{"title":"中国棕地修复项目的公私合作:综合风险评估方法","authors":"Qingye Han, Yan Qin, Heng Zhang, Ginger Y. Ke","doi":"10.3390/land13010056","DOIUrl":null,"url":null,"abstract":"Brownfields have been receiving significant attention all over the world because of their potential threats to the environment and public health. However, a funding shortage constitutes the main obstacle to the brownfield remediation (BR). In China, to ease financial dilemmas, the governments seek collaborations with private-sector companies, i.e., the Public Private Partnership (PPP) mode. Despite all the benefits, BR and PPP contain high risks, making stakeholders extremely cautious about investing in such projects. To support the decision-making process of the public and private parties, this paper designs a comprehensive approach to evaluate the risks of BR PPP projects in China. In more detail, several commonly used risk methods, such as TOPSIS, GRE, and FSE, are employed to construct a combined risk evaluation process, which applies multiple combined evaluation techniques to iteratively integrate individual results from those methods until a valid common result is achieved. To show the practical implementation procedure of the proposed combined approach, a hypothetical case study is performed to assess the risks of seven BR PPP projects. The analytical process also verifies that the consistency and reliability of the risk evaluation result can be achieved effectively and efficiently by jointly deploying multiple risk methods through combined techniques. The proposed decision framework facilitates a novel research idea in evaluating complicated risk situations, and can be applied to other similar scenarios where uncertainties and inconsistencies are inevitable.","PeriodicalId":37702,"journal":{"name":"Land","volume":"139 4","pages":""},"PeriodicalIF":3.2000,"publicationDate":"2024-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Public Private Partnership to Brownfield Remediation Projects in China: A Combined Risk Evaluation Approach\",\"authors\":\"Qingye Han, Yan Qin, Heng Zhang, Ginger Y. Ke\",\"doi\":\"10.3390/land13010056\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Brownfields have been receiving significant attention all over the world because of their potential threats to the environment and public health. However, a funding shortage constitutes the main obstacle to the brownfield remediation (BR). In China, to ease financial dilemmas, the governments seek collaborations with private-sector companies, i.e., the Public Private Partnership (PPP) mode. Despite all the benefits, BR and PPP contain high risks, making stakeholders extremely cautious about investing in such projects. To support the decision-making process of the public and private parties, this paper designs a comprehensive approach to evaluate the risks of BR PPP projects in China. In more detail, several commonly used risk methods, such as TOPSIS, GRE, and FSE, are employed to construct a combined risk evaluation process, which applies multiple combined evaluation techniques to iteratively integrate individual results from those methods until a valid common result is achieved. To show the practical implementation procedure of the proposed combined approach, a hypothetical case study is performed to assess the risks of seven BR PPP projects. The analytical process also verifies that the consistency and reliability of the risk evaluation result can be achieved effectively and efficiently by jointly deploying multiple risk methods through combined techniques. The proposed decision framework facilitates a novel research idea in evaluating complicated risk situations, and can be applied to other similar scenarios where uncertainties and inconsistencies are inevitable.\",\"PeriodicalId\":37702,\"journal\":{\"name\":\"Land\",\"volume\":\"139 4\",\"pages\":\"\"},\"PeriodicalIF\":3.2000,\"publicationDate\":\"2024-01-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Land\",\"FirstCategoryId\":\"93\",\"ListUrlMain\":\"https://doi.org/10.3390/land13010056\",\"RegionNum\":2,\"RegionCategory\":\"环境科学与生态学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENVIRONMENTAL STUDIES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Land","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.3390/land13010056","RegionNum":2,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENVIRONMENTAL STUDIES","Score":null,"Total":0}
Public Private Partnership to Brownfield Remediation Projects in China: A Combined Risk Evaluation Approach
Brownfields have been receiving significant attention all over the world because of their potential threats to the environment and public health. However, a funding shortage constitutes the main obstacle to the brownfield remediation (BR). In China, to ease financial dilemmas, the governments seek collaborations with private-sector companies, i.e., the Public Private Partnership (PPP) mode. Despite all the benefits, BR and PPP contain high risks, making stakeholders extremely cautious about investing in such projects. To support the decision-making process of the public and private parties, this paper designs a comprehensive approach to evaluate the risks of BR PPP projects in China. In more detail, several commonly used risk methods, such as TOPSIS, GRE, and FSE, are employed to construct a combined risk evaluation process, which applies multiple combined evaluation techniques to iteratively integrate individual results from those methods until a valid common result is achieved. To show the practical implementation procedure of the proposed combined approach, a hypothetical case study is performed to assess the risks of seven BR PPP projects. The analytical process also verifies that the consistency and reliability of the risk evaluation result can be achieved effectively and efficiently by jointly deploying multiple risk methods through combined techniques. The proposed decision framework facilitates a novel research idea in evaluating complicated risk situations, and can be applied to other similar scenarios where uncertainties and inconsistencies are inevitable.
LandENVIRONMENTAL STUDIES-Nature and Landscape Conservation
CiteScore
4.90
自引率
23.10%
发文量
1927
期刊介绍:
Land is an international and cross-disciplinary, peer-reviewed, open access journal of land system science, landscape, soil–sediment–water systems, urban study, land–climate interactions, water–energy–land–food (WELF) nexus, biodiversity research and health nexus, land modelling and data processing, ecosystem services, and multifunctionality and sustainability etc., published monthly online by MDPI. The International Association for Landscape Ecology (IALE), European Land-use Institute (ELI), and Landscape Institute (LI) are affiliated with Land, and their members receive a discount on the article processing charge.