铺装垫试验项目双片式密封施工及初步性能的经验教训

IF 2.7 Q2 CONSTRUCTION & BUILDING TECHNOLOGY
DingXin Cheng, Lerose Lane
{"title":"铺装垫试验项目双片式密封施工及初步性能的经验教训","authors":"DingXin Cheng, Lerose Lane","doi":"10.3390/infrastructures8090134","DOIUrl":null,"url":null,"abstract":"Single chip seals are used by many agencies to maintain or preserve their roadways. While the construction and performance of single chip seals can be easily found from literature, the construction of double chip seals with and without paving fabric or paving mats is still not common. This paper investigates four double chip seal strategies used in a pilot project constructed on US 395 in Inyo County, California, by Caltrans. Within the double chip seal project limits, eight Performance Evaluation Sections (PESs) using four treatment strategies were established for detailed performance monitoring and evaluation: 1—a 3/8-inch asphalt rubber chip seal followed by a 1/4-inch PME chip seal without pavement-reinforcing fabric (PRF) or a paving mat as a control section; 2—a 3/8-inch PME chip seal over PRF, followed by a 1/4-inch PME chip seal; 3—a 3/8-inch PME chip seal over a paving mat, followed by a 1/4-inch PME chip seal; and 4—an asphalt rubber 3/8-inch chip seal over a paving mat, followed by a 1/4-inch PME chip seal. This pilot project was monitored during construction and evaluated 1 year later to help identify any construction issues and was used to improve the specifications and performance of Caltrans’ chip seals. This paper presents the initial findings following construction, and the one-year performance of the pilot project and lessons learned. The findings presented were accomplished by using these four treatment strategies on a highway with a very adverse high desert climate type and high traffic volumes. Project reviews are also planned for up to seven years to determine the long-term project performance.","PeriodicalId":13601,"journal":{"name":"Infrastructures","volume":null,"pages":null},"PeriodicalIF":2.7000,"publicationDate":"2023-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lessons Learned from the Construction and Initial Performance of a Double Chip Seal in a Paving Mat Pilot Project\",\"authors\":\"DingXin Cheng, Lerose Lane\",\"doi\":\"10.3390/infrastructures8090134\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Single chip seals are used by many agencies to maintain or preserve their roadways. While the construction and performance of single chip seals can be easily found from literature, the construction of double chip seals with and without paving fabric or paving mats is still not common. This paper investigates four double chip seal strategies used in a pilot project constructed on US 395 in Inyo County, California, by Caltrans. Within the double chip seal project limits, eight Performance Evaluation Sections (PESs) using four treatment strategies were established for detailed performance monitoring and evaluation: 1—a 3/8-inch asphalt rubber chip seal followed by a 1/4-inch PME chip seal without pavement-reinforcing fabric (PRF) or a paving mat as a control section; 2—a 3/8-inch PME chip seal over PRF, followed by a 1/4-inch PME chip seal; 3—a 3/8-inch PME chip seal over a paving mat, followed by a 1/4-inch PME chip seal; and 4—an asphalt rubber 3/8-inch chip seal over a paving mat, followed by a 1/4-inch PME chip seal. This pilot project was monitored during construction and evaluated 1 year later to help identify any construction issues and was used to improve the specifications and performance of Caltrans’ chip seals. This paper presents the initial findings following construction, and the one-year performance of the pilot project and lessons learned. The findings presented were accomplished by using these four treatment strategies on a highway with a very adverse high desert climate type and high traffic volumes. Project reviews are also planned for up to seven years to determine the long-term project performance.\",\"PeriodicalId\":13601,\"journal\":{\"name\":\"Infrastructures\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2023-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Infrastructures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/infrastructures8090134\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/infrastructures8090134","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

许多机构使用单片密封来维护或保护他们的道路。虽然单片式密封条的构造和性能可以很容易地从文献中找到,但双片式密封条的构造有或没有铺装织物或铺装垫仍然不常见。本文研究了Caltrans在加利福尼亚州Inyo县395号公路上建造的试点项目中使用的四种双芯片密封策略。在双切屑密封项目范围内,采用四种处理策略建立了8个性能评价段(PESs),以进行详细的性能监测和评估:1 - 3/8英寸沥青橡胶切屑密封,然后是1/4英寸PME切屑密封,不使用路面增强织物(PRF)或铺装垫作为控制段;在PRF上安装2个3/8英寸PME芯片密封,然后是1/4英寸PME芯片密封;铺地垫上3 - 3/8英寸PME芯片密封,然后是1/4英寸PME芯片密封;铺地垫上3/8英寸的沥青橡胶片密封,然后是1/4英寸的PME片密封。该试点项目在施工期间进行了监控,并在一年后进行了评估,以帮助确定施工问题,并用于改进Caltrans芯片密封的规格和性能。本文介绍了建设后的初步发现,以及试点项目一年的表现和经验教训。研究结果是通过在具有非常不利的高沙漠气候类型和高交通量的高速公路上使用这四种处理策略完成的。还计划进行长达七年的项目审查,以确定长期项目绩效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lessons Learned from the Construction and Initial Performance of a Double Chip Seal in a Paving Mat Pilot Project
Single chip seals are used by many agencies to maintain or preserve their roadways. While the construction and performance of single chip seals can be easily found from literature, the construction of double chip seals with and without paving fabric or paving mats is still not common. This paper investigates four double chip seal strategies used in a pilot project constructed on US 395 in Inyo County, California, by Caltrans. Within the double chip seal project limits, eight Performance Evaluation Sections (PESs) using four treatment strategies were established for detailed performance monitoring and evaluation: 1—a 3/8-inch asphalt rubber chip seal followed by a 1/4-inch PME chip seal without pavement-reinforcing fabric (PRF) or a paving mat as a control section; 2—a 3/8-inch PME chip seal over PRF, followed by a 1/4-inch PME chip seal; 3—a 3/8-inch PME chip seal over a paving mat, followed by a 1/4-inch PME chip seal; and 4—an asphalt rubber 3/8-inch chip seal over a paving mat, followed by a 1/4-inch PME chip seal. This pilot project was monitored during construction and evaluated 1 year later to help identify any construction issues and was used to improve the specifications and performance of Caltrans’ chip seals. This paper presents the initial findings following construction, and the one-year performance of the pilot project and lessons learned. The findings presented were accomplished by using these four treatment strategies on a highway with a very adverse high desert climate type and high traffic volumes. Project reviews are also planned for up to seven years to determine the long-term project performance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Infrastructures
Infrastructures Engineering-Building and Construction
CiteScore
5.20
自引率
7.70%
发文量
145
审稿时长
11 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信