{"title":"用PBA法分析地铁车站侧墙开口对拱结构的影响","authors":"Yongxing Dai, Xingkai Pei, Zekun Chen, Bolun Shi, Huijian Zhang, Yujie Yang, Wei Chen","doi":"10.14311/cej.2023.03.0030","DOIUrl":null,"url":null,"abstract":"In order to meet the traffic and commercial needs, it is sometimes necessary to open the side wall of the metro station, while the current research on the mechanical properties and safety of the arch caused by the opening of the side wall of the station by pile-beam-arch (PBA) method is rarely involved. In this paper, based on the Tianhe East Station project of Guangzhou Metro Line 11 located in soft-hard uneven stratum using PBA method, the settlement law and mechanical characteristics of the arch under different side wall opening conditions is analyzed, and the influence of opening construction and opening span on the safety of arch is also further studied. The results show that the settlement caused by the opening of the side wall is mainly concentrated in the upper part of the opening area, and gradually expands around the opening area with the increase of opening span, and the maximum settlement occurs in the middle part of the arch. Opening leads to the differential settlement at both ends of the arch. With the increase in opening span, the settlement growth trend of the right side of the arch is greater than that of the left side. The opening of the side wall leads to the increase of the safety factor of the arch body and the decrease of the safety factor of the right arch foot, while the change of the safety factor of the left arch foot is not obvious, and the safety factor meets the specification requirements.","PeriodicalId":42993,"journal":{"name":"Civil Engineering Journal-Stavebni Obzor","volume":"67 1","pages":"0"},"PeriodicalIF":0.2000,"publicationDate":"2023-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of the influence of side wall opening on the arch structure of metro station using the PBA method\",\"authors\":\"Yongxing Dai, Xingkai Pei, Zekun Chen, Bolun Shi, Huijian Zhang, Yujie Yang, Wei Chen\",\"doi\":\"10.14311/cej.2023.03.0030\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to meet the traffic and commercial needs, it is sometimes necessary to open the side wall of the metro station, while the current research on the mechanical properties and safety of the arch caused by the opening of the side wall of the station by pile-beam-arch (PBA) method is rarely involved. In this paper, based on the Tianhe East Station project of Guangzhou Metro Line 11 located in soft-hard uneven stratum using PBA method, the settlement law and mechanical characteristics of the arch under different side wall opening conditions is analyzed, and the influence of opening construction and opening span on the safety of arch is also further studied. The results show that the settlement caused by the opening of the side wall is mainly concentrated in the upper part of the opening area, and gradually expands around the opening area with the increase of opening span, and the maximum settlement occurs in the middle part of the arch. Opening leads to the differential settlement at both ends of the arch. With the increase in opening span, the settlement growth trend of the right side of the arch is greater than that of the left side. The opening of the side wall leads to the increase of the safety factor of the arch body and the decrease of the safety factor of the right arch foot, while the change of the safety factor of the left arch foot is not obvious, and the safety factor meets the specification requirements.\",\"PeriodicalId\":42993,\"journal\":{\"name\":\"Civil Engineering Journal-Stavebni Obzor\",\"volume\":\"67 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.2000,\"publicationDate\":\"2023-10-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering Journal-Stavebni Obzor\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14311/cej.2023.03.0030\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Journal-Stavebni Obzor","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14311/cej.2023.03.0030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

为了满足交通和商业需要,有时需要对地铁车站侧墙进行开洞,而目前对桩梁拱(PBA)法开洞引起的车站侧墙拱的力学性能和安全性研究较少。本文以广州地铁11号线天河东站工程为例,采用PBA法分析了不同侧墙开口条件下拱体的沉降规律和力学特性,并进一步研究了开口施工和开口跨度对拱体安全性的影响。结果表明:侧墙开口引起的沉降主要集中在开口区域上部,随着开口跨度的增大,在开口区域周围沉降逐渐扩大,最大沉降发生在拱中部;开口导致拱两端的不同沉降。随着开口跨度的增大,拱的右侧沉降增长趋势大于左侧。侧墙开孔导致拱体安全系数增大,右拱脚安全系数减小,而左拱脚安全系数变化不明显,安全系数满足规范要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of the influence of side wall opening on the arch structure of metro station using the PBA method
In order to meet the traffic and commercial needs, it is sometimes necessary to open the side wall of the metro station, while the current research on the mechanical properties and safety of the arch caused by the opening of the side wall of the station by pile-beam-arch (PBA) method is rarely involved. In this paper, based on the Tianhe East Station project of Guangzhou Metro Line 11 located in soft-hard uneven stratum using PBA method, the settlement law and mechanical characteristics of the arch under different side wall opening conditions is analyzed, and the influence of opening construction and opening span on the safety of arch is also further studied. The results show that the settlement caused by the opening of the side wall is mainly concentrated in the upper part of the opening area, and gradually expands around the opening area with the increase of opening span, and the maximum settlement occurs in the middle part of the arch. Opening leads to the differential settlement at both ends of the arch. With the increase in opening span, the settlement growth trend of the right side of the arch is greater than that of the left side. The opening of the side wall leads to the increase of the safety factor of the arch body and the decrease of the safety factor of the right arch foot, while the change of the safety factor of the left arch foot is not obvious, and the safety factor meets the specification requirements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
38
审稿时长
10 weeks
期刊介绍: The Civil Engineering Journal’s objective is to present the latest progress in research and development in civil engineering. It is desired to provide free and up to date information regarding innovations in various civil engineering fields. The Civil Engineering Journal is opened for all authors worldwide that follow the journal‘s requirements (theme, template and affirmative reviews). The journal is administrated by a public university (Civil Engineering faculty, Czech Technical University in Prague) and therefore publishing is free of charge with no exceptions. Main journal themes correspond to specialization of the Civil Engineering Faculty, CTU in Prague. Namely: Applied informatics Architecture Building Constructions and Municipal Engineering Building structures Building materials and components Building physics, building services Construction technology Construction management and economics Geodesy, Cartography, GIS Geotechnics Hydraulics and hydrology Hydraulic structures Indoor environmental and building services engineering Landscape water conservation Road and railway structures Sanitary and ecological engineering Structural mechanics Urban facility management Urban design, Town and regional planning Water management, Water structures.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信