{"title":"加固独特建筑物和结构现场焊缝缺陷的方法","authors":"M. Farfel, S. V. Gurov, O. V. Glazunov","doi":"10.37538/2224-9494-2023-4(39)-106-119","DOIUrl":null,"url":null,"abstract":"Introduction. The article presents a new method of reinforcing field welds with defects, impermissible according to the regulation requirements. This method allows reinforcement works to be carried out while maintaining the functional purpose of a building or structure without closing for the repair.Aim. To develop a technology of reinforcing defective welds, which preserves the functional purpose of a structure during repair works without its closure.Materials and methods. Reinforcement is carried out using a sheet of high-strength steel. The reinforcing sheet must be attached to connected field elements, which excludes the defective weld from the operation. Welders are permitted to perform works after testing on control welded joints. Welds, made by a candidate welder, is cut and sent to a specialized laboratory for determining weld strength properties, impact strength of weld macro- and microstructures, as well as the order and dimensions of legs for multi-pass welds. If the obtained weld data meets the standard indicators, the candidate welder is permitted to connect the reinforcement sheets of defective field welds. After making welded joints, they must be checked by visual, instrumental and ultrasonic testing.Results. A method of reinforcing defective welds was developed and implemented. Defects in the welds appeared during the connection of field elements, whose dimensions were less than the transport size, into a single spatial system, for example, the inner contour of a dome cover. This type of reinforcement can be made without closing the building or structure for repair works.Conclusion. The method of weld reinforcement can be used to remedy impermissible derects, detected by visual, instrumental and ultrasonic testing, in any buildings and structures, including unique long-span ones, therefore ensuring their reliable and safe operation after the construction.","PeriodicalId":169749,"journal":{"name":"Bulletin of Science and Research Center of Construction","volume":"5 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Method of reinforcing defects in field welds of unique buildings and structures\",\"authors\":\"M. Farfel, S. V. Gurov, O. V. Glazunov\",\"doi\":\"10.37538/2224-9494-2023-4(39)-106-119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction. The article presents a new method of reinforcing field welds with defects, impermissible according to the regulation requirements. This method allows reinforcement works to be carried out while maintaining the functional purpose of a building or structure without closing for the repair.Aim. To develop a technology of reinforcing defective welds, which preserves the functional purpose of a structure during repair works without its closure.Materials and methods. Reinforcement is carried out using a sheet of high-strength steel. The reinforcing sheet must be attached to connected field elements, which excludes the defective weld from the operation. Welders are permitted to perform works after testing on control welded joints. Welds, made by a candidate welder, is cut and sent to a specialized laboratory for determining weld strength properties, impact strength of weld macro- and microstructures, as well as the order and dimensions of legs for multi-pass welds. If the obtained weld data meets the standard indicators, the candidate welder is permitted to connect the reinforcement sheets of defective field welds. After making welded joints, they must be checked by visual, instrumental and ultrasonic testing.Results. A method of reinforcing defective welds was developed and implemented. Defects in the welds appeared during the connection of field elements, whose dimensions were less than the transport size, into a single spatial system, for example, the inner contour of a dome cover. This type of reinforcement can be made without closing the building or structure for repair works.Conclusion. The method of weld reinforcement can be used to remedy impermissible derects, detected by visual, instrumental and ultrasonic testing, in any buildings and structures, including unique long-span ones, therefore ensuring their reliable and safe operation after the construction.\",\"PeriodicalId\":169749,\"journal\":{\"name\":\"Bulletin of Science and Research Center of Construction\",\"volume\":\"5 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of Science and Research Center of Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37538/2224-9494-2023-4(39)-106-119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of Science and Research Center of Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37538/2224-9494-2023-4(39)-106-119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

导言。文章介绍了一种加固有缺陷的现场焊缝的新方法,这些缺陷是法规要求所不允许的。这种方法可以在不关闭维修的情况下进行加固工程,同时保持建筑物或结构的功能用途。开发一种加固有缺陷焊缝的技术,该技术可在维修工程中保持结构的功能用途,而无需关闭结构。使用高强度钢板进行加固。加固钢板必须连接到相连的现场构件上,从而将有缺陷的焊缝排除在作业之外。允许焊工在对控制焊点进行测试后进行施工。候选焊工制作的焊缝将被切割并送往专业实验室,以确定焊缝强度特性、焊缝宏观和微观结构的冲击强度以及多道焊缝的焊脚顺序和尺寸。如果获得的焊缝数据符合标准指标,则允许候选焊工连接有缺陷的现场焊缝的钢筋片。焊点制作完成后,必须通过目视、仪器和超声波检测进行检查。制定并实施了加固缺陷焊缝的方法。焊缝缺陷出现在将尺寸小于运输尺寸的现场元件连接到单一空间系统(例如圆顶盖的内轮廓)的过程中。这种加固方式可以在不关闭建筑或结构进行维修的情况下进行。焊接加固法可用于补救任何建筑物和结构(包括独特的大跨度建筑物和结构)中通过目视、仪器和超声波检测发现的不允许的变形,从而确保其在施工后可靠、安全地运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Method of reinforcing defects in field welds of unique buildings and structures
Introduction. The article presents a new method of reinforcing field welds with defects, impermissible according to the regulation requirements. This method allows reinforcement works to be carried out while maintaining the functional purpose of a building or structure without closing for the repair.Aim. To develop a technology of reinforcing defective welds, which preserves the functional purpose of a structure during repair works without its closure.Materials and methods. Reinforcement is carried out using a sheet of high-strength steel. The reinforcing sheet must be attached to connected field elements, which excludes the defective weld from the operation. Welders are permitted to perform works after testing on control welded joints. Welds, made by a candidate welder, is cut and sent to a specialized laboratory for determining weld strength properties, impact strength of weld macro- and microstructures, as well as the order and dimensions of legs for multi-pass welds. If the obtained weld data meets the standard indicators, the candidate welder is permitted to connect the reinforcement sheets of defective field welds. After making welded joints, they must be checked by visual, instrumental and ultrasonic testing.Results. A method of reinforcing defective welds was developed and implemented. Defects in the welds appeared during the connection of field elements, whose dimensions were less than the transport size, into a single spatial system, for example, the inner contour of a dome cover. This type of reinforcement can be made without closing the building or structure for repair works.Conclusion. The method of weld reinforcement can be used to remedy impermissible derects, detected by visual, instrumental and ultrasonic testing, in any buildings and structures, including unique long-span ones, therefore ensuring their reliable and safe operation after the construction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信