基于主成分分析的环境综合治理公私合作项目生命周期风险评价

Q1 Engineering
Qiliang Hu, Harry Entebang
{"title":"基于主成分分析的环境综合治理公私合作项目生命周期风险评价","authors":"Qiliang Hu, Harry Entebang","doi":"10.5334/fce.178","DOIUrl":null,"url":null,"abstract":"Public-private partnership (PPP) projects remain one of the key initiatives of the Chinese government. The key characteristics of the PPP projects include the long construction period and large investment amount, while constant monitoring is required to determine the risks of the projects within a comprehensive environmental management framework. Over the years, the government has used the PPP model to implement various projects, capitalizing on a few methods to assess the riskiness of the entire life cycle of the comprehensive environmental PPP projects. However, we argue that the principal component analysis (PCA) can be used to determine the various factors that may have a high influence on the risk potential of PPP projects. In fact, it plays an important role in ensuring the smooth implementation of projects while reducing the losses caused by various risks. According to the risk factors of the whole life cycle of the comprehensive environmental governance PPP project, an indicator system of five first-level indicators, 18 second-level indicators, and 43 third-level indicators has been established. Principal component analysis is used to analyze the influence and weight of risk factors at each stage. The analysis shows that among the four stages, environmental pollution risk, project approval delay risk, completion risk, interest rate and financial fluctuation risk, and franchise life risk are the most influential risks in the implementation of PPP projects. Therefore, suggestions are made based on the risk factors at each stage of the comprehensive environmental management PPP project. Building on this, we argue that the ability to resist any PPP projects with higher risk can be improved, thus ensuring a smooth implementation of the project while promoting the long-term development of comprehensive environmental management PPP projects in the future.","PeriodicalId":36755,"journal":{"name":"Future Cities and Environment","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Life Cycle Risk Assessment of Public-Private Partnership Project of Comprehensive Environmental Management Based on Principal Component Analysis\",\"authors\":\"Qiliang Hu, Harry Entebang\",\"doi\":\"10.5334/fce.178\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Public-private partnership (PPP) projects remain one of the key initiatives of the Chinese government. The key characteristics of the PPP projects include the long construction period and large investment amount, while constant monitoring is required to determine the risks of the projects within a comprehensive environmental management framework. Over the years, the government has used the PPP model to implement various projects, capitalizing on a few methods to assess the riskiness of the entire life cycle of the comprehensive environmental PPP projects. However, we argue that the principal component analysis (PCA) can be used to determine the various factors that may have a high influence on the risk potential of PPP projects. In fact, it plays an important role in ensuring the smooth implementation of projects while reducing the losses caused by various risks. According to the risk factors of the whole life cycle of the comprehensive environmental governance PPP project, an indicator system of five first-level indicators, 18 second-level indicators, and 43 third-level indicators has been established. Principal component analysis is used to analyze the influence and weight of risk factors at each stage. The analysis shows that among the four stages, environmental pollution risk, project approval delay risk, completion risk, interest rate and financial fluctuation risk, and franchise life risk are the most influential risks in the implementation of PPP projects. Therefore, suggestions are made based on the risk factors at each stage of the comprehensive environmental management PPP project. Building on this, we argue that the ability to resist any PPP projects with higher risk can be improved, thus ensuring a smooth implementation of the project while promoting the long-term development of comprehensive environmental management PPP projects in the future.\",\"PeriodicalId\":36755,\"journal\":{\"name\":\"Future Cities and Environment\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Future Cities and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5334/fce.178\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Future Cities and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5334/fce.178","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

政府与社会资本合作(PPP)项目仍然是中国政府的重要举措之一。PPP项目的主要特点是建设周期长,投资金额大,需要在综合环境管理框架下对项目进行持续监测,确定项目风险。多年来,政府运用PPP模式实施各种项目,利用几种方法对综合环境PPP项目的全生命周期风险进行评估。然而,我们认为主成分分析(PCA)可以用来确定可能对PPP项目风险潜力有很大影响的各种因素。事实上,它在保证项目顺利实施的同时,也减少了各种风险带来的损失。根据综合环境治理PPP项目全生命周期的风险因素,建立了5个一级指标、18个二级指标、43个三级指标的指标体系。采用主成分分析法分析各阶段风险因素的影响和权重。分析表明,在四个阶段中,环境污染风险、项目审批延迟风险、竣工风险、利率和财务波动风险、特许经营寿命风险是PPP项目实施中影响最大的风险。因此,根据环境综合治理PPP项目各阶段的风险因素提出建议。在此基础上,我们认为可以提高对风险较高的PPP项目的抵御能力,从而保证项目的顺利实施,同时促进未来环境综合治理PPP项目的长远发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Life Cycle Risk Assessment of Public-Private Partnership Project of Comprehensive Environmental Management Based on Principal Component Analysis
Public-private partnership (PPP) projects remain one of the key initiatives of the Chinese government. The key characteristics of the PPP projects include the long construction period and large investment amount, while constant monitoring is required to determine the risks of the projects within a comprehensive environmental management framework. Over the years, the government has used the PPP model to implement various projects, capitalizing on a few methods to assess the riskiness of the entire life cycle of the comprehensive environmental PPP projects. However, we argue that the principal component analysis (PCA) can be used to determine the various factors that may have a high influence on the risk potential of PPP projects. In fact, it plays an important role in ensuring the smooth implementation of projects while reducing the losses caused by various risks. According to the risk factors of the whole life cycle of the comprehensive environmental governance PPP project, an indicator system of five first-level indicators, 18 second-level indicators, and 43 third-level indicators has been established. Principal component analysis is used to analyze the influence and weight of risk factors at each stage. The analysis shows that among the four stages, environmental pollution risk, project approval delay risk, completion risk, interest rate and financial fluctuation risk, and franchise life risk are the most influential risks in the implementation of PPP projects. Therefore, suggestions are made based on the risk factors at each stage of the comprehensive environmental management PPP project. Building on this, we argue that the ability to resist any PPP projects with higher risk can be improved, thus ensuring a smooth implementation of the project while promoting the long-term development of comprehensive environmental management PPP projects in the future.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Future Cities and Environment
Future Cities and Environment Engineering-Architecture
CiteScore
3.10
自引率
0.00%
发文量
7
审稿时长
17 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信