{"title":"泗水X楼工程模板使用比较","authors":"Eza Agriansyah, Eko Andi Suryo, Eva Arifi","doi":"10.21776/civense.v6i2.411","DOIUrl":null,"url":null,"abstract":"The Value Engineering method is a method that analyzes the problems of a project through a systematic and organized approach by eliminating unnecessary costs without reducing the function, appearance, quality, and reliability of the project. The object x building, which has an estimated project value of IDR 42,812,329,371 in structural work. With the estimated value of the work costing a lot, it is, therefore, necessary to make efforts to streamline costs by using the value engineering method; this study aims to choose an alternative material for it. This research method uses a Pareto chart to find the highest work value. The results of this study indicate that the beam work is priced at IDR 15,088,457,899, floor plate work of IDR 12,530,471,281, column work of IDR 10,228,438,679. The results of the analysis of alternative structural calculations using semi-system formwork and full system formwork, which initially used conventional formwork, were simulated using alternative 1, namely semi-system formwork,k and by using alternative two full system formwork. The two alternatives are applied to column, beam and floor plate formwork. So, for this building, it is recommended to replace formwork because the conventional formwork used in this building incurs a large enough price, it is necessary to save on beam parts, and it is recommended to use full system formwork because the cost of beam formwork using full system formwork is IDR 134,950 per square meter. For the floor plate formwork, it is recommended to use a full floor plate formwork system because the cost per square meter is IDR 202,360. And for columns, it is recommended to use full system formwork because the cost of column formwork if using full system formwork is IDR 115,290. And from the use of all the full-system formwork for structural work, a total cost of IDR 40,312,992,291.32.","PeriodicalId":482991,"journal":{"name":"Civil and environmental science journal","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparison of Formwork use in Building X Project in Surabaya City\",\"authors\":\"Eza Agriansyah, Eko Andi Suryo, Eva Arifi\",\"doi\":\"10.21776/civense.v6i2.411\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Value Engineering method is a method that analyzes the problems of a project through a systematic and organized approach by eliminating unnecessary costs without reducing the function, appearance, quality, and reliability of the project. The object x building, which has an estimated project value of IDR 42,812,329,371 in structural work. With the estimated value of the work costing a lot, it is, therefore, necessary to make efforts to streamline costs by using the value engineering method; this study aims to choose an alternative material for it. This research method uses a Pareto chart to find the highest work value. The results of this study indicate that the beam work is priced at IDR 15,088,457,899, floor plate work of IDR 12,530,471,281, column work of IDR 10,228,438,679. The results of the analysis of alternative structural calculations using semi-system formwork and full system formwork, which initially used conventional formwork, were simulated using alternative 1, namely semi-system formwork,k and by using alternative two full system formwork. The two alternatives are applied to column, beam and floor plate formwork. So, for this building, it is recommended to replace formwork because the conventional formwork used in this building incurs a large enough price, it is necessary to save on beam parts, and it is recommended to use full system formwork because the cost of beam formwork using full system formwork is IDR 134,950 per square meter. For the floor plate formwork, it is recommended to use a full floor plate formwork system because the cost per square meter is IDR 202,360. And for columns, it is recommended to use full system formwork because the cost of column formwork if using full system formwork is IDR 115,290. And from the use of all the full-system formwork for structural work, a total cost of IDR 40,312,992,291.32.\",\"PeriodicalId\":482991,\"journal\":{\"name\":\"Civil and environmental science journal\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil and environmental science journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21776/civense.v6i2.411\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and environmental science journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/civense.v6i2.411","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

价值工程方法是一种在不降低项目的功能、外观、质量和可靠性的情况下,通过系统和有组织的方法消除不必要的成本来分析项目问题的方法。项目x的建筑,在结构工作中估计项目价值为42,812,329,371印尼盾。由于工程的估算价值很大,因此有必要努力运用价值工程方法来简化成本;本研究旨在为其选择一种替代材料。这种研究方法使用帕累托图来找到最高的工作价值。研究结果表明,梁工程价格为15,088,457,899印尼盾,楼板工程价格为12,530,471,281印尼盾,柱工程价格为10,228,438,679印尼盾。采用半系统模板和全系统模板的替代结构计算分析结果,最初使用传统模板,使用替代方案1,即半系统模板,k和使用替代两种全系统模板进行模拟。这两种方案适用于柱、梁和楼板模板。因此,对于该建筑,建议更换模板,因为该建筑使用的常规模板价格足够大,需要节省梁件,建议使用全系统模板,因为使用全系统模板的梁模板成本为每平方米134,950印尼盾。对于楼板模板,建议使用全楼板模板系统,因为每平方米成本为202,360印尼盾。对于柱,建议使用全系统模板,因为如果使用全系统模板,柱模板的成本为115,290印尼盾。并从全部采用全体系模板进行结构工作,总费用为印尼盾40,312,992,291.32。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Comparison of Formwork use in Building X Project in Surabaya City
The Value Engineering method is a method that analyzes the problems of a project through a systematic and organized approach by eliminating unnecessary costs without reducing the function, appearance, quality, and reliability of the project. The object x building, which has an estimated project value of IDR 42,812,329,371 in structural work. With the estimated value of the work costing a lot, it is, therefore, necessary to make efforts to streamline costs by using the value engineering method; this study aims to choose an alternative material for it. This research method uses a Pareto chart to find the highest work value. The results of this study indicate that the beam work is priced at IDR 15,088,457,899, floor plate work of IDR 12,530,471,281, column work of IDR 10,228,438,679. The results of the analysis of alternative structural calculations using semi-system formwork and full system formwork, which initially used conventional formwork, were simulated using alternative 1, namely semi-system formwork,k and by using alternative two full system formwork. The two alternatives are applied to column, beam and floor plate formwork. So, for this building, it is recommended to replace formwork because the conventional formwork used in this building incurs a large enough price, it is necessary to save on beam parts, and it is recommended to use full system formwork because the cost of beam formwork using full system formwork is IDR 134,950 per square meter. For the floor plate formwork, it is recommended to use a full floor plate formwork system because the cost per square meter is IDR 202,360. And for columns, it is recommended to use full system formwork because the cost of column formwork if using full system formwork is IDR 115,290. And from the use of all the full-system formwork for structural work, a total cost of IDR 40,312,992,291.32.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信