压力容器工程中时间成本权衡法的时间成本分析

Rina Sandora, Sri Puji Lestari
{"title":"压力容器工程中时间成本权衡法的时间成本分析","authors":"Rina Sandora, Sri Puji Lestari","doi":"10.36456/tibuana.6.2.7757.109-118","DOIUrl":null,"url":null,"abstract":"One of the construction companies got a Pressure Vessel project job. During the process of working on the project, it was delayed from the predetermined date so that the company had to pay a fine of 0.2% every day. So it is necessary to analyze project scheduling in order to get the optimal time and cost of working on this project. The methods used in this research are Time Cost Trade Off (TCTO), Precedence Diagram Method (PDM) and crashing. Acceleration is carried out on all critical paths contained in fabrication activities. This study uses alternatives to accelerate the addition of 50% and 75% labor. The results of this study obtained the optimal time and cost with the alternative of adding 75% labor. The resulting acceleration duration is 75 days faster than the actual duration, with costs incurred of Rp. 161,386,836, -, resulting in a 56% decrease from the actual duration cost of Rp. 286,961,745, -. Analysis of the S-curve found that the accelerated duration can be completed faster than the actual duration because, the curve line on the accelerated duration is more sloping closer to the y-axis indicating greater progress each week.","PeriodicalId":486857,"journal":{"name":"Tibuana","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of time and cost using time cost trade off method in pressure vessel project\",\"authors\":\"Rina Sandora, Sri Puji Lestari\",\"doi\":\"10.36456/tibuana.6.2.7757.109-118\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of the construction companies got a Pressure Vessel project job. During the process of working on the project, it was delayed from the predetermined date so that the company had to pay a fine of 0.2% every day. So it is necessary to analyze project scheduling in order to get the optimal time and cost of working on this project. The methods used in this research are Time Cost Trade Off (TCTO), Precedence Diagram Method (PDM) and crashing. Acceleration is carried out on all critical paths contained in fabrication activities. This study uses alternatives to accelerate the addition of 50% and 75% labor. The results of this study obtained the optimal time and cost with the alternative of adding 75% labor. The resulting acceleration duration is 75 days faster than the actual duration, with costs incurred of Rp. 161,386,836, -, resulting in a 56% decrease from the actual duration cost of Rp. 286,961,745, -. Analysis of the S-curve found that the accelerated duration can be completed faster than the actual duration because, the curve line on the accelerated duration is more sloping closer to the y-axis indicating greater progress each week.\",\"PeriodicalId\":486857,\"journal\":{\"name\":\"Tibuana\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tibuana\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36456/tibuana.6.2.7757.109-118\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tibuana","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36456/tibuana.6.2.7757.109-118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

其中一家建筑公司得到了一份压力容器项目的工作。在项目进行过程中,由于比预定日期延迟,公司不得不每天支付0.2%的罚款。因此,有必要对工程进度进行分析,以获得最优的工程时间和成本。本研究采用的方法有时间成本权衡法(TCTO)、优先图法(PDM)和碰撞法。在制造活动的所有关键路径上进行加速。本研究使用替代方案来加速增加50%和75%的劳动力。研究结果表明,在增加75%人工的情况下,获得了最优的时间和成本。由此产生的加速持续时间比实际持续时间快75天,产生的成本为161,386,836卢比,-,比实际持续时间成本286,961,745卢比,-减少了56%。对s曲线的分析发现,加速持续时间可以比实际持续时间更快地完成,因为加速持续时间上的曲线更倾斜,更接近y轴,表明每周进步更大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of time and cost using time cost trade off method in pressure vessel project
One of the construction companies got a Pressure Vessel project job. During the process of working on the project, it was delayed from the predetermined date so that the company had to pay a fine of 0.2% every day. So it is necessary to analyze project scheduling in order to get the optimal time and cost of working on this project. The methods used in this research are Time Cost Trade Off (TCTO), Precedence Diagram Method (PDM) and crashing. Acceleration is carried out on all critical paths contained in fabrication activities. This study uses alternatives to accelerate the addition of 50% and 75% labor. The results of this study obtained the optimal time and cost with the alternative of adding 75% labor. The resulting acceleration duration is 75 days faster than the actual duration, with costs incurred of Rp. 161,386,836, -, resulting in a 56% decrease from the actual duration cost of Rp. 286,961,745, -. Analysis of the S-curve found that the accelerated duration can be completed faster than the actual duration because, the curve line on the accelerated duration is more sloping closer to the y-axis indicating greater progress each week.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信