在低水头水利工程中,组装好的巨石可防止局部冲刷

Youichi Yasuda, Shuntaro Suzuki
{"title":"在低水头水利工程中,组装好的巨石可防止局部冲刷","authors":"Youichi Yasuda, Shuntaro Suzuki","doi":"10.20849/jess.v6i2.1397","DOIUrl":null,"url":null,"abstract":"In low-head hydraulic structures, the prevention against local scouring of the river bed downstream of concrete aprons must be required during flood stages. Generally, protection blocks are installed downstream of the apron, but they do not control the flow passing through the blocks to reduce the velocity near the bottom. In most of river fields, the installation of protection blocks may not help protect the river bed. In the case of low drop-structures, hydraulic jump occurs during flood stages just below the drop-structures. The main flow near the bottom continues far downstream, and a local scouring is formed. In the case of the movable weir, a local scouring occurs downstream of the weir during flood stages. There is little information on the countermeasure against the local scouring below the movable weir during flood stages. Recently, the authors proposed the installation of consecutively assembled boulders instead of protection blocks. This paper presents the effect of installing consecutively assembled boulders on the prevention of local scouring for both low drop-structures and movable weirs. The effect of seepage on reducing flow velocity near the bottom has been shown, the comparison between the installation of protection blocks and the installation of consecutively assembled boulders has been discussed. In the case of the movable weir, the flow velocity near the bottom below the protection blocks is always larger than that below the assembled boulders, in which the effect of the deflected flow formation by the support pier is not negligible.","PeriodicalId":326567,"journal":{"name":"Journal of Environmental Science Studies","volume":"75 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Prevention Due to Assembled Boulders Against Local Scouring in Low-head Hydraulic Structures\",\"authors\":\"Youichi Yasuda, Shuntaro Suzuki\",\"doi\":\"10.20849/jess.v6i2.1397\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In low-head hydraulic structures, the prevention against local scouring of the river bed downstream of concrete aprons must be required during flood stages. Generally, protection blocks are installed downstream of the apron, but they do not control the flow passing through the blocks to reduce the velocity near the bottom. In most of river fields, the installation of protection blocks may not help protect the river bed. In the case of low drop-structures, hydraulic jump occurs during flood stages just below the drop-structures. The main flow near the bottom continues far downstream, and a local scouring is formed. In the case of the movable weir, a local scouring occurs downstream of the weir during flood stages. There is little information on the countermeasure against the local scouring below the movable weir during flood stages. Recently, the authors proposed the installation of consecutively assembled boulders instead of protection blocks. This paper presents the effect of installing consecutively assembled boulders on the prevention of local scouring for both low drop-structures and movable weirs. The effect of seepage on reducing flow velocity near the bottom has been shown, the comparison between the installation of protection blocks and the installation of consecutively assembled boulders has been discussed. In the case of the movable weir, the flow velocity near the bottom below the protection blocks is always larger than that below the assembled boulders, in which the effect of the deflected flow formation by the support pier is not negligible.\",\"PeriodicalId\":326567,\"journal\":{\"name\":\"Journal of Environmental Science Studies\",\"volume\":\"75 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Environmental Science Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20849/jess.v6i2.1397\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Environmental Science Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20849/jess.v6i2.1397","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在低水头水利工程中,必须要求在洪水期防止混凝土挡板下游河床的局部冲刷。一般情况下,会在挡水板下游安装保护块,但这些保护块并不能控制通过保护块的水流,从而降低底部附近的流速。在大多数河段,安装保护块可能无助于保护河床。在低落差结构的情况下,洪水期会在落差结构下方发生水力跃迁。底部附近的主流继续向下游延伸,形成局部冲刷。就活动堰而言,在洪水期,堰的下游会出现局部冲刷。有关洪水期活动堰下游局部冲刷的对策资料很少。最近,作者提出了安装连续组装的巨石来代替保护块的建议。本文介绍了在低落差结构和活动堰上安装连续组装的巨石对防止局部冲刷的效果。文中显示了渗流对降低底部附近流速的影响,并讨论了安装保护块与安装连续拼装巨石之间的比较。在活动堰的情况下,保护块下方的近底流速总是大于拼装巨石下方的流速,其中支撑墩形成的偏流的影响不可忽略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Prevention Due to Assembled Boulders Against Local Scouring in Low-head Hydraulic Structures
In low-head hydraulic structures, the prevention against local scouring of the river bed downstream of concrete aprons must be required during flood stages. Generally, protection blocks are installed downstream of the apron, but they do not control the flow passing through the blocks to reduce the velocity near the bottom. In most of river fields, the installation of protection blocks may not help protect the river bed. In the case of low drop-structures, hydraulic jump occurs during flood stages just below the drop-structures. The main flow near the bottom continues far downstream, and a local scouring is formed. In the case of the movable weir, a local scouring occurs downstream of the weir during flood stages. There is little information on the countermeasure against the local scouring below the movable weir during flood stages. Recently, the authors proposed the installation of consecutively assembled boulders instead of protection blocks. This paper presents the effect of installing consecutively assembled boulders on the prevention of local scouring for both low drop-structures and movable weirs. The effect of seepage on reducing flow velocity near the bottom has been shown, the comparison between the installation of protection blocks and the installation of consecutively assembled boulders has been discussed. In the case of the movable weir, the flow velocity near the bottom below the protection blocks is always larger than that below the assembled boulders, in which the effect of the deflected flow formation by the support pier is not negligible.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信