, taking into account the peculiarities of the kinetic construction project. These technologies allow for continuous monitoring of structures and mechanisms, determining their \\\"fatigue\\\" level, microclimate, the functionality of automation systems, alertness, and the impact of human factors on the attractiveness of the real estate object. Specifically for the project, a conceptual management scheme has been developed, adapted for a multifunctional kinetic high-rise building, and its applicability can also extend to other capital construction objects. Such a scheme includes multi-level automation of the management system, implying subordination to a unified center, the system's brain, and a multitude of controllers that collect and process information from sensors. Using a well-defined algorithm, they quickly respond to tasks and efficiently manage one or several elements of the system\",\"PeriodicalId\":9367,\"journal\":{\"name\":\"Bulletin of Belgorod State Technological University named after. V. G. Shukhov\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of Belgorod State Technological University named after. V. G. Shukhov\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.34031/2071-7318-2024-9-2-33-42\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of Belgorod State Technological University named after. V. G. Shukhov","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34031/2071-7318-2024-9-2-33-42","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

研究的目的是探索在运营阶段有效管理基本建设目标的路径和解决方案。在整个研究过程中,对基本建设对象的生命周期进行了考察和分析,论证了在运营阶段加强生命周期管理系统的可行性。为了优化建筑物的运行并提高其效率,考虑到动能建筑项目的特殊性,建议在基本建设对象的管理过程中实施 BIM 技术。这些技术可以对结构和机制进行持续监测,确定其 "疲劳 "程度、微气候、自动化系统的功能、警觉性以及人为因素对房地产对象吸引力的影响。专门为该项目开发了一个概念性管理方案,适用于多功能动能高层建筑,其适用性也可扩展到其他基本建设项目。这种方案包括管理系统的多层次自动化,即服从于一个统一的中心,系统的大脑,以及众多收集和处理来自传感器信息的控制器。这些控制器采用定义明确的算法,对任务做出快速反应,并对系统中的一个或多个要素进行有效管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
DEVELOPMENT OF A LIFE CYCLE MANAGEMENT SCHEME FOR A MULTIFUNCTIONAL KINETIC-TYPE HIGH-RISE BUILDING AT THE EXPLOITATION STAGE
The aim of the research is to explore paths and solutions for the effective management of capital construction objects during the operational phase. Throughout the study, life cycles of capital construction objects were examined and analyzed, justifying the feasibility of enhancing the life cycle management system during the operational stage. To optimize the operation of a building and improve its efficiency, the implementation of BIM technologies into the management process of capital construction objects is proposed, taking into account the peculiarities of the kinetic construction project. These technologies allow for continuous monitoring of structures and mechanisms, determining their "fatigue" level, microclimate, the functionality of automation systems, alertness, and the impact of human factors on the attractiveness of the real estate object. Specifically for the project, a conceptual management scheme has been developed, adapted for a multifunctional kinetic high-rise building, and its applicability can also extend to other capital construction objects. Such a scheme includes multi-level automation of the management system, implying subordination to a unified center, the system's brain, and a multitude of controllers that collect and process information from sensors. Using a well-defined algorithm, they quickly respond to tasks and efficiently manage one or several elements of the system
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信