基于项目管理知识体系的服装行业新客户验收项目风险管理应用失效模式效应分析

Diah Rahmawati, A.A.N. Perwira Redi
{"title":"基于项目管理知识体系的服装行业新客户验收项目风险管理应用失效模式效应分析","authors":"Diah Rahmawati, A.A.N. Perwira Redi","doi":"10.24123/jeb.v4i3.5726","DOIUrl":null,"url":null,"abstract":"Purpose: This research aims to identify risks at the time of fulfillment of the requirements set by the customer and determine their mitigation.
 
 Method: In order to achieve the goal, researchers use the PMBOK approach that focuses on risk management by creating WBS and RBS. From the existing risks assessed using the FMEA method by conducting a survey to get the S, O and D values then calculating the RPN. 
 
 Result: the highest RPN value in this study is 330 at risk 5.2. The understanding of PIC system and procedures in making the system, based on the result of brainstorming is decided that the mitigation is recruiting employee who is experienced in applying BSCI and factory evaluation audits due to the unavailability of employees who will become PIC compliance.","PeriodicalId":53091,"journal":{"name":"IJEBD International Journal of Entrepreneurship and Business Development","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application Failure Mode Effect Analysis for Risk Management in New Costumer Acceptance Project in Garment Industry with approaching Project Management Body of Knowledge\",\"authors\":\"Diah Rahmawati, A.A.N. Perwira Redi\",\"doi\":\"10.24123/jeb.v4i3.5726\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose: This research aims to identify risks at the time of fulfillment of the requirements set by the customer and determine their mitigation.
 
 Method: In order to achieve the goal, researchers use the PMBOK approach that focuses on risk management by creating WBS and RBS. From the existing risks assessed using the FMEA method by conducting a survey to get the S, O and D values then calculating the RPN. 
 
 Result: the highest RPN value in this study is 330 at risk 5.2. The understanding of PIC system and procedures in making the system, based on the result of brainstorming is decided that the mitigation is recruiting employee who is experienced in applying BSCI and factory evaluation audits due to the unavailability of employees who will become PIC compliance.\",\"PeriodicalId\":53091,\"journal\":{\"name\":\"IJEBD International Journal of Entrepreneurship and Business Development\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IJEBD International Journal of Entrepreneurship and Business Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24123/jeb.v4i3.5726\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IJEBD International Journal of Entrepreneurship and Business Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24123/jeb.v4i3.5726","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的:本研究旨在识别在满足客户设定的需求时的风险,并确定其缓解措施。 & # x0D;方法:为了实现目标,研究人员使用PMBOK方法,通过创建WBS和RBS来关注风险管理。利用FMEA方法对现有风险进行评估,通过调查得到S、O和D值,然后计算RPN。& # x0D;& # x0D;结果:本研究RPN最高值为330,风险5.2。根据头脑风暴的结果,对PIC系统和程序的理解决定,由于无法获得将成为PIC合规的员工,因此缓解措施是招聘在应用BSCI和工厂评估审核方面有经验的员工。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application Failure Mode Effect Analysis for Risk Management in New Costumer Acceptance Project in Garment Industry with approaching Project Management Body of Knowledge
Purpose: This research aims to identify risks at the time of fulfillment of the requirements set by the customer and determine their mitigation. Method: In order to achieve the goal, researchers use the PMBOK approach that focuses on risk management by creating WBS and RBS. From the existing risks assessed using the FMEA method by conducting a survey to get the S, O and D values then calculating the RPN. Result: the highest RPN value in this study is 330 at risk 5.2. The understanding of PIC system and procedures in making the system, based on the result of brainstorming is decided that the mitigation is recruiting employee who is experienced in applying BSCI and factory evaluation audits due to the unavailability of employees who will become PIC compliance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信