{"title":"处理系统负荷不均衡条件下的废水生物处理工艺研究","authors":"A. Safonyk, Oleg Rogov, Maksym Trokhymchuk, O. Prysiazhniuk, I. Prysiazhniuk","doi":"10.24425/jwld.2023.148456","DOIUrl":null,"url":null,"abstract":"The main purpose of the article is to develop a multifactorial model for rapid assessment of the efficiency of biological wastewater treatment reactors. A mathematical model of the process of biological wastewater treatment has been developed based on: changes in the concentration of organic contaminants in the bioreactor over time, taking into account the uneven flow of wastewater to the treatment plant, the process of substrate entering the bioreactor (different amounts may enter at different times). The software implementation of the proposed algorithm for solving the corresponding model problem in Python is carried out. The results of computer experiments on the study of the efficiency of wastewater treatment in biological treatment reactors for different operating conditions of facilities are presented. In particular, such processes were considered with taking into account the unevenness of the load, because the maximum cleaning loads are in the morning and in the evening. The task was solved to simulate a real situation and show how cleaning takes place at the maximum load at a certain time of the day. The results obtained will be useful for calculations in the design of biological treatment facilities or in the reconstruction of existing bioreactors for their prospective operation under new operating conditions.","PeriodicalId":39224,"journal":{"name":"Journal of Water and Land Development","volume":" 86","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research of the process of biological wastewater treatment under conditions of uneven load of the treatment system\",\"authors\":\"A. Safonyk, Oleg Rogov, Maksym Trokhymchuk, O. Prysiazhniuk, I. Prysiazhniuk\",\"doi\":\"10.24425/jwld.2023.148456\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The main purpose of the article is to develop a multifactorial model for rapid assessment of the efficiency of biological wastewater treatment reactors. A mathematical model of the process of biological wastewater treatment has been developed based on: changes in the concentration of organic contaminants in the bioreactor over time, taking into account the uneven flow of wastewater to the treatment plant, the process of substrate entering the bioreactor (different amounts may enter at different times). The software implementation of the proposed algorithm for solving the corresponding model problem in Python is carried out. The results of computer experiments on the study of the efficiency of wastewater treatment in biological treatment reactors for different operating conditions of facilities are presented. In particular, such processes were considered with taking into account the unevenness of the load, because the maximum cleaning loads are in the morning and in the evening. The task was solved to simulate a real situation and show how cleaning takes place at the maximum load at a certain time of the day. The results obtained will be useful for calculations in the design of biological treatment facilities or in the reconstruction of existing bioreactors for their prospective operation under new operating conditions.\",\"PeriodicalId\":39224,\"journal\":{\"name\":\"Journal of Water and Land Development\",\"volume\":\" 86\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Water and Land Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24425/jwld.2023.148456\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Water and Land Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24425/jwld.2023.148456","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

摘要

文章的主要目的是开发一个多因素模型,用于快速评估生物废水处理反应器的效率。建立废水生物处理过程数学模型的依据是:生物反应器中有机污染物浓度随时间的变化,同时考虑到废水流向处理厂的不均匀性、基质进入生物反应器的过程(不同时间进入的数量可能不同)。为解决相应的模型问题,在 Python 中对所提出的算法进行了软件实现。介绍了针对不同设施运行条件下生物处理反应器废水处理效率的计算机实验研究结果。特别是,考虑到负荷的不均匀性,因为最大清洁负荷出现在早晨和傍晚。这项任务的目的是模拟实际情况,并展示在一天中某个时间段的最大负荷下是如何进行清洁的。所获得的结果将有助于生物处理设施的设计计算或现有生物反应器的重建,以便在新的运行条件下运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research of the process of biological wastewater treatment under conditions of uneven load of the treatment system
The main purpose of the article is to develop a multifactorial model for rapid assessment of the efficiency of biological wastewater treatment reactors. A mathematical model of the process of biological wastewater treatment has been developed based on: changes in the concentration of organic contaminants in the bioreactor over time, taking into account the uneven flow of wastewater to the treatment plant, the process of substrate entering the bioreactor (different amounts may enter at different times). The software implementation of the proposed algorithm for solving the corresponding model problem in Python is carried out. The results of computer experiments on the study of the efficiency of wastewater treatment in biological treatment reactors for different operating conditions of facilities are presented. In particular, such processes were considered with taking into account the unevenness of the load, because the maximum cleaning loads are in the morning and in the evening. The task was solved to simulate a real situation and show how cleaning takes place at the maximum load at a certain time of the day. The results obtained will be useful for calculations in the design of biological treatment facilities or in the reconstruction of existing bioreactors for their prospective operation under new operating conditions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Water and Land Development
Journal of Water and Land Development Social Sciences-Development
CiteScore
2.10
自引率
0.00%
发文量
0
审稿时长
14 weeks
期刊介绍: Journal of Water and Land Development - is a peer reviewed research journal published in English. Journal has been published continually since 1998. From 2013, the journal is published quarterly in the spring, summer, autumn, and winter. In 2011 and 2012 the journal was published twice a year, and between 1998 and 2010 it was published as a yearbook. . Papers may report the results of experiments, theoretical analyses, design of machines and mechanization systems, processes or processing methods, new materials, new measurements methods or new ideas in information technology. Topics: engineering and development of the agricultural environment, water managment in rural areas and protection of water resources, natural and economic functions of grassland.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信