在计划阶段细化/验证早期概率软件项目进度表

Donghwoon Kwon, R. Hammell
{"title":"在计划阶段细化/验证早期概率软件项目进度表","authors":"Donghwoon Kwon, R. Hammell","doi":"10.1109/SNPD.2014.6888712","DOIUrl":null,"url":null,"abstract":"Previous research proposed a framework for the objective and accurate estimation of software project schedules in the proposal preparation stage of large-sized software development projects. A probabilistic approach was used to take into account the uncertainty inherent in the early stage of such projects. This work illustrates how to use the framework in the later planning stage when additional, more detailed information is available via the design documentation. The process continues to use the International Function Point User Group (IFPUG) function point analysis and the International Software Benchmarking Standards Group (ISBSG) regression equations to calculate project size and resource effort, but substitutes the more accurate adjusted function point information for the previously used unadjusted function point data. The use of the proposed framework in the planning stage provides for the reassessment, verification and/or refinement of the estimated schedule produced in the early stage.","PeriodicalId":272932,"journal":{"name":"15th IEEE/ACIS International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing (SNPD)","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Refinement/verification of early stage probabilistic software project schedules in the planning stage\",\"authors\":\"Donghwoon Kwon, R. Hammell\",\"doi\":\"10.1109/SNPD.2014.6888712\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Previous research proposed a framework for the objective and accurate estimation of software project schedules in the proposal preparation stage of large-sized software development projects. A probabilistic approach was used to take into account the uncertainty inherent in the early stage of such projects. This work illustrates how to use the framework in the later planning stage when additional, more detailed information is available via the design documentation. The process continues to use the International Function Point User Group (IFPUG) function point analysis and the International Software Benchmarking Standards Group (ISBSG) regression equations to calculate project size and resource effort, but substitutes the more accurate adjusted function point information for the previously used unadjusted function point data. The use of the proposed framework in the planning stage provides for the reassessment, verification and/or refinement of the estimated schedule produced in the early stage.\",\"PeriodicalId\":272932,\"journal\":{\"name\":\"15th IEEE/ACIS International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing (SNPD)\",\"volume\":\"81 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"15th IEEE/ACIS International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing (SNPD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SNPD.2014.6888712\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"15th IEEE/ACIS International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing (SNPD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SNPD.2014.6888712","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在大型软件开发项目的提案准备阶段,已有的研究提出了一个客观、准确估算软件项目进度的框架。采用了一种概率方法来考虑此类项目早期阶段固有的不确定性。当通过设计文档可以获得额外的、更详细的信息时,这项工作说明了如何在后期规划阶段使用框架。该过程继续使用国际功能点用户组(IFPUG)功能点分析和国际软件基准标准组(ISBSG)回归方程来计算项目规模和资源工作量,但是用更准确的调整功能点信息代替以前使用的未调整功能点数据。在规划阶段使用拟议的框架可重新评估、核实和/或改进在早期阶段产生的估计时间表。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Refinement/verification of early stage probabilistic software project schedules in the planning stage
Previous research proposed a framework for the objective and accurate estimation of software project schedules in the proposal preparation stage of large-sized software development projects. A probabilistic approach was used to take into account the uncertainty inherent in the early stage of such projects. This work illustrates how to use the framework in the later planning stage when additional, more detailed information is available via the design documentation. The process continues to use the International Function Point User Group (IFPUG) function point analysis and the International Software Benchmarking Standards Group (ISBSG) regression equations to calculate project size and resource effort, but substitutes the more accurate adjusted function point information for the previously used unadjusted function point data. The use of the proposed framework in the planning stage provides for the reassessment, verification and/or refinement of the estimated schedule produced in the early stage.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信