分析哥伦比亚加勒比地区道路建设项目的延误和费用超支情况

IF 0.7 Q3 GEOGRAPHY
Fausto A. Canales, Otto Mora, Marco Arrieta-Castro, Aníbal Moreno-Natera, Alexandre Del Savio
{"title":"分析哥伦比亚加勒比地区道路建设项目的延误和费用超支情况","authors":"Fausto A. Canales, Otto Mora, Marco Arrieta-Castro, Aníbal Moreno-Natera, Alexandre Del Savio","doi":"10.12775/bgss-2023-0025","DOIUrl":null,"url":null,"abstract":"Construction projects are constantly threatened by delays and cost overruns that might compromise their viability. Th us, identifying the leading causes of these issues based on the experience of experienced professionals is essential to planning and reducing these risks. This research evaluates the frequency and severity of variables causing delays and cost overruns in Colombian Caribbean Region road projects. Th e nine causes studied in this research were defined through a literature review, preliminary discussion and a pilot test. A survey directed to 42 road construction engineers allowed the authors to characterise these professionals’ perceptions regarding the frequency and severity of these variables in terms of delay and cost overruns, with a confi dence level of 80%. Statistical analyses were applied to the results of the survey to establish which variables generate the most signifi cant impacts when building roads and related works in the Colombian Caribbean Region","PeriodicalId":45441,"journal":{"name":"Bulletin of Geography-Socio-Economic Series","volume":null,"pages":null},"PeriodicalIF":0.7000,"publicationDate":"2023-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of delays and cost overruns of road construction projects in the Colombian Caribbean Region\",\"authors\":\"Fausto A. Canales, Otto Mora, Marco Arrieta-Castro, Aníbal Moreno-Natera, Alexandre Del Savio\",\"doi\":\"10.12775/bgss-2023-0025\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction projects are constantly threatened by delays and cost overruns that might compromise their viability. Th us, identifying the leading causes of these issues based on the experience of experienced professionals is essential to planning and reducing these risks. This research evaluates the frequency and severity of variables causing delays and cost overruns in Colombian Caribbean Region road projects. Th e nine causes studied in this research were defined through a literature review, preliminary discussion and a pilot test. A survey directed to 42 road construction engineers allowed the authors to characterise these professionals’ perceptions regarding the frequency and severity of these variables in terms of delay and cost overruns, with a confi dence level of 80%. Statistical analyses were applied to the results of the survey to establish which variables generate the most signifi cant impacts when building roads and related works in the Colombian Caribbean Region\",\"PeriodicalId\":45441,\"journal\":{\"name\":\"Bulletin of Geography-Socio-Economic Series\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.7000,\"publicationDate\":\"2023-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of Geography-Socio-Economic Series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12775/bgss-2023-0025\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"GEOGRAPHY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of Geography-Socio-Economic Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12775/bgss-2023-0025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOGRAPHY","Score":null,"Total":0}
引用次数: 0

摘要

建设项目经常受到延误和成本超支的威胁,这可能会损害它们的生存能力。因此,根据经验丰富的专业人员的经验确定这些问题的主要原因对于规划和减少这些风险至关重要。本研究评估了导致哥伦比亚加勒比地区道路项目延误和成本超支的变量的频率和严重程度。本研究通过文献综述、初步探讨和试点检验确定了研究的九个原因。一项针对42名道路施工工程师的调查使作者能够以80%的置信度描述这些专业人员对延迟和成本超支方面这些变量的频率和严重程度的看法。对调查结果进行了统计分析,以确定在哥伦比亚加勒比地区修建道路和相关工程时,哪些变量产生最显著的影响
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of delays and cost overruns of road construction projects in the Colombian Caribbean Region
Construction projects are constantly threatened by delays and cost overruns that might compromise their viability. Th us, identifying the leading causes of these issues based on the experience of experienced professionals is essential to planning and reducing these risks. This research evaluates the frequency and severity of variables causing delays and cost overruns in Colombian Caribbean Region road projects. Th e nine causes studied in this research were defined through a literature review, preliminary discussion and a pilot test. A survey directed to 42 road construction engineers allowed the authors to characterise these professionals’ perceptions regarding the frequency and severity of these variables in terms of delay and cost overruns, with a confi dence level of 80%. Statistical analyses were applied to the results of the survey to establish which variables generate the most signifi cant impacts when building roads and related works in the Colombian Caribbean Region
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.10
自引率
18.20%
发文量
30
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信