{"title":"用公平路径方法和时间成本计算完成15kv传输的时间和成本","authors":"Muhamad Eriq Ashari, Haryo Dwito Armono","doi":"10.21107/rekayasa.v16i2.20501","DOIUrl":null,"url":null,"abstract":"known, while considering both parallel and serial work. Based on the research results, the 150 kV transmission project has 13 critical paths. The acceleration scheme that significantly impacts time and cost is the acceleration during the construction phase, and changes in all resource variables (Man, Material, Machine, and Method) affect both time and cost. However, a change in a single resource variable, namely Method, may impact time but not necessarily cost.","PeriodicalId":33739,"journal":{"name":"Rekayasa","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Waktu dan Biaya Penyelesaian Proyek Transmisi 150 kV Dengan Pendekatan Critical Path Method dan Time Cost Trade Off\",\"authors\":\"Muhamad Eriq Ashari, Haryo Dwito Armono\",\"doi\":\"10.21107/rekayasa.v16i2.20501\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"known, while considering both parallel and serial work. Based on the research results, the 150 kV transmission project has 13 critical paths. The acceleration scheme that significantly impacts time and cost is the acceleration during the construction phase, and changes in all resource variables (Man, Material, Machine, and Method) affect both time and cost. However, a change in a single resource variable, namely Method, may impact time but not necessarily cost.\",\"PeriodicalId\":33739,\"journal\":{\"name\":\"Rekayasa\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Rekayasa\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21107/rekayasa.v16i2.20501\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rekayasa","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21107/rekayasa.v16i2.20501","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analisis Waktu dan Biaya Penyelesaian Proyek Transmisi 150 kV Dengan Pendekatan Critical Path Method dan Time Cost Trade Off
known, while considering both parallel and serial work. Based on the research results, the 150 kV transmission project has 13 critical paths. The acceleration scheme that significantly impacts time and cost is the acceleration during the construction phase, and changes in all resource variables (Man, Material, Machine, and Method) affect both time and cost. However, a change in a single resource variable, namely Method, may impact time but not necessarily cost.