建设工程招投标风险管理及应对措施

None Yuhao Jiang, None Volha Holubava
{"title":"建设工程招投标风险管理及应对措施","authors":"None Yuhao Jiang, None Volha Holubava","doi":"10.31435/rsglobal_ws/30092023/8042","DOIUrl":null,"url":null,"abstract":"Bidding is a necessary procedure for the implementation of construction projects, but also an important link in the preliminary stage of construction projects, it is not only the core procedure to control the schedule, quality and cost, but also a necessary means for the procedural management of construction projects. Therefore, this paper analyses the risk of bidding for construction projects through the Gantt chart method, bidding method, and puts forward the corresponding risk management measures, the first part of the potential risk of bidding analysis, the second part of the risk management in the project bidding through the three parts of the business, internal, and supervision of risk management research, and the third part of the risk management of the measures to cope with the risk management, I hope that this paper's research can give the help related to construction project bidding.","PeriodicalId":19855,"journal":{"name":"Pharmacy World & Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"RISK MANAGEMENT AND RESPONSE MEASURES FOR BIDDING AND TENDERING IN CONSTRUCTION PROJECTS\",\"authors\":\"None Yuhao Jiang, None Volha Holubava\",\"doi\":\"10.31435/rsglobal_ws/30092023/8042\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bidding is a necessary procedure for the implementation of construction projects, but also an important link in the preliminary stage of construction projects, it is not only the core procedure to control the schedule, quality and cost, but also a necessary means for the procedural management of construction projects. Therefore, this paper analyses the risk of bidding for construction projects through the Gantt chart method, bidding method, and puts forward the corresponding risk management measures, the first part of the potential risk of bidding analysis, the second part of the risk management in the project bidding through the three parts of the business, internal, and supervision of risk management research, and the third part of the risk management of the measures to cope with the risk management, I hope that this paper's research can give the help related to construction project bidding.\",\"PeriodicalId\":19855,\"journal\":{\"name\":\"Pharmacy World & Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Pharmacy World & Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31435/rsglobal_ws/30092023/8042\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pharmacy World & Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31435/rsglobal_ws/30092023/8042","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

招投标是建设项目实施的必要程序,也是建设项目前期的重要环节,是控制进度、质量和成本的核心程序,也是建设项目程序性管理的必要手段。因此,本文通过甘特图法、招投标法对建设项目招投标风险进行分析,并提出相应的风险管理措施,第一部分对招投标的潜在风险进行分析,第二部分对项目招投标中的风险管理通过业务、内部、监督三部分对风险管理进行研究,第三部分对风险管理的应对措施进行管理;希望本文的研究能对建设工程招投标工作有所帮助。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
RISK MANAGEMENT AND RESPONSE MEASURES FOR BIDDING AND TENDERING IN CONSTRUCTION PROJECTS
Bidding is a necessary procedure for the implementation of construction projects, but also an important link in the preliminary stage of construction projects, it is not only the core procedure to control the schedule, quality and cost, but also a necessary means for the procedural management of construction projects. Therefore, this paper analyses the risk of bidding for construction projects through the Gantt chart method, bidding method, and puts forward the corresponding risk management measures, the first part of the potential risk of bidding analysis, the second part of the risk management in the project bidding through the three parts of the business, internal, and supervision of risk management research, and the third part of the risk management of the measures to cope with the risk management, I hope that this paper's research can give the help related to construction project bidding.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Pharmacy World & Science
Pharmacy World & Science 医学-药学
自引率
0.00%
发文量
0
审稿时长
>12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信