印尼绿色收费公路开发项目项目经理胜任力对项目绩效的影响

Mairizal Mairizal, Rahmat Alifiardi, Gilang Ardi Pratama, Mohd Zaimi Abd Majid, Shek Poi Ngian
{"title":"印尼绿色收费公路开发项目项目经理胜任力对项目绩效的影响","authors":"Mairizal Mairizal, Rahmat Alifiardi, Gilang Ardi Pratama, Mohd Zaimi Abd Majid, Shek Poi Ngian","doi":"10.22441/sinergi.2023.3.005","DOIUrl":null,"url":null,"abstract":"The Green Road Construction development program is a program that has the potential to reduce carbon emissions from road construction. Currently, the Government of the Republic of Indonesia through the Ministry of Public Works and Public Housing together with the Toll Road Business Entity continues to strive to provide the best service to the community using Toll Roads that are applied to all Toll Roads in Indonesia, especially Green Toll Roads. At the implementation stage, it has not been able to run smoothly because there are several constraining factors such as social and environmental aspects. For this reason, this study aims to find out what factors are needed by a Project Manager who carries out the construction. References are taken from various journals and articles that discuss green toll roads around the world and in Indonesia. This research is a combination of qualitative and quantitative (mixed methods) by distributing questionnaires to several respondents. The results of the factor analysis show that the Project Performance factor (Y) is strongly influenced by the determinant factors namely Knowledge (X1) in terms of Time (X1.3), Cost (X1.4) and Procurement (X1.7). Henceforth, project performance (Y) is also influenced by Knowledge (X1), Skill (X2), and Tools & Techniques (X3). Meanwhile, on the other hand, the Project Performance factor (Y) is also influenced by the Green Toll Road (Z).","PeriodicalId":31051,"journal":{"name":"Jurnal Ilmiah SINERGI","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project managers competency on project performance of green toll road development project in Indonesia\",\"authors\":\"Mairizal Mairizal, Rahmat Alifiardi, Gilang Ardi Pratama, Mohd Zaimi Abd Majid, Shek Poi Ngian\",\"doi\":\"10.22441/sinergi.2023.3.005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Green Road Construction development program is a program that has the potential to reduce carbon emissions from road construction. Currently, the Government of the Republic of Indonesia through the Ministry of Public Works and Public Housing together with the Toll Road Business Entity continues to strive to provide the best service to the community using Toll Roads that are applied to all Toll Roads in Indonesia, especially Green Toll Roads. At the implementation stage, it has not been able to run smoothly because there are several constraining factors such as social and environmental aspects. For this reason, this study aims to find out what factors are needed by a Project Manager who carries out the construction. References are taken from various journals and articles that discuss green toll roads around the world and in Indonesia. This research is a combination of qualitative and quantitative (mixed methods) by distributing questionnaires to several respondents. The results of the factor analysis show that the Project Performance factor (Y) is strongly influenced by the determinant factors namely Knowledge (X1) in terms of Time (X1.3), Cost (X1.4) and Procurement (X1.7). Henceforth, project performance (Y) is also influenced by Knowledge (X1), Skill (X2), and Tools & Techniques (X3). Meanwhile, on the other hand, the Project Performance factor (Y) is also influenced by the Green Toll Road (Z).\",\"PeriodicalId\":31051,\"journal\":{\"name\":\"Jurnal Ilmiah SINERGI\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ilmiah SINERGI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22441/sinergi.2023.3.005\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah SINERGI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22441/sinergi.2023.3.005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

绿色道路建设发展计划是一个有潜力减少道路建设碳排放的计划。目前,印度尼西亚共和国政府通过公共工程和公共住房部与收费公路商业实体一起,继续努力使用适用于印度尼西亚所有收费公路的收费公路,特别是绿色收费公路,为社区提供最好的服务。在执行阶段,由于存在诸如社会和环境方面的若干制约因素,它未能顺利进行。因此,本研究旨在找出进行建设的项目经理需要哪些因素。参考文献取自讨论世界各地和印度尼西亚绿色收费公路的各种期刊和文章。本研究采用定性和定量相结合(混合方法)的方法,通过向几个受访者分发问卷。因子分析结果表明,项目绩效因子(Y)在时间(X1.3)、成本(X1.4)和采购(X1.7)方面受到决定因素即知识(X1)的强烈影响。因此,项目绩效(Y)也受到知识(X1)、技能(X2)和工具的影响。技术(X3)。同时,另一方面,项目绩效因子(Y)也受到绿色收费公路(Z)的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project managers competency on project performance of green toll road development project in Indonesia
The Green Road Construction development program is a program that has the potential to reduce carbon emissions from road construction. Currently, the Government of the Republic of Indonesia through the Ministry of Public Works and Public Housing together with the Toll Road Business Entity continues to strive to provide the best service to the community using Toll Roads that are applied to all Toll Roads in Indonesia, especially Green Toll Roads. At the implementation stage, it has not been able to run smoothly because there are several constraining factors such as social and environmental aspects. For this reason, this study aims to find out what factors are needed by a Project Manager who carries out the construction. References are taken from various journals and articles that discuss green toll roads around the world and in Indonesia. This research is a combination of qualitative and quantitative (mixed methods) by distributing questionnaires to several respondents. The results of the factor analysis show that the Project Performance factor (Y) is strongly influenced by the determinant factors namely Knowledge (X1) in terms of Time (X1.3), Cost (X1.4) and Procurement (X1.7). Henceforth, project performance (Y) is also influenced by Knowledge (X1), Skill (X2), and Tools & Techniques (X3). Meanwhile, on the other hand, the Project Performance factor (Y) is also influenced by the Green Toll Road (Z).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
32
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信