钚燃料处理设施紧急情况下快速疏散工作人员的新型安全壳帐篷的研制

Q4 Medicine
Tomohiro SHIBANUMA, Hiroshi HIRANO, Yasuhisa KIMURA, Takahiro AITA, Masato YOSHIDA, Yuya NAGAI, Akihiro KITAMURA
{"title":"钚燃料处理设施紧急情况下快速疏散工作人员的新型安全壳帐篷的研制","authors":"Tomohiro SHIBANUMA, Hiroshi HIRANO, Yasuhisa KIMURA, Takahiro AITA, Masato YOSHIDA, Yuya NAGAI, Akihiro KITAMURA","doi":"10.5453/jhps.58.91","DOIUrl":null,"url":null,"abstract":"When severe contamination incidents occur in plutonium fuel handling facilities, containment tents are assembled to contain alpha-emitting radionuclides from spreading and rescue workers for evacuation with necessary decontamination. However, the time to assemble the conventional containment tents is too long, and the inhalation risk is proportionately high. Inadequacies in tent structures were also recognized. Therefore, we developed new containment tents that are more easily assembled and function effectively, by improving and refurbishing the shortcomings of conventional tents. The new tents were evaluated in an airborne contamination situation at the plutonium fuel fabricating facility. The tents appropriately functioned for the intended use, but other shortcomings emerged, therefore, we modified the tent structure. The new features of the developed and modified tents can be summarized as follows: 1. The time to assemble the set of tents is significantly reduced from two hours to half an hour. 2. Multiple evacuation pathways can be arranged by adding a new passage tent with zippers on all the side surfaces. 3. Various layouts can be arranged by changing the tent connection method. The tents could be used for similar but wider alpha-emitting radioactive particulate handling facilities.","PeriodicalId":37021,"journal":{"name":"Japanese Journal of Health Physics","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of New Containment Tents for Rapid Worker Evacuation from the Workspace in Emergencies at Plutonium Fuel Handling Facilities\",\"authors\":\"Tomohiro SHIBANUMA, Hiroshi HIRANO, Yasuhisa KIMURA, Takahiro AITA, Masato YOSHIDA, Yuya NAGAI, Akihiro KITAMURA\",\"doi\":\"10.5453/jhps.58.91\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When severe contamination incidents occur in plutonium fuel handling facilities, containment tents are assembled to contain alpha-emitting radionuclides from spreading and rescue workers for evacuation with necessary decontamination. However, the time to assemble the conventional containment tents is too long, and the inhalation risk is proportionately high. Inadequacies in tent structures were also recognized. Therefore, we developed new containment tents that are more easily assembled and function effectively, by improving and refurbishing the shortcomings of conventional tents. The new tents were evaluated in an airborne contamination situation at the plutonium fuel fabricating facility. The tents appropriately functioned for the intended use, but other shortcomings emerged, therefore, we modified the tent structure. The new features of the developed and modified tents can be summarized as follows: 1. The time to assemble the set of tents is significantly reduced from two hours to half an hour. 2. Multiple evacuation pathways can be arranged by adding a new passage tent with zippers on all the side surfaces. 3. Various layouts can be arranged by changing the tent connection method. The tents could be used for similar but wider alpha-emitting radioactive particulate handling facilities.\",\"PeriodicalId\":37021,\"journal\":{\"name\":\"Japanese Journal of Health Physics\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Japanese Journal of Health Physics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5453/jhps.58.91\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Medicine\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Japanese Journal of Health Physics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5453/jhps.58.91","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Medicine","Score":null,"Total":0}
引用次数: 0

摘要

当钚燃料处理设施发生严重污染事件时,就会组建遏制帐篷,以遏制释放α的放射性核素的扩散,并防止救援人员撤离并进行必要的净化。然而,组装传统的安全壳帐篷的时间太长,吸入风险也相应高。人们还认识到帐篷结构的不足之处。因此,我们通过改进和翻新传统帐篷的缺点,开发了更容易组装和有效使用的新型遏制帐篷。在钚燃料制造设施的空气污染情况下,对新帐篷进行了评估。帐篷的功能适合预期用途,但出现了其他缺点,因此,我们修改了帐篷的结构。开发和改进的帐篷的新特点可以概括为以下几点:组装一套帐篷的时间从两个小时大大减少到半个小时。2. 通过在所有侧面增加一个带拉链的新通道帐篷,可以安排多条疏散通道。3.通过改变帐篷的连接方式,可以安排各种布局。这些帐篷可以用于类似的、但范围更广的放射粒子处理设施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of New Containment Tents for Rapid Worker Evacuation from the Workspace in Emergencies at Plutonium Fuel Handling Facilities
When severe contamination incidents occur in plutonium fuel handling facilities, containment tents are assembled to contain alpha-emitting radionuclides from spreading and rescue workers for evacuation with necessary decontamination. However, the time to assemble the conventional containment tents is too long, and the inhalation risk is proportionately high. Inadequacies in tent structures were also recognized. Therefore, we developed new containment tents that are more easily assembled and function effectively, by improving and refurbishing the shortcomings of conventional tents. The new tents were evaluated in an airborne contamination situation at the plutonium fuel fabricating facility. The tents appropriately functioned for the intended use, but other shortcomings emerged, therefore, we modified the tent structure. The new features of the developed and modified tents can be summarized as follows: 1. The time to assemble the set of tents is significantly reduced from two hours to half an hour. 2. Multiple evacuation pathways can be arranged by adding a new passage tent with zippers on all the side surfaces. 3. Various layouts can be arranged by changing the tent connection method. The tents could be used for similar but wider alpha-emitting radioactive particulate handling facilities.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Japanese Journal of Health Physics
Japanese Journal of Health Physics Medicine-Radiology, Nuclear Medicine and Imaging
CiteScore
0.20
自引率
0.00%
发文量
17
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信