T. A. Taha, Hussein I. Zaynal, A. T. T. Hussain, H. Desa, Faris Hassan Taha
{"title":"使用 MATLAB/Simulink 对输电线路进行定时过流保护","authors":"T. A. Taha, Hussein I. Zaynal, A. T. T. Hussain, H. Desa, Faris Hassan Taha","doi":"10.11591/eei.v13i2.5301","DOIUrl":null,"url":null,"abstract":"This paper has investigated the application of the definite time over-current (DTOC) which reacts to protect the breaker from damage during the occurrence of over-current in the transmission lines. After a distance relay, this kind of over-current relay is utilized as backup protection. The overcurrent relay will provide a signal after a predetermined amount of time delay, and the breaker will trip if the distance relay does not detect a line failure. As a result, this over-current relay functions with a time delay that is just slightly longer than the combined working times of the distance relay and the breaker. This DTOC is tested for various types of faults which are 3- phase fault occurring at load 1, 3-phase fault occurring at load 2, a 3-phase fault occurring before primary protection, and the behaviour of voltage and current with a failed primary protection. All the results will be obtained using the MATLAB/Simulink software package.","PeriodicalId":37619,"journal":{"name":"Bulletin of Electrical Engineering and Informatics","volume":"6 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Definite time over-current protection on transmission line using MATLAB/Simulink\",\"authors\":\"T. A. Taha, Hussein I. Zaynal, A. T. T. Hussain, H. Desa, Faris Hassan Taha\",\"doi\":\"10.11591/eei.v13i2.5301\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper has investigated the application of the definite time over-current (DTOC) which reacts to protect the breaker from damage during the occurrence of over-current in the transmission lines. After a distance relay, this kind of over-current relay is utilized as backup protection. The overcurrent relay will provide a signal after a predetermined amount of time delay, and the breaker will trip if the distance relay does not detect a line failure. As a result, this over-current relay functions with a time delay that is just slightly longer than the combined working times of the distance relay and the breaker. This DTOC is tested for various types of faults which are 3- phase fault occurring at load 1, 3-phase fault occurring at load 2, a 3-phase fault occurring before primary protection, and the behaviour of voltage and current with a failed primary protection. All the results will be obtained using the MATLAB/Simulink software package.\",\"PeriodicalId\":37619,\"journal\":{\"name\":\"Bulletin of Electrical Engineering and Informatics\",\"volume\":\"6 4\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of Electrical Engineering and Informatics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11591/eei.v13i2.5301\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Mathematics\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of Electrical Engineering and Informatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11591/eei.v13i2.5301","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Mathematics","Score":null,"Total":0}
Definite time over-current protection on transmission line using MATLAB/Simulink
This paper has investigated the application of the definite time over-current (DTOC) which reacts to protect the breaker from damage during the occurrence of over-current in the transmission lines. After a distance relay, this kind of over-current relay is utilized as backup protection. The overcurrent relay will provide a signal after a predetermined amount of time delay, and the breaker will trip if the distance relay does not detect a line failure. As a result, this over-current relay functions with a time delay that is just slightly longer than the combined working times of the distance relay and the breaker. This DTOC is tested for various types of faults which are 3- phase fault occurring at load 1, 3-phase fault occurring at load 2, a 3-phase fault occurring before primary protection, and the behaviour of voltage and current with a failed primary protection. All the results will be obtained using the MATLAB/Simulink software package.
期刊介绍:
Bulletin of Electrical Engineering and Informatics publishes original papers in the field of electrical, computer and informatics engineering which covers, but not limited to, the following scope: Computer Science, Computer Engineering and Informatics[...] Electronics[...] Electrical and Power Engineering[...] Telecommunication and Information Technology[...]Instrumentation and Control Engineering[...]