将太阳能光伏发电站纳入波斯尼亚和黑塞哥维那输电系统的负载和电压条件分析

Saša Đekić
{"title":"将太阳能光伏发电站纳入波斯尼亚和黑塞哥维那输电系统的负载和电压条件分析","authors":"Saša Đekić","doi":"10.2478/bhee-2023-0008","DOIUrl":null,"url":null,"abstract":"Abstract Governments in the region are actively trying to decentralize production in the energy sector by encouraging the construction of power plants using renewable energy resources. The Network Code [1] and the Connection Regulation [2]-[4] define the procedure for issuing connection conditions to the power transmission network in Bosnia and Herzegovina. This paper will demonstrate the necessary approach to assessing the possibilities of connection and placement of the produced power and energy at a specific connection point in the early stages of planning, using the example of an 80 MW photovoltaic power plant planned for construction in the municipality of Tomislavgrad. The connection of the power plant is planned on a 110 kV voltage level network, by connecting it to the target 110 kV overhead transmission lines, following the principle of input-output.","PeriodicalId":503539,"journal":{"name":"B&H Electrical Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-11-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integration of Solar Photovoltaic Power Plants Into the Power Transmission System of Bosnia and Herzegovina Load and Voltage Conditions Analysis\",\"authors\":\"Saša Đekić\",\"doi\":\"10.2478/bhee-2023-0008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Governments in the region are actively trying to decentralize production in the energy sector by encouraging the construction of power plants using renewable energy resources. The Network Code [1] and the Connection Regulation [2]-[4] define the procedure for issuing connection conditions to the power transmission network in Bosnia and Herzegovina. This paper will demonstrate the necessary approach to assessing the possibilities of connection and placement of the produced power and energy at a specific connection point in the early stages of planning, using the example of an 80 MW photovoltaic power plant planned for construction in the municipality of Tomislavgrad. The connection of the power plant is planned on a 110 kV voltage level network, by connecting it to the target 110 kV overhead transmission lines, following the principle of input-output.\",\"PeriodicalId\":503539,\"journal\":{\"name\":\"B&H Electrical Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"B&H Electrical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/bhee-2023-0008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"B&H Electrical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/bhee-2023-0008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要 该地区各国政府正在积极努力,通过鼓励利用可再生能源建设发电厂,分散能源部门的生产。网络规范》[1] 和《连接条例》[2]-[4] 规定了波斯尼亚和黑塞哥维那输电网络连接条件的发布程序。本文将以计划在托米斯拉夫格勒市建设的 80 兆瓦光伏电站为例,说明在规划的早期阶段评估连接的可能性以及在特定连接点安置所生产电力和能源的必要方法。根据输入-输出原则,该发电厂计划与 110 千伏电压等级的网络连接,将其连接到目标 110 千伏架空输电线路上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integration of Solar Photovoltaic Power Plants Into the Power Transmission System of Bosnia and Herzegovina Load and Voltage Conditions Analysis
Abstract Governments in the region are actively trying to decentralize production in the energy sector by encouraging the construction of power plants using renewable energy resources. The Network Code [1] and the Connection Regulation [2]-[4] define the procedure for issuing connection conditions to the power transmission network in Bosnia and Herzegovina. This paper will demonstrate the necessary approach to assessing the possibilities of connection and placement of the produced power and energy at a specific connection point in the early stages of planning, using the example of an 80 MW photovoltaic power plant planned for construction in the municipality of Tomislavgrad. The connection of the power plant is planned on a 110 kV voltage level network, by connecting it to the target 110 kV overhead transmission lines, following the principle of input-output.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信