在 DH2100 系统中整合模糊分析层次过程(FAHP)方法,以实现基于风险的维护工作

Rahma Wisnu Wardana, B. Efendi, Ilyas Masudin
{"title":"在 DH2100 系统中整合模糊分析层次过程(FAHP)方法,以实现基于风险的维护工作","authors":"Rahma Wisnu Wardana, B. Efendi, Ilyas Masudin","doi":"10.17977/um054v6i1p37-46","DOIUrl":null,"url":null,"abstract":"This study discusses the integration of Fuzzy Analytical Hierarchy Process (FAHP) method in the selection of Risk Based Maintenance (RBM) policy for DH2100 Machine at PT Fajar Putra Plasindo. The objective of this research is to enhance the effectiveness of maintenance strategies and optimize decision-making in RBM policy selection. The FAHP method is employed to address the uncertainties and complexities in maintenance decision-making. The results showed that a risk value of Rp. 83,365,100 was obtained or with a risk percentage of 0.1%. the percentage of the risk exceeds the established tolerance limit. So then the selection of maintenance actions is carried out using the FAHP, from the calculation results it is found that Condition Based Maintenance maintenance actions are the right maintenance actions for the DH2100 Machine.","PeriodicalId":210860,"journal":{"name":"Jurnal Teknik Mesin dan Pembelajaran","volume":"33 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"INTEGRASI METODE FUZZY ANALYTICAL HIERARCHY PROCESS (FAHP) DALAM PEMILIHAN KEBIJAKAN RISK BASED MAINTENANCE PADA MESIN DH2100\",\"authors\":\"Rahma Wisnu Wardana, B. Efendi, Ilyas Masudin\",\"doi\":\"10.17977/um054v6i1p37-46\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study discusses the integration of Fuzzy Analytical Hierarchy Process (FAHP) method in the selection of Risk Based Maintenance (RBM) policy for DH2100 Machine at PT Fajar Putra Plasindo. The objective of this research is to enhance the effectiveness of maintenance strategies and optimize decision-making in RBM policy selection. The FAHP method is employed to address the uncertainties and complexities in maintenance decision-making. The results showed that a risk value of Rp. 83,365,100 was obtained or with a risk percentage of 0.1%. the percentage of the risk exceeds the established tolerance limit. So then the selection of maintenance actions is carried out using the FAHP, from the calculation results it is found that Condition Based Maintenance maintenance actions are the right maintenance actions for the DH2100 Machine.\",\"PeriodicalId\":210860,\"journal\":{\"name\":\"Jurnal Teknik Mesin dan Pembelajaran\",\"volume\":\"33 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Mesin dan Pembelajaran\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17977/um054v6i1p37-46\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Mesin dan Pembelajaran","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17977/um054v6i1p37-46","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究讨论了在 PT Fajar Putra Plasindo 公司 DH2100 机器的基于风险的维护(RBM)政策选择中整合模糊分析层次过程(FAHP)方法的问题。这项研究的目的是提高维护策略的有效性,优化 RBM 政策选择中的决策。采用 FAHP 方法来解决维护决策中的不确定性和复杂性。结果显示,风险值为 83,365,100 印尼盾,风险百分比为 0.1%。因此,在使用 FAHP 进行维护行动选择时,从计算结果中可以发现,基于状态维护的维护行动是 DH2100 机器的正确维护行动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
INTEGRASI METODE FUZZY ANALYTICAL HIERARCHY PROCESS (FAHP) DALAM PEMILIHAN KEBIJAKAN RISK BASED MAINTENANCE PADA MESIN DH2100
This study discusses the integration of Fuzzy Analytical Hierarchy Process (FAHP) method in the selection of Risk Based Maintenance (RBM) policy for DH2100 Machine at PT Fajar Putra Plasindo. The objective of this research is to enhance the effectiveness of maintenance strategies and optimize decision-making in RBM policy selection. The FAHP method is employed to address the uncertainties and complexities in maintenance decision-making. The results showed that a risk value of Rp. 83,365,100 was obtained or with a risk percentage of 0.1%. the percentage of the risk exceeds the established tolerance limit. So then the selection of maintenance actions is carried out using the FAHP, from the calculation results it is found that Condition Based Maintenance maintenance actions are the right maintenance actions for the DH2100 Machine.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信