Agus Setyawan Setyawan, Indah Apriliana Sari Wulandari
{"title":"简历中的钢铁生产流程。Tiga Putra Jaya Sejahtra","authors":"Agus Setyawan Setyawan, Indah Apriliana Sari Wulandari","doi":"10.21070/pels.v7i0.1481","DOIUrl":null,"url":null,"abstract":"The construction services business is an activity in the economic, social and cultural fields which has an important role in achieving various targets to support the realization of national development goals. CV. Tiga Putra Jaya Sejahtra is a company engaged in the steel construction industry which provides the manufacture of fences, trellises, balconies, canopies, stair railings, rolling doors, children's toys, folding doors, light steel, galvalume, water towers, iron roofs. The purpose of this The implementation of this activity is to observe the production process of making hollow fences and the result of this activity is to find out how long it takes to make hollow fences, the costs that will be needed and the preparation of the BOM for hollow fences.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"11 17","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Steel Production Process in CV. Tiga Putra Jaya Sejahtra\",\"authors\":\"Agus Setyawan Setyawan, Indah Apriliana Sari Wulandari\",\"doi\":\"10.21070/pels.v7i0.1481\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction services business is an activity in the economic, social and cultural fields which has an important role in achieving various targets to support the realization of national development goals. CV. Tiga Putra Jaya Sejahtra is a company engaged in the steel construction industry which provides the manufacture of fences, trellises, balconies, canopies, stair railings, rolling doors, children's toys, folding doors, light steel, galvalume, water towers, iron roofs. The purpose of this The implementation of this activity is to observe the production process of making hollow fences and the result of this activity is to find out how long it takes to make hollow fences, the costs that will be needed and the preparation of the BOM for hollow fences.\",\"PeriodicalId\":491073,\"journal\":{\"name\":\"Procedia of Engineering and Life Science\",\"volume\":\"11 17\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Procedia of Engineering and Life Science\",\"FirstCategoryId\":\"0\",\"ListUrlMain\":\"https://doi.org/10.21070/pels.v7i0.1481\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Procedia of Engineering and Life Science","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.21070/pels.v7i0.1481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
建筑服务业是经济、社会和文化领域的一项活动,在实现各种目标以支持实现国家发展目标方面发挥着重要作用。简历Tiga Putra Jaya Sejahtra 是一家从事钢结构行业的公司,主要生产栅栏、花架、阳台、雨篷、楼梯扶手、卷帘门、儿童玩具、折叠门、轻钢、镀锌、水塔、铁屋顶。本次活动的目的是观察制作空心栅栏的生产过程,活动的结果是了解制作空心栅栏需要多长时间、所需成本以及空心栅栏 BOM 的编制。
Steel Production Process in CV. Tiga Putra Jaya Sejahtra
The construction services business is an activity in the economic, social and cultural fields which has an important role in achieving various targets to support the realization of national development goals. CV. Tiga Putra Jaya Sejahtra is a company engaged in the steel construction industry which provides the manufacture of fences, trellises, balconies, canopies, stair railings, rolling doors, children's toys, folding doors, light steel, galvalume, water towers, iron roofs. The purpose of this The implementation of this activity is to observe the production process of making hollow fences and the result of this activity is to find out how long it takes to make hollow fences, the costs that will be needed and the preparation of the BOM for hollow fences.