一种新的伊朗水务行业BIM战略规划开发方法

IF 1.4 4区 工程技术 Q2 ENGINEERING, MULTIDISCIPLINARY
Amin Alvanchi, Mohammad Amin Jafari, Nasim Didehvar
{"title":"一种新的伊朗水务行业BIM战略规划开发方法","authors":"Amin Alvanchi, Mohammad Amin Jafari, Nasim Didehvar","doi":"10.24200/sci.2023.60629.6903","DOIUrl":null,"url":null,"abstract":"Cost overrun and time delays in water industry construction projects persuade the authorities to improve the project management approach by adopting building information modeling (BIM). However, BIM is new in the water industry and, with the many aspects and extensive details involved, its successful implementation requires an effective strategic plan. To address this need, in this project a customized BIM strategic plan development method is proposed and followed for the water industry projects in Iran. As a result, two 5-year implementation phases are proposed and specifications of the required infrastructures are outlined. The first phase targets the implementation of BIM maturity level one in pilot projects and BIM maturity level two becomes mandatory at the end of phase two. To the best of the authors' knowledge, for the first time, a systematic method for the BIM strategic plan development in an industry, with multiple organizations involved, is proposed in this research. The two types of BIM committees introduced and utilized in this research can inspire other BIM strategic plan development efforts for large industries, e.g. transportation industry, the electric power industry, and the oil and gas industry, with multiple organizations in charge and different types of construction projects implemented.","PeriodicalId":21605,"journal":{"name":"Scientia Iranica","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A novel BIM strategic plan development method for the water industry of Iran\",\"authors\":\"Amin Alvanchi, Mohammad Amin Jafari, Nasim Didehvar\",\"doi\":\"10.24200/sci.2023.60629.6903\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Cost overrun and time delays in water industry construction projects persuade the authorities to improve the project management approach by adopting building information modeling (BIM). However, BIM is new in the water industry and, with the many aspects and extensive details involved, its successful implementation requires an effective strategic plan. To address this need, in this project a customized BIM strategic plan development method is proposed and followed for the water industry projects in Iran. As a result, two 5-year implementation phases are proposed and specifications of the required infrastructures are outlined. The first phase targets the implementation of BIM maturity level one in pilot projects and BIM maturity level two becomes mandatory at the end of phase two. To the best of the authors' knowledge, for the first time, a systematic method for the BIM strategic plan development in an industry, with multiple organizations involved, is proposed in this research. The two types of BIM committees introduced and utilized in this research can inspire other BIM strategic plan development efforts for large industries, e.g. transportation industry, the electric power industry, and the oil and gas industry, with multiple organizations in charge and different types of construction projects implemented.\",\"PeriodicalId\":21605,\"journal\":{\"name\":\"Scientia Iranica\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2023-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientia Iranica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24200/sci.2023.60629.6903\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientia Iranica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24200/sci.2023.60629.6903","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

水务行业建设项目的成本超支和工期延误促使当局通过采用建筑信息模型(BIM)来改进项目管理方法。然而,BIM在水务行业是一个新事物,涉及到许多方面和广泛的细节,它的成功实施需要一个有效的战略计划。为了满足这一需求,本项目针对伊朗的水务项目提出并遵循了定制的BIM战略计划制定方法。因此,提出了两个为期5年的实施阶段,并概述了所需基础设施的规格。第一阶段的目标是在试点项目中实施BIM成熟度一级,第二阶段结束时,BIM成熟度二级将成为强制性的。据作者所知,本研究首次提出了一个涉及多个组织的行业中BIM战略计划制定的系统方法。本研究中引入和使用的两种类型的BIM委员会可以启发其他大型行业的BIM战略规划制定工作,例如交通运输行业,电力行业,石油和天然气行业,多个组织负责,实施不同类型的建设项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A novel BIM strategic plan development method for the water industry of Iran
Cost overrun and time delays in water industry construction projects persuade the authorities to improve the project management approach by adopting building information modeling (BIM). However, BIM is new in the water industry and, with the many aspects and extensive details involved, its successful implementation requires an effective strategic plan. To address this need, in this project a customized BIM strategic plan development method is proposed and followed for the water industry projects in Iran. As a result, two 5-year implementation phases are proposed and specifications of the required infrastructures are outlined. The first phase targets the implementation of BIM maturity level one in pilot projects and BIM maturity level two becomes mandatory at the end of phase two. To the best of the authors' knowledge, for the first time, a systematic method for the BIM strategic plan development in an industry, with multiple organizations involved, is proposed in this research. The two types of BIM committees introduced and utilized in this research can inspire other BIM strategic plan development efforts for large industries, e.g. transportation industry, the electric power industry, and the oil and gas industry, with multiple organizations in charge and different types of construction projects implemented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Scientia Iranica
Scientia Iranica 工程技术-工程:综合
CiteScore
2.90
自引率
7.10%
发文量
59
审稿时长
2 months
期刊介绍: The objectives of Scientia Iranica are two-fold. The first is to provide a forum for the presentation of original works by scientists and engineers from around the world. The second is to open an effective channel to enhance the level of communication between scientists and engineers and the exchange of state-of-the-art research and ideas. The scope of the journal is broad and multidisciplinary in technical sciences and engineering. It encompasses theoretical and experimental research. Specific areas include but not limited to chemistry, chemical engineering, civil engineering, control and computer engineering, electrical engineering, material, manufacturing and industrial management, mathematics, mechanical engineering, nuclear engineering, petroleum engineering, physics, nanotechnology.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信