近似估算舰艇组生产的人日:两阶段随机程序

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS
Yusuf Genç, Mustafa Kafali, U. Çelebi
{"title":"近似估算舰艇组生产的人日:两阶段随机程序","authors":"Yusuf Genç, Mustafa Kafali, U. Çelebi","doi":"10.2478/pomr-2024-0015","DOIUrl":null,"url":null,"abstract":"\n It is critical to estimate the workforce requirements for the production of blocks in shipbuilding. In this study, the number of workforce (man-day) required for the production of a passenger ship’s double bottom block was estimated. Initially, the production of the block was observed, and the average working performance of the mounting, welding, and grinding workers was recorded. Block drawings were examined and the work required was calculated. The amount of work increased, depending on any revisions required due to incorrect or incomplete designs. The average working performance of an employee is uncertain due to environmental factors, including the weather and working conditions, as well as health (both physical and mental). A two-stage stochastic programming model with recourse was established to estimate man-day required and a Sample Average Approximation (SAA) technique was used to obtain a near-optimum solution. The results of the study were compared with shipyard records and an agreement of approximately 90% was achieved.","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2024-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Approximate Estimation of Man-Day in Ship Block Production: A Two-Stage Stochastic Program\",\"authors\":\"Yusuf Genç, Mustafa Kafali, U. Çelebi\",\"doi\":\"10.2478/pomr-2024-0015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n It is critical to estimate the workforce requirements for the production of blocks in shipbuilding. In this study, the number of workforce (man-day) required for the production of a passenger ship’s double bottom block was estimated. Initially, the production of the block was observed, and the average working performance of the mounting, welding, and grinding workers was recorded. Block drawings were examined and the work required was calculated. The amount of work increased, depending on any revisions required due to incorrect or incomplete designs. The average working performance of an employee is uncertain due to environmental factors, including the weather and working conditions, as well as health (both physical and mental). A two-stage stochastic programming model with recourse was established to estimate man-day required and a Sample Average Approximation (SAA) technique was used to obtain a near-optimum solution. The results of the study were compared with shipyard records and an agreement of approximately 90% was achieved.\",\"PeriodicalId\":2,\"journal\":{\"name\":\"ACS Applied Bio Materials\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.6000,\"publicationDate\":\"2024-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ACS Applied Bio Materials\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.2478/pomr-2024-0015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MATERIALS SCIENCE, BIOMATERIALS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.2478/pomr-2024-0015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 0

摘要

估算造船业块料生产所需的劳动力至关重要。本研究估算了生产客轮双层底座所需的劳动力数量(人日)。首先,观察了砌块的生产过程,并记录了安装、焊接和打磨工人的平均工作表现。检查船体图纸并计算所需工作量。由于设计不正确或不完整而需要修改,工作量随之增加。由于环境因素(包括天气和工作条件)以及健康状况(包括身体和精神)的影响,员工的平均工作表现是不确定的。为估算所需人工日,建立了一个带追索权的两阶段随机编程模型,并使用样本平均近似法(SAA)技术获得了一个接近最优的解决方案。研究结果与船厂记录进行了比较,两者的吻合率约为 90%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Approximate Estimation of Man-Day in Ship Block Production: A Two-Stage Stochastic Program
It is critical to estimate the workforce requirements for the production of blocks in shipbuilding. In this study, the number of workforce (man-day) required for the production of a passenger ship’s double bottom block was estimated. Initially, the production of the block was observed, and the average working performance of the mounting, welding, and grinding workers was recorded. Block drawings were examined and the work required was calculated. The amount of work increased, depending on any revisions required due to incorrect or incomplete designs. The average working performance of an employee is uncertain due to environmental factors, including the weather and working conditions, as well as health (both physical and mental). A two-stage stochastic programming model with recourse was established to estimate man-day required and a Sample Average Approximation (SAA) technique was used to obtain a near-optimum solution. The results of the study were compared with shipyard records and an agreement of approximately 90% was achieved.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信