人的能量消耗对订单拣选生产率的影响:分区拣货系统中的蒙特卡罗模拟研究

Q2 Engineering
Nader A. Al Theeb, O. Al-Araidah, Malik M. Al-Ali, Adnan I. Khudair
{"title":"人的能量消耗对订单拣选生产率的影响:分区拣货系统中的蒙特卡罗模拟研究","authors":"Nader A. Al Theeb, O. Al-Araidah, Malik M. Al-Ali, Adnan I. Khudair","doi":"10.2478/emj-2023-0025","DOIUrl":null,"url":null,"abstract":"Abstract This article aims to investigate the impact of allowable human energy expenditure (HEE) of order pickers on the throughput of workers in manual order zone picking systems MOP. The method used in this research is the Monte Carlo simulation, used while considering many human and job factors. The results showed that a worker’s gender and an item’s weight have little effect on the HEE. On the other hand, body weight, walking speed, distance travelled, and the targeted zone significantly impacted the HEE, rest allowance, and throughput. For example, male pickers at a weight of 75 kg can move up to speed to 1 m/s and pick up items weighing up to 5 kg without reaching the allowable HEE rate, equal to 4.3 kcal/min, and, thus, no rest is needed. Female pickers at a weight of 75 kg reach the allowable HEE rate, equal to 2.6 kcal/min, at a very low speed of approximately 0.1 m/s when picking up items up to 5 kg, and, thus, frequent rest is needed, which leads to low throughput. To increase the throughput of female pickers, they can be assigned to pick up lighter items. Utilising Monte Carlo simulation to evaluate the HEE in MOP while considering many factors.","PeriodicalId":37237,"journal":{"name":"Engineering Management in Production and Services","volume":"11 10","pages":"12 - 24"},"PeriodicalIF":0.0000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of Human Energy Expenditure on Order Picking Productivity: A Monte Carlo Simulation Study in a Zone Picking System\",\"authors\":\"Nader A. Al Theeb, O. Al-Araidah, Malik M. Al-Ali, Adnan I. Khudair\",\"doi\":\"10.2478/emj-2023-0025\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract This article aims to investigate the impact of allowable human energy expenditure (HEE) of order pickers on the throughput of workers in manual order zone picking systems MOP. The method used in this research is the Monte Carlo simulation, used while considering many human and job factors. The results showed that a worker’s gender and an item’s weight have little effect on the HEE. On the other hand, body weight, walking speed, distance travelled, and the targeted zone significantly impacted the HEE, rest allowance, and throughput. For example, male pickers at a weight of 75 kg can move up to speed to 1 m/s and pick up items weighing up to 5 kg without reaching the allowable HEE rate, equal to 4.3 kcal/min, and, thus, no rest is needed. Female pickers at a weight of 75 kg reach the allowable HEE rate, equal to 2.6 kcal/min, at a very low speed of approximately 0.1 m/s when picking up items up to 5 kg, and, thus, frequent rest is needed, which leads to low throughput. To increase the throughput of female pickers, they can be assigned to pick up lighter items. Utilising Monte Carlo simulation to evaluate the HEE in MOP while considering many factors.\",\"PeriodicalId\":37237,\"journal\":{\"name\":\"Engineering Management in Production and Services\",\"volume\":\"11 10\",\"pages\":\"12 - 24\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Management in Production and Services\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/emj-2023-0025\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management in Production and Services","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/emj-2023-0025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

摘要 本文旨在研究订单拣选工的允许人的能量消耗(HEE)对人工订单区拣选系统澳门威尼斯人官网人吞吐量的影响。本研究采用蒙特卡洛模拟法,同时考虑了许多人为因素和工作因素。结果表明,工人的性别和物品的重量对 HEE 的影响很小。另一方面,体重、行走速度、行走距离和目标区域对 HEE、休息时间和吞吐量有很大影响。例如,体重为 75 千克的男性采摘者可以以每秒 1 米的速度采摘重达 5 千克的物品,而不会达到允许的 HEE(相当于每分钟 4.3 千卡),因此无需休息。体重为 75 千克的女拾荒者在拾取 5 千克以下的物品时,以约 0.1 米/秒的极低速度就能达到允许的 HEE 率(相当于 2.6 千卡/分钟),因此需要经常休息,从而导致吞吐量较低。为了提高女拣工的产量,可以让她们拣拾较轻的物品。利用蒙特卡洛模拟评估澳门威尼斯人线上娱乐场的 HEE,同时考虑多种因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact of Human Energy Expenditure on Order Picking Productivity: A Monte Carlo Simulation Study in a Zone Picking System
Abstract This article aims to investigate the impact of allowable human energy expenditure (HEE) of order pickers on the throughput of workers in manual order zone picking systems MOP. The method used in this research is the Monte Carlo simulation, used while considering many human and job factors. The results showed that a worker’s gender and an item’s weight have little effect on the HEE. On the other hand, body weight, walking speed, distance travelled, and the targeted zone significantly impacted the HEE, rest allowance, and throughput. For example, male pickers at a weight of 75 kg can move up to speed to 1 m/s and pick up items weighing up to 5 kg without reaching the allowable HEE rate, equal to 4.3 kcal/min, and, thus, no rest is needed. Female pickers at a weight of 75 kg reach the allowable HEE rate, equal to 2.6 kcal/min, at a very low speed of approximately 0.1 m/s when picking up items up to 5 kg, and, thus, frequent rest is needed, which leads to low throughput. To increase the throughput of female pickers, they can be assigned to pick up lighter items. Utilising Monte Carlo simulation to evaluate the HEE in MOP while considering many factors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering Management in Production and Services
Engineering Management in Production and Services Business, Management and Accounting-Management Information Systems
CiteScore
3.40
自引率
0.00%
发文量
27
审稿时长
7 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信