确定工人数量以提高生产部门的生产率 UD.红线

Sasongko Adji Hadisaputra, Erni Puspanantasari Putri
{"title":"确定工人数量以提高生产部门的生产率 UD.红线","authors":"Sasongko Adji Hadisaputra, Erni Puspanantasari Putri","doi":"10.31004/jutin.v7i1.21887","DOIUrl":null,"url":null,"abstract":"\nRedline is a home industry that produces sandals. UD. The current redline must prioritize the efficiency and effectiveness of production operations. A business can be said to be efficient if it is able to produce products based on consumer demand. One of the factors that influences the completion of requests is working time, the personnel involved in completing a production. For example, the aim of this research. This research focuses on the production of men's flip-flops to determine the standard time for each worker and the labor requirements required by UD. Redline for each job. Using the Workload Analysis (WLA) method. After this method was implemented, the research results showed that the process of making 1 unit of product took 12.33 minutes with 8 workers with additional overtime time and a cost of Rp. 120,129,600\n","PeriodicalId":17759,"journal":{"name":"Jurnal Teknik Industri Terintegrasi","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Penentuan Jumlah Tenaga Kerja Guna Meningkatkan Produktifitas pada Bagian Produksi UD. Redline\",\"authors\":\"Sasongko Adji Hadisaputra, Erni Puspanantasari Putri\",\"doi\":\"10.31004/jutin.v7i1.21887\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nRedline is a home industry that produces sandals. UD. The current redline must prioritize the efficiency and effectiveness of production operations. A business can be said to be efficient if it is able to produce products based on consumer demand. One of the factors that influences the completion of requests is working time, the personnel involved in completing a production. For example, the aim of this research. This research focuses on the production of men's flip-flops to determine the standard time for each worker and the labor requirements required by UD. Redline for each job. Using the Workload Analysis (WLA) method. After this method was implemented, the research results showed that the process of making 1 unit of product took 12.33 minutes with 8 workers with additional overtime time and a cost of Rp. 120,129,600\\n\",\"PeriodicalId\":17759,\"journal\":{\"name\":\"Jurnal Teknik Industri Terintegrasi\",\"volume\":\"14 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Industri Terintegrasi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31004/jutin.v7i1.21887\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Industri Terintegrasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31004/jutin.v7i1.21887","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Redline 是一家生产凉鞋的家居产业。UD.当前的红线必须把生产经营的效率和效益放在首位。如果一家企业能够根据消费者的需求生产产品,就可以说它是高效的。影响要求完成的因素之一是工作时间,即参与完成生产的人员。例如,本研究的目的。本研究的重点是男式人字拖的生产,以确定每个工人的标准时间和 UD 所需的劳动力要求。每项工作的红线。使用工作量分析法(WLA)。实施该方法后,研究结果显示,在 8 名工人的情况下,生产 1 单位产品的过程耗时 12.33 分钟,加班时间增加,成本为 120,129,600 印尼盾
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Penentuan Jumlah Tenaga Kerja Guna Meningkatkan Produktifitas pada Bagian Produksi UD. Redline
Redline is a home industry that produces sandals. UD. The current redline must prioritize the efficiency and effectiveness of production operations. A business can be said to be efficient if it is able to produce products based on consumer demand. One of the factors that influences the completion of requests is working time, the personnel involved in completing a production. For example, the aim of this research. This research focuses on the production of men's flip-flops to determine the standard time for each worker and the labor requirements required by UD. Redline for each job. Using the Workload Analysis (WLA) method. After this method was implemented, the research results showed that the process of making 1 unit of product took 12.33 minutes with 8 workers with additional overtime time and a cost of Rp. 120,129,600
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信