{"title":"露天采矿爆破工程对施工对象影响的设计方法","authors":"","doi":"10.46544/ams.v28i2.07","DOIUrl":null,"url":null,"abstract":"The firing of explosive charges with (millisecond) time delay gives a wide range of possibilities in designing multi-row blasting patterns and, at the same time, contributes positively to the minimization of the impact of blasting works on building infrastructure in the vicinity of mines. Selection of the appropriate millisecond delay should be based primarily on seismograms of vibrations induced during the firing of single explosive charges and analysis of the frequency structure of these vibrations. Using this type of data, the article presents a procedure for optimizing millisecond delays with the use of a computer programme dedicated to modern, electronic initiating systems that are currently applied towards obtaining a favourable vibration structure in terms of the assessment of the impact on buildings in accordance with the standard regulations applicable in Poland.","PeriodicalId":50889,"journal":{"name":"Acta Montanistica Slovaca","volume":"40 1","pages":"0"},"PeriodicalIF":2.2000,"publicationDate":"2023-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Methodology of designing blasting works in open pit mining in terms of their impact on construction objects\",\"authors\":\"\",\"doi\":\"10.46544/ams.v28i2.07\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The firing of explosive charges with (millisecond) time delay gives a wide range of possibilities in designing multi-row blasting patterns and, at the same time, contributes positively to the minimization of the impact of blasting works on building infrastructure in the vicinity of mines. Selection of the appropriate millisecond delay should be based primarily on seismograms of vibrations induced during the firing of single explosive charges and analysis of the frequency structure of these vibrations. Using this type of data, the article presents a procedure for optimizing millisecond delays with the use of a computer programme dedicated to modern, electronic initiating systems that are currently applied towards obtaining a favourable vibration structure in terms of the assessment of the impact on buildings in accordance with the standard regulations applicable in Poland.\",\"PeriodicalId\":50889,\"journal\":{\"name\":\"Acta Montanistica Slovaca\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":2.2000,\"publicationDate\":\"2023-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Acta Montanistica Slovaca\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46544/ams.v28i2.07\",\"RegionNum\":4,\"RegionCategory\":\"地球科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Montanistica Slovaca","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46544/ams.v28i2.07","RegionNum":4,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
Methodology of designing blasting works in open pit mining in terms of their impact on construction objects
The firing of explosive charges with (millisecond) time delay gives a wide range of possibilities in designing multi-row blasting patterns and, at the same time, contributes positively to the minimization of the impact of blasting works on building infrastructure in the vicinity of mines. Selection of the appropriate millisecond delay should be based primarily on seismograms of vibrations induced during the firing of single explosive charges and analysis of the frequency structure of these vibrations. Using this type of data, the article presents a procedure for optimizing millisecond delays with the use of a computer programme dedicated to modern, electronic initiating systems that are currently applied towards obtaining a favourable vibration structure in terms of the assessment of the impact on buildings in accordance with the standard regulations applicable in Poland.
期刊介绍:
Acta Montanistica Slovaca publishes high quality articles on basic and applied research in the following fields:
geology and geological survey;
mining;
Earth resources;
underground engineering and geotechnics;
mining mechanization, mining transport, deep hole drilling;
ecotechnology and mineralurgy;
process control, automation and applied informatics in raw materials extraction, utilization and processing;
other similar fields.
Acta Montanistica Slovaca is the only scientific journal of this kind in Central, Eastern and South Eastern Europe.
The submitted manuscripts should contribute significantly to the international literature, even if the focus can be regional. Manuscripts should cite the extant and relevant international literature, should clearly state what the wider contribution is (e.g. a novel discovery, application of a new technique or methodology, application of an existing methodology to a new problem), and should discuss the importance of the work in the international context.