满足 PT X 纸制品需求的劳动力需求分析

Aditya Yoga Syah Putra, H. Herlina
{"title":"满足 PT X 纸制品需求的劳动力需求分析","authors":"Aditya Yoga Syah Putra, H. Herlina","doi":"10.31004/jutin.v7i1.21734","DOIUrl":null,"url":null,"abstract":"PT This research focuses on the paper production section of PM (Paper Machine) one. The problem of this research is to analyze whether the paper production section at PM (Paper Machine) one is experiencing a shortage of workers. In this case, it means that PT X has never found the ideal number of workers. Therefore, the Work Load Analysis (WLA) method is used in this research. The results show that the production of paper products is 3,350 tons, with a manufacturing time of 99.42 minutes per roll on PM (Paper Machine) one requiring 34 workers, so an additional 15 workers are needed. Then if the company does overtime for 19 workers the company will only incur more costs. less than increasing the number of workers. In addition, it is better if the company continues to use 19 workers with overtime hours because labor costs will become too high if they increase the number of workers.","PeriodicalId":17759,"journal":{"name":"Jurnal Teknik Industri Terintegrasi","volume":"9 6","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Kebutuhan Jumlah Tenaga Kerja untuk Memenuhi Permintaan Produk Kertas pada PT X\",\"authors\":\"Aditya Yoga Syah Putra, H. Herlina\",\"doi\":\"10.31004/jutin.v7i1.21734\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT This research focuses on the paper production section of PM (Paper Machine) one. The problem of this research is to analyze whether the paper production section at PM (Paper Machine) one is experiencing a shortage of workers. In this case, it means that PT X has never found the ideal number of workers. Therefore, the Work Load Analysis (WLA) method is used in this research. The results show that the production of paper products is 3,350 tons, with a manufacturing time of 99.42 minutes per roll on PM (Paper Machine) one requiring 34 workers, so an additional 15 workers are needed. Then if the company does overtime for 19 workers the company will only incur more costs. less than increasing the number of workers. In addition, it is better if the company continues to use 19 workers with overtime hours because labor costs will become too high if they increase the number of workers.\",\"PeriodicalId\":17759,\"journal\":{\"name\":\"Jurnal Teknik Industri Terintegrasi\",\"volume\":\"9 6\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Industri Terintegrasi\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31004/jutin.v7i1.21734\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Industri Terintegrasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31004/jutin.v7i1.21734","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT 本研究侧重于 PM(造纸机)1 的纸张生产部门。本研究的问题是分析 PM(造纸机)一号纸张生产部是否存在工人短缺的问题。在这种情况下,这意味着 PT X 一直没有找到理想的工人数量。因此,本研究采用了工作负荷分析法(WLA)。结果显示,纸制品产量为 3,350 吨,一号 PM(造纸机)每卷生产时间为 99.42 分钟,需要 34 名工人,因此需要增加 15 名工人。那么,如果公司为 19 名工人加班,只会增加公司的成本。此外,公司最好继续使用 19 名加班工人,因为如果增加工人数量,劳动力成本将变得过高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Kebutuhan Jumlah Tenaga Kerja untuk Memenuhi Permintaan Produk Kertas pada PT X
PT This research focuses on the paper production section of PM (Paper Machine) one. The problem of this research is to analyze whether the paper production section at PM (Paper Machine) one is experiencing a shortage of workers. In this case, it means that PT X has never found the ideal number of workers. Therefore, the Work Load Analysis (WLA) method is used in this research. The results show that the production of paper products is 3,350 tons, with a manufacturing time of 99.42 minutes per roll on PM (Paper Machine) one requiring 34 workers, so an additional 15 workers are needed. Then if the company does overtime for 19 workers the company will only incur more costs. less than increasing the number of workers. In addition, it is better if the company continues to use 19 workers with overtime hours because labor costs will become too high if they increase the number of workers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信