{"title":"两阶段比例式无等待流动车间作业完成时间变化最小化的渐近最优解","authors":"Shrikant Panwalkar, Christos Koulamas","doi":"10.1080/01605682.2024.2330614","DOIUrl":null,"url":null,"abstract":"We propose an asymptotically optimal solution for the two-stage no-wait proportionate flow shop scheduling problem with the objective of minimizing the total absolute deviation of job completion ti...","PeriodicalId":17308,"journal":{"name":"Journal of the Operational Research Society","volume":"84 1","pages":""},"PeriodicalIF":2.7000,"publicationDate":"2024-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An asymptotically optimal solution for the minimization of the variation of job completion times in two-stage proportionate no-wait flow shops\",\"authors\":\"Shrikant Panwalkar, Christos Koulamas\",\"doi\":\"10.1080/01605682.2024.2330614\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We propose an asymptotically optimal solution for the two-stage no-wait proportionate flow shop scheduling problem with the objective of minimizing the total absolute deviation of job completion ti...\",\"PeriodicalId\":17308,\"journal\":{\"name\":\"Journal of the Operational Research Society\",\"volume\":\"84 1\",\"pages\":\"\"},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2024-03-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Operational Research Society\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/01605682.2024.2330614\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Operational Research Society","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/01605682.2024.2330614","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MANAGEMENT","Score":null,"Total":0}
An asymptotically optimal solution for the minimization of the variation of job completion times in two-stage proportionate no-wait flow shops
We propose an asymptotically optimal solution for the two-stage no-wait proportionate flow shop scheduling problem with the objective of minimizing the total absolute deviation of job completion ti...
期刊介绍:
JORS is an official journal of the Operational Research Society and publishes original research papers which cover the theory, practice, history or methodology of OR.