{"title":"监测和评价对卢旺达阿加肯克地区供水项目绩效的影响","authors":"","doi":"10.53819/81018102t2203","DOIUrl":null,"url":null,"abstract":"The general objective of this research was to assess effect of monitoring and evaluation on performance of water supply projects in Gakenke District. This study had the following specific objectives: assess effect of M&amp;E planning process on performance of water supply projects in Gakenke District, find out effect of M&amp;E technical capacity on performance of water supply projects in Gakenke District, determine effect of M&amp;E resources allocation on performance of water supply projects in Gakenke District and examine effect of stakeholders’ participation in M&amp;E on performance of water supply projects in Gakenke District. 186 water project workers and head of household in Muzo, Janja, Gakenke and Ruli sector with Gakenke District officials made up the study’s population. The sample size of 127 respondents was determined by the help of Solvin’s formula. The results of the study rejected all null hypotheses (p<0.05). The research showed also that the effect of M&amp;E planning process (β=1.348, p=.000), the effect of M&amp;E technical capacity (β=.968, p=.001), the effect of allocation of resources (β=.638, p=.004), and the effect of participation of stakeholders in M&amp;E (β=.261, p=.006) have positive and significant effect on the performance of water supply projects in Gakenke District. The study recommends to the District to design M&amp;E team to manage all monitoring and evaluation activities for all the projects; to provide regular capacity building to M&amp;E staff members in order to enhance their expertise in designing and implementing M&amp;E activities; to anticipate and address potential challenges that may hinder the effective utilization of M&amp;E in improving project performance and to enhance engagement of all stakeholders in M&amp;E. Keywords: Monitoring and evaluation, Planning process, technical capacity, Resources allocation, Stakeholders’ participation, Performance of projects","PeriodicalId":480774,"journal":{"name":"Journal of entrepreneurship & project management","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effect of Monitoring and Evaluation on Performance of Water Supply Projects in Agakenke District, Rwanda\",\"authors\":\"\",\"doi\":\"10.53819/81018102t2203\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The general objective of this research was to assess effect of monitoring and evaluation on performance of water supply projects in Gakenke District. This study had the following specific objectives: assess effect of M&amp;E planning process on performance of water supply projects in Gakenke District, find out effect of M&amp;E technical capacity on performance of water supply projects in Gakenke District, determine effect of M&amp;E resources allocation on performance of water supply projects in Gakenke District and examine effect of stakeholders’ participation in M&amp;E on performance of water supply projects in Gakenke District. 186 water project workers and head of household in Muzo, Janja, Gakenke and Ruli sector with Gakenke District officials made up the study’s population. The sample size of 127 respondents was determined by the help of Solvin’s formula. The results of the study rejected all null hypotheses (p<0.05). The research showed also that the effect of M&amp;E planning process (β=1.348, p=.000), the effect of M&amp;E technical capacity (β=.968, p=.001), the effect of allocation of resources (β=.638, p=.004), and the effect of participation of stakeholders in M&amp;E (β=.261, p=.006) have positive and significant effect on the performance of water supply projects in Gakenke District. The study recommends to the District to design M&amp;E team to manage all monitoring and evaluation activities for all the projects; to provide regular capacity building to M&amp;E staff members in order to enhance their expertise in designing and implementing M&amp;E activities; to anticipate and address potential challenges that may hinder the effective utilization of M&amp;E in improving project performance and to enhance engagement of all stakeholders in M&amp;E. Keywords: Monitoring and evaluation, Planning process, technical capacity, Resources allocation, Stakeholders’ participation, Performance of projects\",\"PeriodicalId\":480774,\"journal\":{\"name\":\"Journal of entrepreneurship & project management\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of entrepreneurship & project management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53819/81018102t2203\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of entrepreneurship & project management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t2203","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的总体目的是评估监测与评价对加肯克地区供水工程绩效的影响。本研究有以下具体目标:评估M&E规划过程对嘎根克区供水工程绩效的影响,找出M&E技术能力对嘎根克区供水工程绩效的影响,确定M&E资源配置对嘎根克区供水工程绩效的影响,检验利益相关者参与M&E对嘎根克区供水工程绩效的影响。Janja, Gakenke和Ruli部门与Gakenke地区官员组成了该研究的人口。127名受访者的样本量是借助索尔文公式确定的。本研究的结果拒绝了所有的零假设(p<0.05)。研究还表明,M&E计划过程的影响(β=1.348, p= 0.000), M&E技术能力的影响(β=1.348, p= 0.000)。968, p=.001),资源配置的影响(β=. 001)。638, p=.004),利益相关者参与管理的影响;261, p=.006)对克肯克区供水工程绩效有显著的正向影响。研究建议区设计管理及评估小组,以管理所有项目的监察及评估活动;定期为管理和环境管理人员提供能力建设,以提高他们在设计和实施管理和环境管理活动方面的专业知识;预测和解决可能阻碍有效利用项目管理和环境管理来提高项目绩效的潜在挑战,并加强所有利益相关者对项目管理和环境管理的参与。关键词:监测与评价、规划过程、技术能力、资源配置、利益相关者参与、项目绩效
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Effect of Monitoring and Evaluation on Performance of Water Supply Projects in Agakenke District, Rwanda
The general objective of this research was to assess effect of monitoring and evaluation on performance of water supply projects in Gakenke District. This study had the following specific objectives: assess effect of M&E planning process on performance of water supply projects in Gakenke District, find out effect of M&E technical capacity on performance of water supply projects in Gakenke District, determine effect of M&E resources allocation on performance of water supply projects in Gakenke District and examine effect of stakeholders’ participation in M&E on performance of water supply projects in Gakenke District. 186 water project workers and head of household in Muzo, Janja, Gakenke and Ruli sector with Gakenke District officials made up the study’s population. The sample size of 127 respondents was determined by the help of Solvin’s formula. The results of the study rejected all null hypotheses (p<0.05). The research showed also that the effect of M&E planning process (β=1.348, p=.000), the effect of M&E technical capacity (β=.968, p=.001), the effect of allocation of resources (β=.638, p=.004), and the effect of participation of stakeholders in M&E (β=.261, p=.006) have positive and significant effect on the performance of water supply projects in Gakenke District. The study recommends to the District to design M&E team to manage all monitoring and evaluation activities for all the projects; to provide regular capacity building to M&E staff members in order to enhance their expertise in designing and implementing M&E activities; to anticipate and address potential challenges that may hinder the effective utilization of M&E in improving project performance and to enhance engagement of all stakeholders in M&E. Keywords: Monitoring and evaluation, Planning process, technical capacity, Resources allocation, Stakeholders’ participation, Performance of projects
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信