项目规划对基利菲县道路建设项目实施的影响

MAUREEN KIRUI, SAMSON KITHEKA, PhD
{"title":"项目规划对基利菲县道路建设项目实施的影响","authors":"MAUREEN KIRUI, SAMSON KITHEKA, PhD","doi":"10.61426/sjbcm.v10i4.2754","DOIUrl":null,"url":null,"abstract":"This study investigated the influence of project planning on implementation of road construction projects in Kilifi County. The target population comprised of 150 with a sample size of 109. The study focused on the project management team, monitoring officers, project engineers, financial officers and auditors and consultants and contractors. This study adopted descriptive research design. Stratified random sampling method was used to select relevant respondents from across the board in the various categories of the three roads agencies in Kilifi County. Structured questionnaires were used to collect primary data from respondents. Secondary data was obtained from related materials in the internet, project management journals, white papers, periodicals and books relevant to the study. Quantitative data was analyzed using SPSS version 25. Descriptive statistics was used and multiple regression analysis was used to predict the effect of project schedule, project budget, project quality and project communication on implementation of road construction projects in Kilifi County. Based on the findings, r egression and spearman’s correlation results indicated that there is a positive and significant relationship between project schedule, project budget, project quality, project communication and implementation of road construction projects in Kilifi County. The study recommended that the application of CPM as a simple network and resource-loading could help to reduce construction project delays. Secondly, cost overruns should be traced back to root causes that are often associated with the preliminary phases, project planning or design, that such root causes include; poor estimation of quantities, design variations or errors, project schedule changes, scope changes, unexpected site conditions, rising costs of materials and labour and or unforeseen events. Thirdly, part of the audit should include a review of the project staff understanding of the quality parameters or metrics and skills expertise and knowledge of the people in charge of producing or delivering the project. Lastly, project team members should use a variety of communication methods to deliver project information, including meetings, telephone calls, email, voicemail and websites. Key Terms: Project Budget, Project Communication, Project planning, Project Quality, Project Schedule CITATION : Kirui, M., & Kitheka, S. (2023). Influence of project planning on implementation of road construction projects in Kilifi County. The Strategic Journal of Business & Change Management, 10 (4), 341 – 355. http://dx.doi.org/10.61426/sjbcm.v10i4.2754.","PeriodicalId":22086,"journal":{"name":"Strategic Journal of Business & Change Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"INFLUENCE OF PROJECT PLANNING ON IMPLEMENTATION OF ROAD CONSTRUCTION PROJECTS IN KILIFI COUNTY\",\"authors\":\"MAUREEN KIRUI, SAMSON KITHEKA, PhD\",\"doi\":\"10.61426/sjbcm.v10i4.2754\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study investigated the influence of project planning on implementation of road construction projects in Kilifi County. The target population comprised of 150 with a sample size of 109. The study focused on the project management team, monitoring officers, project engineers, financial officers and auditors and consultants and contractors. This study adopted descriptive research design. Stratified random sampling method was used to select relevant respondents from across the board in the various categories of the three roads agencies in Kilifi County. Structured questionnaires were used to collect primary data from respondents. Secondary data was obtained from related materials in the internet, project management journals, white papers, periodicals and books relevant to the study. Quantitative data was analyzed using SPSS version 25. Descriptive statistics was used and multiple regression analysis was used to predict the effect of project schedule, project budget, project quality and project communication on implementation of road construction projects in Kilifi County. Based on the findings, r egression and spearman’s correlation results indicated that there is a positive and significant relationship between project schedule, project budget, project quality, project communication and implementation of road construction projects in Kilifi County. The study recommended that the application of CPM as a simple network and resource-loading could help to reduce construction project delays. Secondly, cost overruns should be traced back to root causes that are often associated with the preliminary phases, project planning or design, that such root causes include; poor estimation of quantities, design variations or errors, project schedule changes, scope changes, unexpected site conditions, rising costs of materials and labour and or unforeseen events. Thirdly, part of the audit should include a review of the project staff understanding of the quality parameters or metrics and skills expertise and knowledge of the people in charge of producing or delivering the project. Lastly, project team members should use a variety of communication methods to deliver project information, including meetings, telephone calls, email, voicemail and websites. Key Terms: Project Budget, Project Communication, Project planning, Project Quality, Project Schedule CITATION : Kirui, M., & Kitheka, S. (2023). Influence of project planning on implementation of road construction projects in Kilifi County. The Strategic Journal of Business & Change Management, 10 (4), 341 – 355. http://dx.doi.org/10.61426/sjbcm.v10i4.2754.\",\"PeriodicalId\":22086,\"journal\":{\"name\":\"Strategic Journal of Business & Change Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Strategic Journal of Business & Change Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.61426/sjbcm.v10i4.2754\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Strategic Journal of Business & Change Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.61426/sjbcm.v10i4.2754","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究调查了项目规划对基利菲县道路建设项目实施的影响。目标人群为150人,样本量为109人。这项研究的重点是项目管理队、监测干事、项目工程师、财务干事和审计员、顾问和承包商。本研究采用描述性研究设计。采用分层随机抽样的方法,在基利菲县三家公路机构的各个类别中全面抽取相关调查对象。采用结构化问卷收集调查对象的原始数据。辅助数据来源于与本研究相关的互联网、项目管理期刊、白皮书、期刊和书籍等相关资料。定量数据采用SPSS version 25进行分析。采用描述性统计和多元回归分析的方法,预测了项目进度、项目预算、项目质量和项目沟通对基利菲县道路建设项目实施的影响。基于研究结果,r回归和spearman相关结果表明,基利菲县道路建设项目的项目进度、项目预算、项目质量、项目沟通与项目实施之间存在显著的正相关关系。该研究建议,应用CPM作为一个简单的网络和资源负载,可以帮助减少建设项目的延误。其次,成本超支应追溯到根本原因,这些根本原因通常与初步阶段、项目规划或设计有关,这些根本原因包括;数量估计不足,设计变化或错误,项目进度变化,范围变化,意外的现场条件,材料和劳动力成本上升和/或不可预见的事件。第三,审计的一部分应该包括审查项目人员对质量参数或度量的理解,以及负责生产或交付项目的人员的技能、专业知识和知识。最后,项目团队成员应该使用多种沟通方式来传递项目信息,包括会议、电话、电子邮件、语音邮件和网站。关键词:项目预算,项目沟通,项目计划,项目质量,项目进度基特卡,S.(2023)。项目规划对基利菲县道路建设项目实施的影响。商业战略杂志;管理学报,2010(4),341 - 355。http://dx.doi.org/10.61426/sjbcm.v10i4.2754。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
INFLUENCE OF PROJECT PLANNING ON IMPLEMENTATION OF ROAD CONSTRUCTION PROJECTS IN KILIFI COUNTY
This study investigated the influence of project planning on implementation of road construction projects in Kilifi County. The target population comprised of 150 with a sample size of 109. The study focused on the project management team, monitoring officers, project engineers, financial officers and auditors and consultants and contractors. This study adopted descriptive research design. Stratified random sampling method was used to select relevant respondents from across the board in the various categories of the three roads agencies in Kilifi County. Structured questionnaires were used to collect primary data from respondents. Secondary data was obtained from related materials in the internet, project management journals, white papers, periodicals and books relevant to the study. Quantitative data was analyzed using SPSS version 25. Descriptive statistics was used and multiple regression analysis was used to predict the effect of project schedule, project budget, project quality and project communication on implementation of road construction projects in Kilifi County. Based on the findings, r egression and spearman’s correlation results indicated that there is a positive and significant relationship between project schedule, project budget, project quality, project communication and implementation of road construction projects in Kilifi County. The study recommended that the application of CPM as a simple network and resource-loading could help to reduce construction project delays. Secondly, cost overruns should be traced back to root causes that are often associated with the preliminary phases, project planning or design, that such root causes include; poor estimation of quantities, design variations or errors, project schedule changes, scope changes, unexpected site conditions, rising costs of materials and labour and or unforeseen events. Thirdly, part of the audit should include a review of the project staff understanding of the quality parameters or metrics and skills expertise and knowledge of the people in charge of producing or delivering the project. Lastly, project team members should use a variety of communication methods to deliver project information, including meetings, telephone calls, email, voicemail and websites. Key Terms: Project Budget, Project Communication, Project planning, Project Quality, Project Schedule CITATION : Kirui, M., & Kitheka, S. (2023). Influence of project planning on implementation of road construction projects in Kilifi County. The Strategic Journal of Business & Change Management, 10 (4), 341 – 355. http://dx.doi.org/10.61426/sjbcm.v10i4.2754.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信