供水管网分区的特点

Aram Sahakyan
{"title":"供水管网分区的特点","authors":"Aram Sahakyan","doi":"10.18799/24131830/2024/2/4262","DOIUrl":null,"url":null,"abstract":"Relevance. The original studies of water supply network and network exploitation data, as well as international experience, applied in similar conditions, and the data of existing literature, data of works on water supply zoning, which were carried out in the networks of various settlements in the Republic of Armenia, have been improved and are now being implemented effectively through the clear procedure developed by us. In our case, zoning is carried out under the conditions of the existing system, therefore the methods developed during design and reconstruction work consider the features of the existing system.Aim. To develop a technique to enhance the efficiency of water supply systems by implementing network zoning. It involves transforming the network into hydraulically separated zones isolated from each other. Within each zone, water supply can be regulated based on consumption requirements. Objects. The article discusses issues related to design and reconstruction procedures of existing water supply network zones. It defines the priority of zoning implementation for the current stage and proposes a method for assessing the permissible level of losses, taking into account the technical condition of the water supply network. Methods. The calculations for this study were performed using well-known hydraulic principles and laws. Experimental studies were conducted directly on the water supply network under production conditions. Results. The actual implementation of these measures in various urban locations revealed that reduction in water usage in a service zone was only 8–10%. However, analysis of the functioning of the reconstructed zones led to the conclusion that the already constructed zones now offer suitable conditions for productive work on leak detection and elimination. In the given example, during the operation of the study zone, 4300 m (about 25%) of the existing 17400 m pipelines in the reconstruction zone were decommissioned, along with 13 of 22 pumping stations. Over two years of work, the cost of electricity at the existing yard pumping stations was reduced by more than six times, the total cost of electricity in the zone was reduced by more than twelve times, and the amount of water entering the zone was reduced by 44% as a result of the water supply system reconstruction presented in the example.  ","PeriodicalId":513946,"journal":{"name":"Bulletin of the Tomsk Polytechnic University Geo Assets Engineering","volume":"89 8","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Characteristics of water supply network zoning\",\"authors\":\"Aram Sahakyan\",\"doi\":\"10.18799/24131830/2024/2/4262\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Relevance. The original studies of water supply network and network exploitation data, as well as international experience, applied in similar conditions, and the data of existing literature, data of works on water supply zoning, which were carried out in the networks of various settlements in the Republic of Armenia, have been improved and are now being implemented effectively through the clear procedure developed by us. In our case, zoning is carried out under the conditions of the existing system, therefore the methods developed during design and reconstruction work consider the features of the existing system.Aim. To develop a technique to enhance the efficiency of water supply systems by implementing network zoning. It involves transforming the network into hydraulically separated zones isolated from each other. Within each zone, water supply can be regulated based on consumption requirements. Objects. The article discusses issues related to design and reconstruction procedures of existing water supply network zones. It defines the priority of zoning implementation for the current stage and proposes a method for assessing the permissible level of losses, taking into account the technical condition of the water supply network. Methods. The calculations for this study were performed using well-known hydraulic principles and laws. Experimental studies were conducted directly on the water supply network under production conditions. Results. The actual implementation of these measures in various urban locations revealed that reduction in water usage in a service zone was only 8–10%. However, analysis of the functioning of the reconstructed zones led to the conclusion that the already constructed zones now offer suitable conditions for productive work on leak detection and elimination. In the given example, during the operation of the study zone, 4300 m (about 25%) of the existing 17400 m pipelines in the reconstruction zone were decommissioned, along with 13 of 22 pumping stations. Over two years of work, the cost of electricity at the existing yard pumping stations was reduced by more than six times, the total cost of electricity in the zone was reduced by more than twelve times, and the amount of water entering the zone was reduced by 44% as a result of the water supply system reconstruction presented in the example.  \",\"PeriodicalId\":513946,\"journal\":{\"name\":\"Bulletin of the Tomsk Polytechnic University Geo Assets Engineering\",\"volume\":\"89 8\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the Tomsk Polytechnic University Geo Assets Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18799/24131830/2024/2/4262\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the Tomsk Polytechnic University Geo Assets Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18799/24131830/2024/2/4262","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

相关性。对供水网络和网络开发数据的原始研究,以及在类似条件下应用的国际经验、现有文献数据、在亚美尼亚共和国各居民点供水网络中进行的供水分区工程数据,通过我们制定的明确程序得到了改进,目前正在有效实施。在我们的案例中,分区是在现有系统的条件下进行的,因此在设计和重建工作中开发的方法考虑了现有系统的特点。开发一种技术,通过实施管网分区提高供水系统的效率。这包括将供水管网改造成相互隔离的水力分区。在每个区域内,可根据用水需求调节供水量。目标。文章讨论了与现有供水管网分区的设计和重建程序有关的问题。文章确定了现阶段实施分区的优先次序,并提出了一种评估允许损耗水平的方法,同时考虑到供水管网的技术条件。方法。本研究采用著名的水力原理和定律进行计算。在生产条件下直接对供水管网进行了实验研究。结果。在多个城市地点实际实施这些措施后发现,服务区的用水量仅减少了 8-10%。然而,通过对重建区域的运行情况进行分析,得出的结论是,已经建成的区域现在为泄漏检测和消除方面的生产性工作提供了合适的条件。举例来说,在研究区的运行期间,重建区现有 17400 米管道中的 4300 米(约 25%)以及 22 个泵站中的 13 个被停用。在两年的工作中,现有堆场泵站的电费降低了 6 倍多,区内的总电费降低了 12 倍多,由于实例中供水系统的重建,进入区内的水量减少了 44%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Characteristics of water supply network zoning
Relevance. The original studies of water supply network and network exploitation data, as well as international experience, applied in similar conditions, and the data of existing literature, data of works on water supply zoning, which were carried out in the networks of various settlements in the Republic of Armenia, have been improved and are now being implemented effectively through the clear procedure developed by us. In our case, zoning is carried out under the conditions of the existing system, therefore the methods developed during design and reconstruction work consider the features of the existing system.Aim. To develop a technique to enhance the efficiency of water supply systems by implementing network zoning. It involves transforming the network into hydraulically separated zones isolated from each other. Within each zone, water supply can be regulated based on consumption requirements. Objects. The article discusses issues related to design and reconstruction procedures of existing water supply network zones. It defines the priority of zoning implementation for the current stage and proposes a method for assessing the permissible level of losses, taking into account the technical condition of the water supply network. Methods. The calculations for this study were performed using well-known hydraulic principles and laws. Experimental studies were conducted directly on the water supply network under production conditions. Results. The actual implementation of these measures in various urban locations revealed that reduction in water usage in a service zone was only 8–10%. However, analysis of the functioning of the reconstructed zones led to the conclusion that the already constructed zones now offer suitable conditions for productive work on leak detection and elimination. In the given example, during the operation of the study zone, 4300 m (about 25%) of the existing 17400 m pipelines in the reconstruction zone were decommissioned, along with 13 of 22 pumping stations. Over two years of work, the cost of electricity at the existing yard pumping stations was reduced by more than six times, the total cost of electricity in the zone was reduced by more than twelve times, and the amount of water entering the zone was reduced by 44% as a result of the water supply system reconstruction presented in the example.  
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信