分析了标准时间,以确定o环路安装操作员使用劳工劳工方法(案例研究)的生产率率

Andrew Sinurat, Sukanta Sukanta
{"title":"分析了标准时间,以确定o环路安装操作员使用劳工劳工方法(案例研究)的生产率率","authors":"Andrew Sinurat, Sukanta Sukanta","doi":"10.37090/indstrk.v7i3.1003","DOIUrl":null,"url":null,"abstract":"With the development of the era of globalization and technological progress, the development of a manufacturer must also increase. One way to increase labour productivity is to calculate standard time. The standard time is the time required reasonably by a normal worker to complete a job that is carried out in the best work system. The research was carried out by direct observation in the field. Observation of the standard time that occurs through a certain time interval is useful for knowing the description of the use of queues. In this study, the population was operators working at PT Y at the time of the study, while the sample used was the total time of O-Ring installation. The analysis method used in this study uses the standard time analysis method using a stopwatch. Adjustments are made as a measuring effort to normalize the average price carried out by the operator. Adjustments are taken into account because operators in the work can do inappropriately, for example too fast as if in a hurry, encounter some difficulties, and other things. Time data collection was carried out 30 times by breaking down the work into three motion elements. The results of the standard time measurement for each motion element are motion element A of 65.125 seconds, motion element B of 463.84 seconds and motion element C of 59.66 seconds. Keywords: Standard Time, Stopwatch Time Study, Work System","PeriodicalId":499831,"journal":{"name":"Industrika","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Pengukuran Waktu Baku Untuk Menentukan Tingkat Produktivitas Pada Operator Pemasangan O-Ring Menggunakan Metode Jam Henti (Studi Kasus Di PT Y)\",\"authors\":\"Andrew Sinurat, Sukanta Sukanta\",\"doi\":\"10.37090/indstrk.v7i3.1003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the development of the era of globalization and technological progress, the development of a manufacturer must also increase. One way to increase labour productivity is to calculate standard time. The standard time is the time required reasonably by a normal worker to complete a job that is carried out in the best work system. The research was carried out by direct observation in the field. Observation of the standard time that occurs through a certain time interval is useful for knowing the description of the use of queues. In this study, the population was operators working at PT Y at the time of the study, while the sample used was the total time of O-Ring installation. The analysis method used in this study uses the standard time analysis method using a stopwatch. Adjustments are made as a measuring effort to normalize the average price carried out by the operator. Adjustments are taken into account because operators in the work can do inappropriately, for example too fast as if in a hurry, encounter some difficulties, and other things. Time data collection was carried out 30 times by breaking down the work into three motion elements. The results of the standard time measurement for each motion element are motion element A of 65.125 seconds, motion element B of 463.84 seconds and motion element C of 59.66 seconds. Keywords: Standard Time, Stopwatch Time Study, Work System\",\"PeriodicalId\":499831,\"journal\":{\"name\":\"Industrika\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Industrika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37090/indstrk.v7i3.1003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Industrika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37090/indstrk.v7i3.1003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着全球化时代的发展和技术的进步,一个制造商的发展也必须加大。提高劳动生产率的一种方法是计算标准时间。标准时间是一个正常工人在最佳工作制度下完成一项工作所需的合理时间。这项研究是通过实地直接观察进行的。观察在一定时间间隔内发生的标准时间对于了解队列使用的描述是有用的。在本研究中,人口是在研究时在PT Y工作的操作员,而使用的样本是o型圈安装的总时间。本研究使用的分析方法是使用秒表的标准时间分析方法。调整是作为一种衡量努力,以使运营商执行的平均价格正常化。调整时要考虑到操作人员在工作中可能做得不恰当,比如速度过快好像匆匆忙忙,遇到一些困难等事情。通过将工作分解为三个运动元素,进行了30次时间数据收集。各运动元素的标准时间测量结果为运动元素A 65.125秒,运动元素B 463.84秒,运动元素C 59.66秒。关键词:标准时间,秒表时间学习,工作系统
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Pengukuran Waktu Baku Untuk Menentukan Tingkat Produktivitas Pada Operator Pemasangan O-Ring Menggunakan Metode Jam Henti (Studi Kasus Di PT Y)
With the development of the era of globalization and technological progress, the development of a manufacturer must also increase. One way to increase labour productivity is to calculate standard time. The standard time is the time required reasonably by a normal worker to complete a job that is carried out in the best work system. The research was carried out by direct observation in the field. Observation of the standard time that occurs through a certain time interval is useful for knowing the description of the use of queues. In this study, the population was operators working at PT Y at the time of the study, while the sample used was the total time of O-Ring installation. The analysis method used in this study uses the standard time analysis method using a stopwatch. Adjustments are made as a measuring effort to normalize the average price carried out by the operator. Adjustments are taken into account because operators in the work can do inappropriately, for example too fast as if in a hurry, encounter some difficulties, and other things. Time data collection was carried out 30 times by breaking down the work into three motion elements. The results of the standard time measurement for each motion element are motion element A of 65.125 seconds, motion element B of 463.84 seconds and motion element C of 59.66 seconds. Keywords: Standard Time, Stopwatch Time Study, Work System
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信